![]() | This is the user sandboxofDynamicalEdit. A user sandbox is a subpage of the user's user page. It serves as a testing spot and page development space for the user and is not an encyclopedia article. Create or edit your own sandbox here. Other sandboxes: Main sandbox | Template sandbox Finished writing a draft article? Are you ready to request review of it by an experienced editor for possible inclusion in Wikipedia? Submit your draft for review! |
Neptune-Odyssey is a concept for the next NASA Large Strategic Science Mission. The concept is focused upon the Neptune-Triton system.
Davao Global Township
| |
---|---|
IMPORTANT
IMPORTANT
| |
Nicknames:
"DGT"
| |
Motto:
The Address of Amazing
| |
Coordinates: 7°3′21.9″N 125°34′54.6″E / 7.056083°N 125.581833°E / 7.056083; 125.581833 | |
Country | Philippines |
Region | Davao Region |
City | Davao City |
Barangay | Barangay 74-A |
Elevation | 20 m (70 ft) |
Highest elevation | 34 m (112 ft) |
Time zone | UTC+8 (PST) |
Area code | 8000 |
Davao Global Township is an under construction financial, residential and lifestyle district in Davao City, Philippines. It is located 3 km (1.86 mi) west of the city hall of Davao City. The entire project used to be a golf course called the Matina Golf Course. The 22-hectare project is under a joint venture by Cebu Landmasters Inc. and YHEST Realty and Development Corp and is by far the largest project Cebu Landmasters has ever undertaken. The cost of the entire project is estimated to be at P33 billion.
YHEST partnered with RTKL, a global planning and design firm responsible for the revival of some downtown centers in various countries, for the design of 93000 square meters of gross floor area in the first phase, set to be completed in 2022.[1]
A Memorandum Of Understanding(MOU) was signed between Cebu Landmasters Inc. and YHEST Realty and Development Corp. on May 19, 2017.
The airport is connected to the city via the Carlos P. Garcia National Highway. The 4-laned La Verna-Mamay Bypass Road road was constructed and finished in 2017 near the airport to decongest traffic going from Mamay road to the airport and beyond and vice versa, by avoiding the usually busy intersection of Mamay Road and the Carlos P. Garcia National Highway. To avoid widening a road, which would displace houses and creep onto the airport's site, the road splits into two for 600 meters then merges back. It has a length of 1.7 kilometers, and is able to accommodate 1,000 vehicles per day.[2]
The planned Davao City Expressway will further connect the airport to the city via a diamond interchange. If it goes according to plan, the entire project will be completed in 2026.[3]