The Solar Project






Español
Italiano
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 34°5219N 116°5003W / 34.87187°N 116.83419°W / 34.87187; -116.83419
 

From Wikipedia, the free encyclopedia
 


34°52′19N 116°50′03W / 34.87187°N 116.83419°W / 34.87187; -116.83419

Solar Two Power Tower Project

The SOLAR Project consists of the Solar One, Solar Two and Solar Tres solar thermal power plants based in the Mojave Desert, United States and Andalucía, Spain. The US Department of Energy (DOE) and a consortium of US utilities built the country's first two large-scale, demonstration solar power towers in the desert near Barstow, California.[1]

Solar One/Solar Two have been scrapped since 2009.[2] Solar Tres (later renamed Gemasolar), the first commercial plant of the project, was opened in Spain in 2011.

Solar One

[edit]

Solar One was a pilot solar-thermal project built in the Mojave Desert just east of Barstow, CA, USA. It was the first test of a large-scale thermal solar power tower plant. Solar One was designed by the Department of Energy (DOE) (led by Sandia National Laboratories in Livermore, California), Southern California Edison, LA Dept of Water and Power, and California Energy Commission. It was located in Daggett, CA, about 10 miles (16 km) east of Barstow.

Solar One's method of collecting energy was based on concentrating the sun's energy onto a common focal point to produce heat to run a steam turbine generator. It had hundreds of large mirror assemblies, or heliostats, that track the sun, reflecting the solar energy onto a 328 ft (100 m) tall tower[3] where a black receiver absorbed the heat. High-temperature heat transfer fluid was used to carry the energy to a boiler on the ground where the steam was used to spin a series of turbines, much like a traditional power plant.

In the late 1970s, a competition was held by the DoE to obtain the best heliostat design for the project. Several promising designs were selected and prototypes were built and shipped to the area for testing. Trade-offs involved simplicity of construction to minimize costs for high-volume manufacturing versus the need for a reliable, two-axis tracking system that could maintain focus on the tower. Rigidity of the structure was a major concern in terms of wind load resistance and durability, but shading of the mirrors by support structures was to be avoided.

The project produced 7 MW of electricity using 1,818 heliostats of 40 m2 (430 ft2) reflective surface area each, with a total area of 72,650 m2 (782,000 ft2). Solar One was completed in 1981 and was operational from 1982 to 1986. Later redesigned and renamed Solar Two, it could be seen from Interstate 40 where it covered a 51 hectare (126 acre) site, not including the administration building or rail yard facilities shared with a neighboring plant. Solar One/Two and other nearby solar projects are plainly visible via satellite imaging software at 34°52′18N 116°50′03W / 34.87167°N 116.83417°W / 34.87167; -116.83417.

During times of high winds, blowing dust is sometimes illuminated by the reflected sunbeams to create an unusual atmospheric phenomenon in the vicinity of the power tower. These beams of light were depicted in several scenes, and a painting, in the 1987 movie Bagdad Cafe, which was filmed nearby.

Nevada Solar One shares a similar name to Solar One, however it is quite different. It uses a solar thermal parabolic trough system and generates 64 MW.

Solar Two

[edit]
One of Solar Two's heliostats is shown in 2003 with the solar power tower in the background

In 1995 Solar One was converted into Solar Two, by adding a second ring of 108 larger 95 m2 (1,000 ft2) heliostats around the existing Solar One, totaling 1926 heliostats with a total area of 82,750 m2 (891,000 ft2). This gave Solar Two the ability to produce 10 megawatts—enough to power an estimated 7,500 homes.[2] Solar Two used molten salt, a combination of 60% sodium nitrate and 40% potassium nitrate, as an energy storage medium instead of oil or water as with Solar One. This helped in energy storage during brief interruptions in sunlight due to clouds.[2] The molten salt also allowed the energy to be stored in large tanks for future use such as night time—Solar Two had sufficient capacity to continue running for up to three hours after the sun had set. Solar Two was decommissioned in 1999.

In 2001, the University of California, Davis, received funding to convert it into an air Cherenkov telescope for measuring gamma rays hitting the atmosphere. The first astronomical observations were in the fall of 2004, and the last were in November 2005[4] This project was named C.A.C.T.U.S.[5] The facility was operated by the University of California, Davis but owned by Southern California Edison.[4]

Solar Two's 3 primary participants were Southern California Edison (SCE), the Los Angeles Department of Water and Power (LADWP), and the U.S. Department of Energy (DOE).

"We're proud of Solar Two's success as it marks a significant milestone in the development of large-scale solar energy projects," said then U.S. Energy Secretary Bill Richardson.
"This technology has been successfully demonstrated and is ready for commercialization. From 1994 to 1999, the Solar Two project demonstrated the ability of solar molten salt technology to provide long-term, cost effective thermal energy storage for electricity generation.", Boeing

On November 25, 2009, after 10 years of not producing any energy, the Solar Two tower was demolished.[2] The mothballed site was levelled and returned to vacant land by Southern California Edison. All heliostats and other hardware were removed.

Solar Tres

[edit]

Due to the success of Solar Two, a commercial power plant, originally called Solar Tres Power Tower, now known as Gemasolar Thermosolar Plant built in Spain by Torresol Energy using Solar One and Solar Two's technology for commercial electrical production of 15 MW.[6] Solar Tres is three times larger than Solar Two with 2,493 heliostats, each with a reflective surface of 96 m2. The total reflective area will be 240,000 m2 (2.6 million ft2). They will be made of a highly reflective glass with metal back to cut costs by about 45%. A larger molten nitrate salt storage tank will be used giving the plant the ability to store 600 MWh, allowing the plant to run 24/7 during the summer.

See also

[edit]

  • iconRenewable energy portal
  • Notes

    [edit]
    1. ^ "Archived copy" (PDF). Archived from the original (PDF) on 2018-09-13. Retrieved 2018-09-12.{{cite web}}: CS1 maint: archived copy as title (link)
  • ^ a b c d CEJNAR, JESSICA (November 24, 2009). "Going out with a bang: Edison demolishes Daggett solar tower". Desert Dispatch. Archived from the original on 2011-06-06. Retrieved 23 November 2015.
  • ^ "Solar One and Solar Two".
  • ^ a b "Solar Two Experimental Solar Facility". Archived from the original on 2009-05-15. Retrieved 2009-05-29.
  • ^ "History of Solar Two". Archived from the original on 10 August 2009. Retrieved 23 November 2015.
  • ^ "Power station harnesses Sun's rays". 2 May 2007 – via news.bbc.co.uk.
  • References

    [edit]
    [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=The_Solar_Project&oldid=1218861333"

    Categories: 
    Energy infrastructure completed in 1981
    Energy infrastructure completed in 1995
    Solar power stations in California
    Mojave Desert
    Buildings and structures in San Bernardino County, California
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    CS1 maint: archived copy as title
    Articles lacking in-text citations from June 2009
    All articles lacking in-text citations
    Coordinates on Wikidata
    Commons category link is on Wikidata
     



    This page was last edited on 14 April 2024, at 08:18 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki