Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Background and history  





2 Timeline  



2.1  Route maps  







3 See also  





4 References  





5 External links  














BRT Federal Line






Bahasa Melayu
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


BRT Federal Line
B2
The proposed BRT station and busway along the Federal Highway at Asia Jaya.
Overview
Native nameLaluan BRT Persekutuan
StatusShelved in 2017; 7 years ago (2017)
Line numberB2 (Purple)
LocaleKlang Valley
Termini
  •  FB24  Klang
  • Stations24[1]
    Service
    TypeBus rapid transit
    SystemHybrid System (combination of Direct Service, Trunk and Feeder)
    ServicesPhase 1A : Pasar SeniKerinchi
    Phase 1B : Petaling JayaSubang Jaya
    Phase 2 : Shah AlamKlang
    Daily ridership600,000 daily (expected)[1]
    Technical
    Line length32.52 km (20 mi)[1]

    Route map

    The BRT Federal Line was a proposed bus rapid transit for Kuala LumpurKlang Corridors, and it has been identified in the KL BRT Report 2011 as one of the potential BRT Corridors in the Klang Valley region. The BRT project was planned to be operational by 2018,[1][2][3][4][5][6] but is now shelved indefinitely.[7] The government cited "redundancies with the LRT3 (Shah Alam Line)" as the reason for its decision to cancel the project.[8]

    Designed to complement existing bus and rail transport networks, the BRT Federal line was to employ all-electric buses similar to BRT Sunway Line, however at ground level.

    Background and history[edit]

    According to a World Bank Report, the Klang-Shah Alam-Petaling Jaya corridor has nearly a million private vehicles travelling on the Federal Highway daily during morning peak hours.[1] Transport Minister, Liow Tiong Lai has proposed the BRT KL-Klang line to ease the congestion.[9] Unlike the BRT Sunway Line, the BRT KL-Klang will be on ground level.[9]

    Prime Minister, Najib Razak has allocated RM 1.5 billion for the project during the 2016 Budget presentation.[10]

    The BRT line is planned to be built in the middle of Federal Highway and the construction is expected to start in the third quarter of 2016.[1] Upon completion, about 80% of the BRT line will offer some form of connection with the LRT as well as KTM Komuter and will cut down travel times between Kuala Lumpur and Klang to 40 minutes from current 70 minutes.[11] This project was said to start from Q3-2016, but no progress has been done yet.

    Although the Transport Minister, Liow Tiong Lai, said that the project would be finished in 2 or 3 years time,[12] it was confirmed to be shelved by the Economic Council, to "give priority to other transportation projects such as the high speed rail and the mass rapid transit".[13] The Land Public Transport Commission (SPAD) has also annulled the BRT tender as shown on their website.[14]

    Timeline[edit]

    19 January 2017 - The Land Public Transport Commission (SPAD) invites bid for "comprehensive planning, design, finance, construction, operation, maintenance and upgrade" of the KL-Klang BRT project. [15]

    24 November 2017 - The tender agreement by the Land Public Transport Commission was officially annulled.[14]

    Route maps[edit]

    See also[edit]

    References[edit]

    1. ^ a b c d e f "BRT KL-Klang line expected to be ready by 2018". Retrieved 6 November 2015.
  • ^ "Bus Rapid Transit (BRT)". Archived from the original on 24 September 2013. Retrieved 20 September 2013.
  • ^ "KL-Klang BRT service to start in March". Archived from the original on 2 April 2015. Retrieved 6 December 2014.
  • ^ "Klang Valley folk now opting for public transportation to beat jams". Retrieved 13 May 2014.
  • ^ "JKR - Perlaksanaan Projek dan Status Semasa BRT". Retrieved 29 July 2013.
  • ^ "JKR - Status Semasa BRT". Retrieved 29 July 2013.
  • ^ "RM2 billion KL-Klang bus lane project shelved indefinitely, says report | The Malaysian Insight". www.themalaysianinsight.com. Retrieved 28 November 2017.
  • ^ "KL-Klang BRT scrubbed due to overlap with LRT3, says Putrajaya". MalayMail.com. Retrieved 28 November 2017.
  • ^ a b "Prasarana awaits green light for BRT Federal Highway Line". Archived from the original on 4 March 2016. Retrieved 6 November 2015.
  • ^ "Budget 2016: MRT, LRT extension, BRT, HSR updates". Retrieved 6 November 2015.
  • ^ "Bus Rapid Transit (BRT) – KL-Klang line ready by 2018". Retrieved 6 November 2015.
  • ^ "KL-Klang BRT service ready in two years, says Liow". Free Malaysia Today. Retrieved 31 May 2017.
  • ^ "RM2b KL-Klang busway shelved". The Edge Markets. 24 November 2017. Retrieved 28 November 2017.
  • ^ a b "Archived copy" (PDF). Archived from the original (PDF) on 1 December 2017. Retrieved 28 November 2017.{{cite web}}: CS1 maint: archived copy as title (link)
  • ^ "SPAD Conducts Request For Proposal (RFP) To Implement The Bus Rapid Transit (BRT) Kuala Lumpur – Klang Project". Archived from the original on 2 February 2017. Retrieved 21 January 2017.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=BRT_Federal_Line&oldid=1176360027"

    Categories: 
    Proposed transport infrastructure in Malaysia
    Bus rapid transit in Malaysia
    Hidden categories: 
    CS1 maint: archived copy as title
    EngvarB from March 2016
    Use dmy dates from March 2016
    Pages with no gauge entered in Infobox rail line
    Webarchive template wayback links
     



    This page was last edited on 21 September 2023, at 06:06 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki