Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Units  





2 See also  





3 References  














Type 707-class tanker






Čeština
Deutsch
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Class overview
BuildersWarnemünde, Rostock
Operators German Navy
Preceded byRhön-class
Planned2
Building2
General characteristics
TypeReplenishment tanker
Displacement>20,000 t[1]
Length173 m
Beam24 m
Draught8 m
Speed20knots (37 km/h; 23 mph)
Capacity13,000 m3[2]
Complement42

The Type 707-class tankers are a series of replenishment oilers under construction for the German Navy to provide underway replenishment for its ships at sea. Procurement of two vessels was announced in July 2019, with delivery intended in 2025 to replace the Rhön-class tankers which are scheduled to be retired that same year.[1]

Units[edit]

Pennant Name Builder Laid down Launched Commissioned Notes
Neptun Werft 8 August 2023[1][3] 2025[1]
Neptun Werft 25 April 2024 [4]

General contractor is the NVL Group, which is cooperating with the Meyer Werft.[5] The hulls are built by Neptun Werft in Warnemünde, which is part of the Meyer Group, the Superstructure at Meyer Werft, Papenburg.[6][7][8]

The construction of the first ship started on 29 June 2023 at Meyer Werft, Papenburg.[9] The keel was laid on 8 August 2023 at Neptun Werft.[10] The construction of the second ship started on 29 February 2024 at Meyer Werft.[11][12] The keel was laid on 25 April 2024.[13]

See also[edit]

References[edit]

  1. ^ a b c d "NVL Group Lays Keel Of First Type 707 Oiler For German Navy". navalnews.com. 16 August 2023.
  • ^ "VERSORGUNGSSCHIFFE". nvl.de. 2024. Retrieved 22 May 2024.
  • ^ "NVL Group Lays Keel for German Navy's First Type 707 Oiler". defensemirror.com. 16 August 2023.
  • ^ ES&T Redaktion (25 April 2024). "Zweiter Marinebetriebsstoffversorger auf Kiel gelegt". esut.de (in German). Retrieved 25 April 2024.
  • ^ "Ready, Set, Go for New Tanker". 29 June 2023. Retrieved 10 May 2024.
  • ^ https://nvl.de/sites/default/files/2024-02/Pressemitteilung_NVl%20group_Brennstart%20des%20zweiten%20Marinebetriebsstoffversorgers.pdf
  • ^ Pictures from 14 March: https://web.archive.org/web/20240314134149/https://scontent-fra3-2.xx.fbcdn.net/v/t39.30808-6/431483503_734461275545963_5752701638670717056_n.jpg?_nc_cat=107&ccb=1-7&_nc_sid=5f2048&_nc_ohc=CSOuq5DpK5QAX-zgxuQ&_nc_oc=AQk48yK72gXQ0Xqfrp7uJ214GZxg6MSXD3Q_x1tHTwRYwTuGVX-Z-JW4PW9r3JfY8tM&_nc_ht=scontent-fra3-2.xx&oh=00_AfC3hpDMejYTpQ2fbn7CzjUwYr1cWva1sI8uzYH9Cx2hmw&oe=65F89798 https://web.archive.org/web/20240314134213/https://scontent-fra3-2.xx.fbcdn.net/v/t39.30808-6/432369223_1575687623252940_8709751133666885376_n.jpg?_nc_cat=107&ccb=1-7&_nc_sid=5f2048&_nc_ohc=YrgN8c3flRgAX8JdlO2&_nc_ht=scontent-fra3-2.xx&oh=00_AfDmdyaEhWWpCN1K0xCRMd1GnRbL-w5Vna09jCi5TPYu1w&oe=65F82FC2 https://scontent-fra3-1.xx.fbcdn.net/v/t39.30808-6/431896908_779509864226681_482724710317067324_n.jpg?_nc_cat=101&ccb=1-7&_nc_sid=5f2048&_nc_ohc=VMuXeJ_O7o8AX8zP25j&_nc_oc=AQlqNEiepqfoD1hGVXEcxkO4qXdFj67vwZf35MY5Trw_qyz7kTDgAr5Bx_Iy9kzyw5Y&_nc_ht=scontent-fra3-1.xx&oh=00_AfC6gQcWzuTCgETCrNajPzw14Kq4iaGzKdlO_g-fa28BcQ&oe=65F8767A
  • ^ "Marine allemande | Mer et Marine".
  • ^ "Ready, Set, Go for New Tanker". 29 June 2023.
  • ^ "MARINETANKER AUF KIEL GELEGT" (PDF) (in German). 8 August 2023. Retrieved 10 May 2024.
  • ^ "Marinebetriebsstoffversorger Klasse 707: Baubeginn". 29 February 2024.
  • ^ "Presseportal - aktuelle Pressemitteilungen | NVL".
  • ^ "Auf Den Punkt Auf Kiel Gelegt" (PDF) (in German). 25 April 2024. Retrieved 10 May 2024.
  • [1][2][3]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Type_707-class_tanker&oldid=1225072729"

    Categories: 
    Auxiliary replenishment ship classes
    Auxiliary ships of the German Navy
    Oil tankers
    Tankers of Germany
    Hidden categories: 
    CS1 German-language sources (de)
    Use dmy dates from August 2023
     



    This page was last edited on 22 May 2024, at 06:02 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki