Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Line  



1.1  Sections  





1.2  Construction timetable  







2 References  














WendlingenUlm high-speed railway






Deutsch
Français
Magyar
Nederlands

Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Wendlingen–Ulm high-speed railway
Overview of the high-speed line
Overview
Native nameNeubaustrecke Wendlingen–Ulm
Line number4813
LocaleBaden-Württemberg, Germany
Technical
Line length59.575 km (37.018 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius2,305 m (7,562 ft)
Electrification15 kV/16.7 Hz AC overhead catenary
Operating speed250 km/h (155 mph)
Maximum incline
  • in Ulm Hbf: 3.5%
  • open line: 3.1% (exceptional)
  • otherwise: 2.5%

Route map

29.314

Wendlingen am Neckar

tunnel (375 m)[1]

Neckartal junction Little Wendlingen Curve
toNeckar-Alb Railway

30.168

freight connection tunnel (203 m)

freight connection from Wendlingen

30.537
Wendlingen Rübholz junction

38.342
Eastern portal Albvorland Tunnel

38.375
Nabern
(crossover)

Former Kirchheim–Weilheim railway

43.320
Aichelberg Tunnel (252 m)

45.367
Boßler Tunnel (8808 m)

54.180
Fils Viaduct (~485 m), Geislingen–Wiesensteig railway

54.651

59.962

60.845
Merklingen-Widderstall[2]
(crossover)

61.225

63.866
Merklingen

65.012

72.721
Imberg Tunnel
(499 m)

Portal Dornstadt

Fils VR–Ulm Rbf connecting line

87.874
Portal Ulm

Fils Valley Railway from Stuttgart

89.373
Ulm Hbf

Source: German railway atlas[3]

The Wendlingen-Ulm high-speed line is a high-speed railway in Germany, entirely within the state of Baden-Württemberg. The line crosses the Swabian Jura mountain range, with trains traveling at speeds up to 250 km/h (155 mph). It mostly follows the A8 motorway, connecting with the Neu-Ulm station in the east and Stuttgart in the west. Stuttgart Hauptbahnhof is currently being redeveloped as part of the Stuttgart 21 project.

As a section of the Stuttgart–Augsburg new and upgraded line, the Wendlingen-Ulm line is a component of the Magistrale for Europe from ParistoBudapest, which is supported by the European Union as part of its Trans-European Networks. The European Union provided up to 50 per cent funding of the planning phase of the project and ten per cent of its construction costs.

Line

[edit]

The line cut travel time for high-speed traffic between Stuttgart and Ulm to 28 minutes rather than the previous 54 minutes, assuming no stop at Stuttgart Airport is made. The project was part of Deutsche Bahn's Netz 21 (network 21) concept, which envisages a reduction of the travel time between Frankfurt and Munich from over three and a half hours today to two and a half hours in the future. However, this timing can only be achieved with a by-pass of Mannheim on the proposed Rhine/Main–Rhine/Neckar high-speed rail line, which would allow the travel time between Frankfurt and Stuttgart to be reduced to one hour. Deutsche Bahn has shelved the proposed bypass because of opposition to it in Mannheim.

27.1 km of the 58 km line run in seven twin-tube tunnels. The estimated construction cost of 2 billion, is affected by the difficult geology that the tunnels will run through.[4]

Sections

[edit]
A cross section of the line's route, showing the geolocial layers through which tunnels were built.

The project was divided into seven planning sections:

Construction timetable

[edit]

Construction was initially planned to commence in 2005, but was pushed back due to budget cuts. This changed in 2007, when the Federal Government, the State of Baden-Württemberg and Deutsche Bahn announced that the project had been officially approved. €2.0 billion would be invested in the Wendlingen-Ulm high-speed line, along with €2.8 billion in Stuttgart 21. Baden-Württemberg agreed to provide funds of €950 million for the Wendlingen-Ulm line, but the Federal Government will not provide funding for it before 2016.[5][6][7] Preparatory construction work for the new line began in the autumn of 2010, and the ground-breaking ceremony was held on 7 May 2012.[8]

The line was officially opened on 9 December 2022, in an official ceremony with the head of Deutsche Bahn and several local politicians.[9]

References

[edit]
  1. ^ "D-Stuttgart: Baustellenüberwachung". Electronic Journal of the European Union (in German) (2010/S 158-244693). 17 August 2010. Archived from the original on 28 November 2011. Retrieved 6 January 2018.
  • ^ "Deutschland-Stuttgart: Bauarbeiten für Eisenbahnlinien, 2019/S 143-351187, Bekanntmachung einer Änderung". tenders electronic date (in German). 26 July 2019. Retrieved 28 July 2019.
  • ^ Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. pp. 94, 104–05, 163. ISBN 978-3-89494-139-0.
  • ^ 27 Kilometer Tunnel durch schwieriges Gestein[permanent dead link], Stuttgarter Nachrichten of 4 October 2006 (in German)
  • ^ "Einigung auf Finanzierung von Stuttgart 21" (in German). SWR3 Radio news. 19 July 2007. Retrieved 2007-07-20. [dead link]
  • ^ "Finanzierung für Stuttgart 21 steht" (in German). Spiegel online. 19 July 2007. Retrieved 2007-07-20.
  • ^ "Tiefensee: Durchbruch für die Neubaustrecke Stuttgart - Ulm - Augsburg und "Stuttgart 21"" (Press release) (in German). Federal Ministry of Transport, Building and Urban Affairs. 19 July 2007. Retrieved 2007-07-20.
  • ^ "Bahn beginnt mit den Bauarbeiten". Stuttgarter Zeitung. 7 May 2012. Retrieved 9 May 2015.
  • ^ Aktuell, S. W. R. "Bahn-Neubaustrecke Wendlingen - Ulm ist eröffnet". swr.online (in German). Retrieved 2022-12-11.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Wendlingen–Ulm_high-speed_railway&oldid=1178746197"

    Categories: 
    Railway lines in Baden-Württemberg
    Railway lines in Bavaria
    High-speed railway lines in Germany
    Railway lines opened in 2022
    Hidden categories: 
    CS1 German-language sources (de)
    All articles with dead external links
    Articles with dead external links from April 2019
    Articles with permanently dead external links
    Articles with German-language sources (de)
    Articles with dead external links from October 2010
    Commons category link is on Wikidata
     



    This page was last edited on 5 October 2023, at 16:21 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki