Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Project  





2 Route  





3 See also  





4 References  














TamirabaraniNambiar Link Canal







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Tamirabarani–Nambiar Link Canal is a proposed canal in the south Indian state of Tamil Nadu which will link Tamirabarani, Karumeniyar and Nambiyar rivers. Tamil Nadu depends heavily on water from the rivers originating from the neighbouring states of Kerala and Karnataka. The state government has envisioned a project which should potentially benefit the drier regions of the Tirunelveli and Tuticorin districts of the state. The project is expected to use the 13,000 mcft surplus water in Tamirabarani river.[1][2][3]

Project[edit]

6,038 hectares of land will benefit by irrigation and 17,002 hectares of land will benefit from the ground water being recharged. 694 hectares of land will be acquired from Tirunelveli district and 106 hectares will be acquired from Tuticorin district for the implementation of the project.

Route[edit]

The water will be diverted from Tamirabarani river at the third anaicut at the confluence of Manimutharu and Papanasam rivers through the existing Kannadian canal for about 37 km. A new barrage will be constructed 6.4 km downstream to divert the water further which will be linked with Kannadian canal and the new canal will run for about 73 km till it reaches Thisayanvilai near to the Gulf of Mannar. A barrage of several small interlinking canal across this canal is additionally expected to benefit more land.

See also[edit]

Sethu Canal

References[edit]

  • ^ "River interlinking must be a national priority". businessstandard.com. Business Standard. Retrieved 13 February 2016.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Tamirabarani–Nambiar_Link_Canal&oldid=1220092959"

    Categories: 
    Rivers of Tamil Nadu
    Canals in Tamil Nadu
    Proposed canals
    Proposed infrastructure in Tamil Nadu
    Hidden categories: 
    All articles with dead external links
    Articles with dead external links from April 2024
    Articles lacking in-text citations from July 2020
    All articles lacking in-text citations
    Use dmy dates from July 2020
    Use Indian English from July 2020
    All Wikipedia articles written in Indian English
    Tamil Nadu articles missing geocoordinate data
    All articles needing coordinates
    Articles missing coordinates without coordinates on Wikidata
     



    This page was last edited on 21 April 2024, at 19:36 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki