Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Construction  





2 Stations  





3 Operation  





4 The branch today  





5 References  



5.1  Bibliography  







6 External links  














Waiau Branch







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Waiau Branch
Overview
StatusPartly Closed
OwnerRailways Department
LocaleCanterbury, New Zealand
Termini
  • Waipara
  • Waiau
  • Stations10
    Service
    TypeHeavy Rail
    SystemNew Zealand Government Railways (NZGR)
    Operator(s)Railways Department
    History
    Opened1882–1919 (1882–1919)
    Closed1978 (1978)
    Technical
    Line length66.55 km
    Number of tracksSingle
    CharacterRural
    Track gauge3 ft 6 in (1,067 mm)

    Route map

    Main North Line

    0.00
    Waipara

    14.67
    Waikari Weka Pass Railway

    21.43
    Hawarden

    26.75
    Medbury

    34.70
    Balmoral

    40.98
    Pahau

    45.95
    Culverden

    54.34
    Archray

    57.32
    Rotherham

    66.55
    Waiau
    km
  • talk
  • edit
  • Map
    Map

    The Waiau Branch was a branch line railway in the northern Canterbury region of New Zealand's South Island. Known as the Great Northern Railway for its first few decades of life, the Waiau Branch was seen as part of a main line north but was ultimately superseded by a coastal route. Opened in stages from 1882 to 1919, the line closed in 1978 but a portion has been retained as the Weka Pass Railway.

    Construction

    [edit]
    Frog Rock.

    During the 1870s, significant debates motivated by regional interests took place regarding the most desirable route for a railway from Canterbury to the West Coast, Nelson, and Marlborough. A number of these plans involved lines that would have in some way incorporated the route of what became the Waiau Branch, and when it was built, it was seen as an integral part of the Main North Line.

    Despite an 1879 report favouring a coastal route via Kaikōura as the line north, the inland route was initially chosen and construction work soon began. Its junction with the Main North Line (though not realised by anyone at the time as it was intended to be the main line itself) would be in Waipara, and the section to Waikari was opened on 6 April 1882. Another report in 1883 also favoured the coastal route, but construction of the Waiau route proceeded and the section to Medbury opened on 15 September 1884, with Culverden reached on 8 February 1886.

    Construction halted once Culverden was reached, and it became the northern terminus for the main line along the east coast of the South Island. One notable proposal at this time involved extending the line via Hanmer SpringstoTophouse, and then building two routes from there, one to Nelson and one down the Wairau River valley to Blenheim. Another proposal involved building a line across the Southern AlpstoReefton, and accessing Nelson and Marlborough via a line through the Buller Gorge. The Reefton route remained a possibility for access to the West Coast until the Otira Tunnel was built, and the route to Nelson and Blenheim via Tophouse remained under consideration until the 1930s.

    Despite many proposals, the railhead remained in Culverden for a number of decades. In 1902, the Culverden – Waiau Railway Extension League was formed, and it created enough pressure to encourage a new survey of a route from Culverden to Waiau in 1908. It wasn't until 10 June 1914, however, that work on this extension finally began, and despite delays, work continued through World War I, with the line opened to Waiau on 15 December 1919. It was then proposed that the line could be extended to Kaikōura and then through to Marlborough, and some formation was built, but this work ultimately ground to a halt and the line's terminus remained in Waiau. The line effectively became a branch of the Main North Line when approval was given to extend the Parnassus Branch up the coast as the main line; this was completed in 1945.

    Stations

    [edit]
    Glenmark Station in Waipara

    The following stations were located on the Waiau Branch (in brackets is the distance in kilometres from Waipara):

    Operation

    [edit]

    As part of the main east coast line, the Waiau Branch was a busy railway by the standards of country New Zealand branch lines. The Culverden Express began not long after the line was opened and was the most important train in North Canterbury at the time. The express was supplemented by multiple mixed trains that carried both goods and passengers and ran to a slower schedule. In 1919, a goods train was added to the schedule and the passenger train between Christchurch and Culverden operated twice daily; these services operated beyond Culverden to Waiau only thrice weekly. Trains sometimes had to be banked through Weka Pass, requiring an engine shed in Waikari, and locomotive depots were established in Waipara, Culverden, and Waiau.

    In 1907, the New Zealand Railways Department under the Railways Road Services Branch, introduced a bus connection from Culverden to the popular tourist location of Hanmer Springs, and by the 1920s, the policy of the New Zealand Railways Department was to actively encourage the bus services, which had been expanded. This led the passenger numbers on the line to decline from 20,000 in 1914 to just 3,000 yearly when passenger services were entirely cancelled on 29 January 1939.

    Freight, however, remained strong on the line. Extensive timber resources in the area led to a significant quantity of traffic, and the annual Molesworth Station muster required additional trains to transport the large amount of livestock, with these special services operating well into the 1960s despite the widespread demise of the transportation of livestock throughout the country. The branch was dieselised in 1968, and at this stage, despite the relaxation of laws and removal of subsidies that had benefited rail, it was still necessary to run two trains daily. In July 1975, a major storm severely damaged pine growth in the Balmoral State Forest, and the resulting timber that had to be transported resulted in a surge for the line. Multiple trains were required to run daily, sometimes hauled by two locomotives, and this traffic lasted for two years. When it finally ceased in late 1977, the line suddenly became uneconomic. No other traffic existed that was sufficient to justify the line's continued existence, and closure occurred on 15 January 1978.

    The branch today

    [edit]

    A union ban led to the track of the Waiau Branch remaining in place for a number of years after the line's closure, which gave locals and railway enthusiasts enough time to form the Weka Pass Railway and preserve the first 13 km of the branch line. The rest of the track to Waiau has now been removed, though this was not completed until 1991, and a number of remnants remain on the abandoned route. Much of the line's formation is still visible, and a part of it has been used as a walkway in Waikari, though it does not connect with the Weka Pass Railway's terminus in the town. A few station shelters and goods sheds have been relocated for use on farms near the line's former route, and other relics such as loading banks, station platforms, and pieces of rail can be found at the site of some old stations.

    References

    [edit]

    Bibliography

    [edit]
    • Churchman, Geoffrey B; Hurst, Tony (2001) [1990, 1991]. The Railways of New Zealand: A Journey through History (Second ed.). Transpress New Zealand. ISBN 0-908876-20-3.
  • Leitch, David; Scott, Brian (1995). Exploring New Zealand's Ghost Railways (1998 ed.). Wellington: Grantham House. ISBN 1-86934-048-5.
  • Hermann, Bruce J; South Island Branch Lines pp 5 (1997, New Zealand Railway & Locomotive Society, Wellington) ISBN 0-908573-70-7
  • Mulligan, Barbara (2000). New Zealand Rail Trails: A Guide to 42 Ghost Lines. Wellington: Grantham House Publishing. pp. 100–106. ISBN 978-1-86934-126-8.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Waiau_Branch&oldid=1194907316"

    Categories: 
    Railway lines in New Zealand
    Hurunui District
    Railway lines opened in 1882
    Railway lines closed in 1978
    Closed railway lines in New Zealand
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from August 2015
    Use New Zealand English from August 2015
    All Wikipedia articles written in New Zealand English
    Articles lacking in-text citations from February 2012
    All articles lacking in-text citations
    Pages using the Kartographer extension
     



    This page was last edited on 11 January 2024, at 10:12 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki