Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Construction and commissioning  





2 Service history  





3 References  














USS S-50






فارسی
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


USS S-50 (SS-161)
History
United States
NameUSS S-50
BuilderLake Torpedo Boat Company, BridgeportConnecticut
Laid down15 March 1920
Launched18 June 1921
Sponsored byMrs. William G. Esmond
Commissioned20 May 1922
Decommissioned20 August 1927
Stricken31 March 1931
FateScrapped autumn 1931
General characteristics
Class and typeS-class submarine
Displacement
  • 993 long tons (1,009 t) surfaced
  • 1,230 long tons (1,250 t) submerged
Length240 ft (73 m)
Beam21 ft 10 in (6.65 m)
Draft13 ft 6 in (4.11 m)
Speed
  • 14.5 knots (16.7 mph; 26.9 km/h) surfaced
  • 11 knots (13 mph; 20 km/h) submerged
Complement38 officers and men
Armament

USS S-50 (SS-161) was a fourth-group (S-48) S-class submarine of the United States Navy.

Construction and commissioning

[edit]

S-50skeel was laid down on 15 March 1920 by the Lake Torpedo Boat Company in Bridgeport, Connecticut. She was launched on 18 June 1921, sponsored by Mrs. William G. Esmond, and commissioned on 20 May 1922.

Service history

[edit]

Initially assigned to experimental Submarine Division (SubDiv) Zero, then to SubDiv 4, S-50 was based at New London, Connecticut, and, until mid-June, conducted trials in the Block Island area. She then visited Poughkeepsie, New York, and New Haven, Connecticut, and, in July, moved south to Washington, DC. At the end of the month she returned to New London, whence she continued north for operations off Portsmouth, New Hampshire, and Portland, Maine. On 11 August, she returned to New London, then proceeded to Bridgeport, and remained in the builder's yard until mid-October.

Resuming active duty, she operated in the New London area into January 1923, then proceeded to New York City. Repairs and alterations at the navy yard there took her into August, when she resumed tests and exercises in the Block Island-New London area.

At the end of December, the S-boat proceeded to Staten Island, whence, on 4 January 1924, she headed south to participate in Fleet Problem III, a test of Caribbean Sea defenses and transit facilities of the Panama Canal. On completion of the problem, she put into Coco Solo. Toward the end of the month, she moved into the Virgin Islands for further operations and exercises.

At about 03:30 on 6 February, a fire started in the battery compartment. The room was sealed. At 06:57, the room was ventilated. Four minutes later, the battery exploded, and the room was sealed for another four hours. Temporary repairs were soon started, and later that month, she began the trip back to New England. Towed initially to Guantanamo Bay, she was taken to New London and then to Portsmouth, New Hampshire, for yard work. In September, S-50 departed Portsmouth, under her own power, arrived at New London on 23 February; and reported to Commander, SubDiv 2. Three weeks later, she shifted to New York, where, for the next ten months, she was used in experimental engineering work.

In mid-July 1925, S-50 returned to New London and for the next two years was primarily engaged in conducting experimental tests and performing exercises for the Submarine School. During that period, she regularly interrupted those duties for annual overhauls and individual, division, and fleet exercises; and, in July 1926, was called on to assist in salvage operations for sister ship USS S-51. Experimental work during the period took her to the Virginia Capes to participate in sound tests for the Naval Experiment Laboratory in November and December, 1926, and to southern Florida for engineering tests in January and February, 1927.

On her return from Florida in March 1927, S-50 was ordered inactivated. At the end of the month, she proceeded to Philadelphia, Pennsylvania, where she was decommissioned on 20 August 1927 and remained berthed as a unit of the inactive fleet there until the 1930s. Her name was struck from the Naval Vessel Register on 31 March 1931, and her hulk was scrapped the following fall.

References

[edit]
Retrieved from "https://en.wikipedia.org/w/index.php?title=USS_S-50&oldid=1158341751"

Categories: 
United States S-class submarines
Ships built in Bridgeport, Connecticut
1921 ships
Maritime incidents in 1924
United States submarine accidents
Hidden categories: 
Articles with short description
Short description is different from Wikidata
Wikipedia articles incorporating text from the Dictionary of American Naval Fighting Ships
 



This page was last edited on 3 June 2023, at 13:19 (UTC).

Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



Privacy policy

About Wikipedia

Disclaimers

Contact Wikipedia

Code of Conduct

Developers

Statistics

Cookie statement

Mobile view



Wikimedia Foundation
Powered by MediaWiki