1 Design  





2 Impacts  



2.1  Social  





2.2  Environmental  







3 See also  





4 References  














Teles Pires Dam






Deutsch
Français
مصرى
Português
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 9°2026S 56°4637W / 9.34056°S 56.77694°W / -9.34056; -56.77694
 

From Wikipedia, the free encyclopedia
 


Teles Pires Dam
Teles Pires Dam is located in Brazil
Teles Pires Dam

Location of the Teles Pires Dam in Brazil

Official nameUsina Hidrelétrica Teles Pires
LocationParanaíta, Mato Grosso and Pará, Brazil
Coordinates9°20′26S 56°46′37W / 9.34056°S 56.77694°W / -9.34056; -56.77694
Construction beganJuly 2011
Opening dateSeptember 2016[1]
Construction costUS$1.62 billion (R$ 3.3 billion)
Owner(s)Iberdrola Neoenergia Iberdrola
Operator(s)Iberdrola Neoenergia Iberdrola
Dam and spillways
Type of damGravity, composite
ImpoundsTeles Pires
Height80 m (262 ft)
Length860 m (2,822 ft)
Spillway typeGate-controlled
Spillway capacity13,704 m3/s (483,952 cu ft/s)
Reservoir
Total capacity0.99722 km3 (997,220,000 m3)
Surface area151 km2 (58 sq mi)
Maximum water depth6.6 m (22 ft) (average)
Normal elevation220 m (722 ft)
Power Station
Operator(s)ANEEL
Hydraulic head54.57 m (179 ft)
Turbines5 x 364 MW (488,000 hp) vertical Francis turbines
Installed capacity1,820 MW (2,440,000 hp)
Website
www.neoenergia.com/section/noticias_interna_en.asp?news=10054
River flow 2261 m3/s average

The Teles Pires Dam is a run-of-the-river hydroelectric dam on the Teles Pires River, 330 km (205 mi) upstream of the confluence with the Tapajós river, on the border of the Brazilian states of Mato Grosso and Pará. The 80-metre (260 ft) dam impounds a 150-square-kilometre (58 sq mi) reservoir (55 square kilometres (21 sq mi) original riverbed and 95 square kilometres (37 sq mi) inundated area), 84% in Mato Grosso state (Paranaíta district) and 16% in Para state (Jacareacanga district).[2]

The dam is part of a planned six-power-plant "Hidrovia Tapajos/Teles Pires" project to create a navigable waterway connecting the interior of Brazil to the Atlantic Ocean. The waterway will consist of six dams on the Teles Pires river—the 53-megawatt (71,000 hp) Magessi Dam, 430-megawatt (580,000 hp) Sinop Dam, 342-megawatt (459,000 hp) Colider Dam, 1,820-megawatt (2,440,000 hp) Teles Pires Dam, and 746-megawatt (1,000,000 hp) Sao Manoel Dam—and the 230-megawatt (310,000 hp) Foz do Apiacas Dam on the Apiacas river. Smaller upstream dams are still in the planning stages.[3]

Design

[edit]

The Teles Pires Dam is a gravity dam constructed of composite materials layered on a roller-compacted concrete core, located on the Teles Pires river 330 kilometres (210 mi) upstream of the confluence with the Tapajos river, on the border between the Brazilian states of Mato Grosso and Para.[4]

Impacts

[edit]

Brazilian law requires water impoundments to undergo an approval process to ensure that each project meets environmental, social, political, and safety criteria. [citation needed]

Social

[edit]

The most frequent objection is that the dam builders failed to adequately consult with indigenous peoples, as required by law. The Brazilian government indigenous protection foundation FUNAI predicts that there may be un-contacted indigenous populations in the region that will be affected by the dam.[5] On March 30, 2012, a judge suspended construction of the Teles Pires Dam to preserve a waterfall that is considered sacred by an indigenous tribe.[6]

Environmental

[edit]

The Teles Pires Dam does not impound a large reservoir because it is a run-of-the-river project. The dam also feature significant environmental remediation efforts. As a consequence, there has not been strong environmental opposition to the implementation of the Teles Pires Dam.[7] On 17 March 2015 an agreement was made to compensate the public for the irreversible negative environmental impacts of the project through payment of R$500,000 for use by the Sucunduri State Park.[8]

See also

[edit]

  • iconWater portal
  • iconRenewable energy portal
  • References

    [edit]
  • ^ "Hidreletrica Teles Pires Mato Grosso – Brasil" (in Portuguese). Neoenergia. Archived from the original on 30 May 2014. Retrieved 24 August 2012.
  • ^ "Hidrovia Tajpos/Teles Pires" (PDF) (in Portuguese). Archived from the original (PDF) on 11 March 2013. Retrieved 24 August 2012.
  • ^ "Hidreletrica Teles Pires Mato Grosso – Brasil" (in Portuguese). Neoenergia. Archived from the original on 30 May 2014. Retrieved 24 August 2012.
  • ^ "UHE Teles Pires: Projecto Basico Ambiental (IBAMA)" (PDF) (in Portuguese). IBAMA. Retrieved 24 August 2012.
  • ^ "Judge Suspends Dam in the Amazon". International Rivers. Retrieved 24 August 2012.
  • ^ "Environmental Impact Statement (RIMA): Hidreletrica Teles Pires" (PDF) (in Portuguese). Neoenergia. Archived from the original (PDF) on 6 August 2016. Retrieved 24 August 2012.
  • ^ "Historico Juridico", PES do Sucunduri (in Portuguese), ISA: Instituto Socioambiental, retrieved 2016-07-10

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Teles_Pires_Dam&oldid=1186030001"

    Categories: 
    Dams in Mato Grosso
    Hydroelectric power stations in Brazil
    Run-of-the-river power stations
    Roller-compacted concrete dams
    Gravity dams
    Dams in Pará
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    CS1 Portuguese-language sources (pt)
    Articles with short description
    Short description is different from Wikidata
    Coordinates on Wikidata
    All articles with unsourced statements
    Articles with unsourced statements from November 2018
     



    This page was last edited on 20 November 2023, at 13:57 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki