Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 References  














Upper Naryn hydropower cascade






Русский
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 41°27N 76°17E / 41.450°N 76.283°E / 41.450; 76.283
 

From Wikipedia, the free encyclopedia
 


Upper Naryn hydropower cascade
Upper Naryn hydropower cascade is located in Kyrgyzstan
Upper Naryn hydropower cascade

Approximate location in Kyrgyzstan

CountryKyrgyzstan
LocationNaryn Region
Coordinates41°27′N 76°17′E / 41.450°N 76.283°E / 41.450; 76.283
StatusUnder construction
Dam and spillways
ImpoundsNaryn
Power Station
Installed capacity238 MW

The Upper Naryn hydropower cascade (Russian: Верхне-Нарынский каскад ГЭС) is a hydropower project in Naryn Region, Kyrgyzstan. When completed, it will consist of 4 hydropower plants on the river Naryn: Ak-Bulung, Naryn-1, Naryn-2 and Naryn-3, with a total installed capacity of 238 MW.[1][2]

Construction was started in June 2013 by the company "Verkhne-Narynskiye GES", a joint venture of the Russian company RusHydro and the Kyrgyz state-owned company "Elektricheskiye stantsii".[3] However, it was interrupted in 2015 due to financial difficulties at RusHydro,[4] and in December 2015 the Kyrgyz government decided to terminate the agreement with the Russian Federation.[5]

References[edit]

  1. ^ National Energy Holding (2020). "Promising investment projects in the energy sector" (PDF) (in Russian).
  • ^ State Committee for Industry, Energy and Subsoil Usage of the Kyrgyz Republic (2019). "Hydropower of the Kyrgyz Republic" (PDF) (in Russian).
  • ^ "RusHydro started construction of the Upper Naryn cascade of HPPs in Kyrgyzstan (press release)". RusHydro. 12 June 2013.
  • ^ "Kyrgyzstan's Hydropower Projects Stall Again". IWPR. 25 August 2016.
  • ^ "Not enough for Naryn". Kommersant. 20 January 2016.
  • iconWater portal
  • iconRenewable energy portal

  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Upper_Naryn_hydropower_cascade&oldid=1152908946"

    Categories: 
    Hydroelectric power stations in Kyrgyzstan
    Proposed hydroelectric power stations
    Proposed renewable energy power stations in Kyrgyzstan
    Hydroelectric power plant stubs
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    CS1 Russian-language sources (ru)
    Articles with short description
    Short description matches Wikidata
    Coordinates on Wikidata
    Pages using infobox dam which are not about dams
    Articles containing Russian-language text
    All stub articles
     



    This page was last edited on 3 May 2023, at 01:25 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki