Tomari Nuclear Power Plant






العربية
Čeština
Deutsch
Español
فارسی
Français
Italiano
Nederlands

Norsk bokmål
Polski
Русский
Suomi
Svenska

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 43°210N 140°3045E / 43.03611°N 140.51250°E / 43.03611; 140.51250
 

From Wikipedia, the free encyclopedia
 


Tomari Nuclear Power Plant
The Tomari Nuclear Power Plant
Map
CountryJapan
Coordinates43°2′10N 140°30′45E / 43.03611°N 140.51250°E / 43.03611; 140.51250
StatusOut of service for 12 years, 2 months
Construction beganApril 18, 1985 (1985-04-18)
Commission dateJune 22, 1989 (1989-06-22)
Operator(s)Hokkaido Electric Power Company
Power generation
Units operational2 × 579 MW
1 × 912 MW
Nameplate capacity2070 MW
Capacity factor0
Annual net output0 GW·h
External links
Websitewww.hepco.co.jp/ato_env_ene/atomic/atomic.html
CommonsRelated media on Commons

The Tomari Nuclear Power Plant (泊発電所, Tomari hatsudensho, Tomari NPP) is the only nuclear power plantinHokkaidō, Japan. It is located in the town of Tomari in the Furuu District and is managed by the Hokkaido Electric Power Company.[1] All of the reactors are Mitsubishi designs. The plant site totals 1,350,000 m2 (334 acres), with an additional 70,000 m2ofreclaimed land.[2][3]

History

[edit]

The plant was originally going to be located on an island and be named the Kyowa-Tomari NPP, but there was a change in plans, and the location and name was changed.

On 17 August 2000, a worker fell into a sump tank in a radioactive waste treatment building of the plant. The worker died in the hospital later.[4] In July 2007, there were three separate fires related to the new unit that was under construction. Electrical wiring had apparently been cut and foul play was suspected. This came just days after a serious earthquake and related events at the Kashiwazaki-Kariwa plant.[5] On September 29, 2007, Kazutoshi Michinaka reported that there was no radiation leakage and no one was hurt after a small fire at the half-built third reactor occurred. At least 7 arson cases have been reported at the construction site in 2007.[6]

On March 11, 2011, at the time of the Tohoku earthquake, the Number 3 reactor was undergoing the last phase of its regular inspection, a so-called "adjustment operation", which had started on March 7. Typically, reactors in Japan are brought into full commercial operation about 1 month after starting this adjustment, but because of the aftermath of the Fukushima-disaster, Hokkaido Electric Power Company withheld the final Nuclear and Industrial Safety Agency (NISA) check-up application. When the utility filed it in early August 2011, the Number 3 reactor had been operating on trial and providing electricity at nearly full power for 5 months. NISA reported to the Nuclear Safety Commission (NSC) on 11 August that no problems were found in the reactor during a 2-day final check that ended on 10 August. According to NISA, the reactor could safely be restarted, but the Hokkaido governor criticized the operator for submitting the application before it had reached its own decision on restarting (Japanese law does not require local governments' agreement to restart nuclear reactors, but in practice, both government and nuclear operators have always respected their will). Industry minister Banri Kaieda told then Governor Harumi Takahashi that the prefecture's consent was vital, and that he would wait for their decision.[7][8]

On August 17, 2011, the Japanese Government approved the restart of reactor Number 3. This was the first nuclear reactor given permission to be taken into service again after the events in Fukushima of March 11, 2011.[9][10][11]

On May 5, 2012, the reactor Number 3 was shut down for regular inspections, meaning of all 50 reactors in Japan, none were producing energy, which has only occurred once before, between 30 April and 4 May 1970, since the start of Japanese commercial nuclear power generation in 1966. After the nuclear disaster in Fukushima in March 2011, Japanese public opinion shifted away from nuclear power generation.[12] The shutdown of the last active nuclear power plant caused a demonstration of thousands in Tokyo celebrating a "nuclear-free" Japan.[13]

Stress-tests

[edit]

Seismic research in 2011 showed that the March 11 quake was caused by the simultaneous movement of multiple active faults at the coast of the Pacific Ocean in northern Japan and that much bigger earthquakes could be triggered than the plants were built to withstand. In February, the Tokai Daini Plant in Ibaraki Prefecture and the Tomari power facility in Hokkaido said that they could not rule out the possibility that the plants were vulnerable. Other nuclear power stations declared that the active faults near their nuclear plants would not move at the same time, and even if it did happen, the impact would be limited. NISA is to look into the evaluation of active faults done by the plants.[14][15]

Reactors on site

[edit]
Annual load factors
Unit Type Commission date Electric Power
Tomari – 1 PWR June 22, 1989 579 MW
Tomari – 2 PWR April 12, 1991 579 MW
Tomari – 3 PWR December 22, 2009 912 MW

See also

[edit]

References

[edit]
  1. ^ "泊発電所" [Tomari Nuclear Power Plant]. Dijitaru Daijisen (in Japanese). Tokyo: Shogakukan. 2012. OCLC 56431036. Archived from the original on 2007-08-25. Retrieved 2012-12-04.
  • ^ Hepco official document (Japanese). Moving Toward Provision of Hokkaido with Low-Carbon Energy: Installation of Tomari-3 Archived 2011-07-25 at the Wayback Machine. 2009.
  • ^ Hepco Global Warming Actions Archived 2011-07-25 at the Wayback Machine.
  • ^ "JCO related events" (PDF). Archived from the original (PDF) on 2007-09-30. Retrieved 2007-07-27.
  • ^ Guardian Unlimited. Fire at Japanese nuclear power plant. July 24.
  • ^ Inquirer.net, Fire breaks out at Japanese nuclear plant construction site
  • ^ Jaif (12 August 2011)Tomari No.3 nuclear reactor restart not decided Archived 2011-08-18 at the Wayback Machine
  • ^ Yomiuri Shimbun,"Resuming Tomari reactor a protracted process"
  • ^ (dutch) De Telegraaf (17 August 2011)First restart of nuclear reactor in Japan
  • ^ Kyodo News, "Tomari reactor first to go back fully online since 3/11", Japan Times, 17 August 2011, p. 1.
  • ^ Yomiuri Shimbun,"Tomari reactor's restart 1st step for combating power crisis"
  • ^ The Mainichi Shimbun (5 May 2012) Japan to be without nuclear power for 1st time in 42 years
  • ^ (Dutch) NRC (5 May 2012)Thousands of Japanese celebrate on the streets the shut down of the last nuclear powerplant
  • ^ NHK-world (1 March 2012) 2 plants to undergo checks for multiple faults
  • ^ JAIF (1 March 2012)Earthquake report 362: 2 plants to undergo checks for multiple faults Archived 2013-05-20 at the Wayback Machine
  • [edit]

  • iconEnergy portal
  • Nuclear technology portal

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Tomari_Nuclear_Power_Plant&oldid=1185704479"

    Categories: 
    1980s establishments in Japan
    Buildings and structures in Hokkaido
    Nuclear power stations in Japan
    Nuclear power stations using pressurized water reactors
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    CS1 Japanese-language sources (ja)
    Webarchive template wayback links
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Articles containing Japanese-language text
    Commons category link is on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 18 November 2023, at 14:07 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki