Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Line description  





2 Rail connections  





3 See also  





4 References  














TonglingJiujiang railway








 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Tongling–Jiujiang railway
Overview
Native name铜九铁路
LocaleAnhui
Jiangxi
Termini
  • Jiujiang
  • Service
    Operator(s)China Railway
    History
    Opened1 July 2008
    Technical
    Line length251 km (156 mi)
    Number of tracks1
    Track gauge1,435 mm (4 ft 8+12 in)
    Operating speed140 km/h (87 mph)

    Route map

    km

    Shizishan

    Left arrow Nanjing–Tongling railway to Tongling West

    Tongling

    Tongling South

    Gangyaohu

    Qingyang

    Maotan

    Jiuhuashan

    Chizhou

    Qingxi

    Juanqiao

    Yinhui

    Tangtian

    Zhangxi

    Dongzhi

    Jianxin

    Xiangyu

    Madang

    Quanshan

    Pengze

    Liusi

    Hukou

    Pipahu

    Jiujiang

    km
  • talk
  • edit
  • The Tongling–Jiujiang railwayorTongjiu railway (simplified Chinese: 铜九铁路; traditional Chinese: 銅九鐵路; pinyin: tóngjǐu tiělù), is a single-track railroadineastern China between TonglinginAnhui Province and JiujianginJiangxi Province. The line is 251 km (156 mi) long and follows the south bank of the Yangtze River.[1] Major cities and towns along route include Tongling, Chizhou, Dongzhi County, Pengze, Hukou County and Jiujiang.

    Line description[edit]

    The line follows the southern bank of the Yangtze River from Tongling to Hukou and crosses Poyang Lake to Jiujiang.[1] The Tongjiu railway was built from May 2005 to March 2008.[2] Freight service began on July 1, 2008 and passenger service followed on September 1, 2008.[1]

    The Tongling–Jiujiang railway, together with the Nanjing–Tongling railway constructed earlier, form a rail line along the Yangtze's right bank, from Nanjing to Jiujiang. The new Nanjing–Anqing intercity railway follows the same general route from Nanjing to Chizhou, where it crosses the Yangtze to reach Anqing.

    Rail connections[edit]

    See also[edit]

    References[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Tongling–Jiujiang_railway&oldid=1178896826"

    Categories: 
    Railway lines in China
    Rail transport in Anhui
    Rail transport in Jiangxi
    Jiujiang
    Tongling
    Railway lines opened in 2008
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Articles containing simplified Chinese-language text
    Articles containing traditional Chinese-language text
     



    This page was last edited on 6 October 2023, at 15:47 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki