Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Background  





2 History  



2.1  Design  





2.2  Construction  







3 Rolling stock  





4 Stations  





5 Planned extension  





6 See also  





7 References  





8 External links  














Tempe Streetcar







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Route map: 


From Wikipedia, the free encyclopedia
 


Tempe Streetcar
Overview
OwnerCity of Tempe
LocaleTempe, Arizona, United States
Stations14
Websitewww.tempe.gov/streetcar
Service
TypeStreetcar
SystemValley Metro Rail
Services1
Operator(s)Valley Metro
Rolling stock6Brookville Liberty Modern Streetcars
History
OpenedMay 20, 2022 (2022-05-20)[1]
Technical
Line length3 mi (4.8 km)
Number of tracks2
CharacterStreetcar in mixed traffic
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line750 V DC + battery

Route map

Map Tempe Streetcar highlighted in green


Rio East-Dobson Extension (planned)

Marina Heights / Rio Salado

Hayden Ferry / Rio Salado

Tempe Beach Park / Rio Salado

Mill Avenue/Third Street

5th Street | 6th Street

University Dr / Ash

9th St / Mill

11th St / Mill

College Ave / Apache

Paseo del Saber / Apache

Rural / Apache

Dorsey/Apache Boulevard


Handicapped/disabled access All stations are accessible
  • talk
  • edit
  • The Tempe Streetcar, referred to as the Streetcar Line on regional transit maps, is a streetcar extension of Phoenix's Valley Metro Rail system. Construction began in 2017,[2] and the line opened for service on May 20, 2022.[1] It serves 14 stops across three miles of track serving various parts of the city's downtown, as well as the Tempe campus of Arizona State University, with the Valley Metro Rail main line.[3][4][5]

    Background[edit]

    The Tempe Streetcar is a joint project between Valley Metro and the City of Tempe Public Works Department and consists of 14 stops, running from Dorsey Lane west on Apache Boulevard, then north on Mill Avenue.[6] From there, it loops around Downtown Tempe along Mill and Ash avenues.[7] The route continues along Rio Salado Parkway to Marina Heights, with possible extensions into the city of Mesa under consideration and evaluation. A transfer from light rail to the streetcar at the 3rd Street station permits travel to Gammage Memorial AuditoriumatArizona State University to the south and the Hayden Ferry and Marina Heights office complexes to the north.

    Tempe Streetcar #183 heading southeast on Apache Blvd around ASU Gammage

    Construction cost approximately $200 million and will be funded using the Proposition 400 sales tax and federal grants. In February 2016, the project was identified in President Barack Obama's budget for Fiscal Year 2017. A total of $75 million was dedicated to the project and would supplement the Proposition 400 funds, as well as local funds and other federal grant funds.[8] The final 2017 budget, approved in May 2017 under President Donald Trump, included $50 million.[9]

    History[edit]

    Design[edit]

    In December 2016, Valley Metro selected Stantec Consulting Services for design work to be completed in 2017, allowing construction to start later in the year. Stantec has designed other streetcar projects in the United States and contributed to the design of the Valley Metro light rail system.[10] In May 2018, the design was finalized.

    The streetcar was designed to be able to travel on the light rail line and to use those tracks to travel to the Operations & Maintenance Center.

    Construction[edit]

    Construction began on June 1, 2017, with utility relocation, which made way for tracks to be laid.[11][12] In August 2018, Valley Metro received approval from the Federal Transit Administration (FTA) to begin the initial phase of significant construction on the Tempe Streetcar. With this approval, Valley Metro began work on building the system's rail trackway, power systems and street improvements.[13]

    The line opened for service on May 20, 2022.[1][14]

    Rolling stock[edit]

    In 2011, Kinki Sharyo offered a demonstration model of its ameriTRAM vehicle, to allow members of the public to provide feedback on the vehicle.[15]

    Valley Metro issued an RFP (request for proposals) to obtain vehicles for this route in the summer of 2016.[16] Potential suppliers originally included Alstom, Bombardier, CAF USA, Kinki Sharyo, Siemens and TIG/m. Vehicle options for this line included a combination of battery power, overhead catenary or on-board hydrogen fuel system.[17][18]

    Brookville Equipment Corporation was awarded the $33 million contract for six Liberty Streetcars in 2017.[19] The first streetcar vehicle was delivered on March 14, 2021.

    Stations[edit]

    The Tempe Streetcar has a total of 14 stops.[20][21]

    9th Street/Mill Avenue station platform
    Station[20][21] Character Area Layout[20][21] Notes
    Marina Heights/Rio Salado Parkway Rio Salado 2 tracks, island platform, center of street Northern terminus
    Hayden Ferry/Rio Salado Parkway Rio Salado 1 track, island platform, center of street
    Tempe Beach Park/Rio Salado Parkway Rio Salado 1 track, side platform, center of street
    3rd Street/Mill Avenue Rio Salado 1 track, side platform, curbside lane Connect to Valley Metro RailatMill Avenue/Third Street
    3rd Street/Ash Avenue Rio Salado 1 track, side platform, curbside lane Connect to Valley Metro RailatMill Avenue/Third Street
    5th Street/Ash Avenue Rio Salado 1 track, side platform, curbside lane
    6th Street/Mill Avenue Rio Salado 1 track, side platform, curbside lane
    University Drive/Ash Avenue Rio Salado 1 track, side platform, curbside lane
    9th Street/Mill Avenue Rio Salado 2 tracks, island platform, center of street
    11th Street/Mill Avenue Rio Salado 2 tracks, island platform, center of street
    College Avenue/Apache Boulevard Apache 2 tracks, island platform, center of street
    Paseo del Saber/Apache Boulevard Apache 2 tracks, island platform, center of street
    Rural Rd/Apache Blvd Apache 2 tracks, island platform, center of street
    Dorsey/Apache Boulevard Apache 1 track, side platform, center of street Southern terminus, connect to Valley Metro Rail

    Planned extension[edit]

    As of 2024, Valley Metro is in the planning phases of extending the streetcar past its terminus at Marina Heights into Mesa, running down Rio Salado Parkway and Dobson Road.[22]

  • t
  • e
  • Rio East-Dobson Streetcar Extension

    Rural/Rio Salado

    McClintock/Rio Salado

    Smith/Rio Salado

    Evengreen/Rio Salado

    Rio Salado/Dobson

    University/Dobson

    Main/Dobson

    Handicapped/disabled access All stations are accessible

    See also[edit]

    References[edit]

    1. ^ a b c "Tempe streetcar service launches with free rides to be provided for first year". KTAR-FM. May 20, 2022. Archived from the original on May 21, 2022. Retrieved May 21, 2022.
  • ^ Jones, Vaughan (September 26, 2021). "Valley Metro Delays Tempe Streetcar Launch Until Spring 2022". KJZZ. Retrieved October 3, 2021.
  • ^ Náñez, Dianna (November 28, 2014). "Tempe streetcar on track, could cost $200 million". The Arizona Republic. Retrieved February 11, 2016.
  • ^ Coppola, Chris (February 10, 2016). "Obama's budget includes $75 million for Tempe streetcar". The Arizona Republic. Retrieved February 11, 2016.
  • ^ Sackley, Mike (February 10, 2016). "President Obama designates $75 million to Tempe streetcar project". WTAR. Retrieved February 11, 2016.
  • ^ "Tempe Streetcar" (PDF). Valley Metro. December 2014. Retrieved May 9, 2015.
  • ^ "Text Only Options". Valley Metro. Archived from the original on September 12, 2013. Retrieved October 17, 2013.
  • ^ "Significant Milestone for Tempe Streetcar | Valley Metro | Press Releases". Valley Metro. February 9, 2016. Retrieved February 19, 2016.
  • ^ "Valley Metro to break ground on Tempe Streetcar in June". Progressive Railroading. May 8, 2017. Retrieved May 9, 2017.
  • ^ "Designer selected for Tempe streetcar; project expected to be completed in 2020". KTAR News. December 17, 2016. Retrieved December 18, 2016.
  • ^ "Tempe Streetcar". Valley Metro. Archived from the original on July 19, 2017. Retrieved July 12, 2017.
  • ^ "Construction on $177 Million Tempe Streetcar Set for Summer". U.S. News. Associated Press. April 30, 2017. Retrieved July 12, 2017.
  • ^ "Tempe Streetcar | Valley Metro". www.valleymetro.org. Retrieved November 27, 2018.
  • ^ Cló, Renata (May 20, 2022). "Welcome aboard: Tempe's streetcar opens with free passenger fare". The Arizona Republic. Retrieved May 21, 2022.
  • ^ Náñez, Dianna M. (September 20, 2011). "Streetcar misconceptions addressed at Tempe forum". The Arizona Republic. Retrieved March 14, 2016.
  • ^ Jay Toll, Eric (March 29, 2016). "Amid audits, investigations and 7 rail extensions, Valley Metro's Scott Smith is an interim CEO on a mission". Phoenix Business Journal. Retrieved April 2, 2016.
  • ^ "City of Tempe - Transportation Commission Packet". City of Tempe. May 12, 2015. pp. 18, 22, 24, 26. Retrieved April 2, 2016.
  • ^ Goth, Brenna (February 9, 2016). "South Phoenix light rail on fast track, to come a decade early". The Arizona Republic. Retrieved February 15, 2016.
  • ^ "Brookville Contracted to Design, Build Six Off-Wire Capable Liberty Streetcar Vehicles for Valley Metro". Mass Transit. Brookville Equipment Corporation. June 19, 2017. Retrieved July 12, 2017.
  • ^ a b c Federal Transit Administration, U.S. Department of Transportation, Valley Metro (July 2015). "Environmental Assessment, Tempe Streetcar" (PDF). Retrieved April 7, 2020.{{cite web}}: CS1 maint: multiple names: authors list (link)
  • ^ a b c "Appendix A: Conceptual Engineering Drawings" (PDF). Valley Metro. May 2015. Retrieved April 7, 2020.
  • ^ Pitts, William (April 15, 2024). "Proposed streetcar line would extend from ASU to Mesa". NBC. 12 News. Retrieved April 16, 2024.
  • External links[edit]

    KML is from Wikidata

    Retrieved from "https://en.wikipedia.org/w/index.php?title=Tempe_Streetcar&oldid=1228592669"

    Categories: 
    Valley Metro Rail
    Tempe, Arizona
    Transportation in Tempe, Arizona
    Streetcars in Arizona
    Railway lines opened in 2022
    Tram transport
    Town tramway systems by city
    Hidden categories: 
    CS1 maint: multiple names: authors list
    Articles with short description
    Short description is different from Wikidata
    Use American English from April 2024
    All Wikipedia articles written in American English
    Use mdy dates from April 2024
    Articles containing potentially dated statements from 2024
    All articles containing potentially dated statements
    Pages using gadget WikiMiniAtlas
    Articles using KML from Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 12 June 2024, at 02:36 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki