Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Stations  



1.1  Alignment and station list  







2 Chronology  





3 Other Information  





4 Gallery  





5 References  





6 External links  














Shah Alam line






Bahasa Melayu

اردو

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Shah Alam Line
Overview
Other name(s)LRT 3
Native nameLRT Laluan Shah Alam
StatusUnder construction
OwnerPrasarana Malaysia
Line number11 (sky blue)
LocaleKlang Valley
Termini
  •  SA12  Dato Menteri (Phase 1)
     SA01  Bandar Utama (Phase 2)
  • Stations25 (under construction)
    Websitelrt3.com.my
    Service
    TypeMedium-capacity rail system
    SystemRapid KL (brand) Rapid KL
    Operator(s)Rapid Rail
    Depot(s)Johan Setia Depot
    Rolling stockCRRC Zhuzhou LRV
    25 three-cars trainsets[1]
    Width: 2.7 m (8 ft 10 in) - narrow profile
    Length: 57.60 m (189.0 ft)
    History
    Planned opening1 March 2025; 7 months' time (1 March 2025)[2]
    Technical
    Line length37.8 km (23.5 mi)[3]
    Elevated: 35.8 km (22.2 mi)
    Underground: 2 km (1.2 mi)[4]
    Number of tracks2
    Character95% Elevated, and 5% Underground
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge
    Electrification750 V DC third rail
    Conduction systemAutomated and driverless
    Operating speed80 km/h (50 mph)

    Route map

    KG09
    SA1
    Bandar Utama
    9

    SA2
    Kayu Ara

    SA3
    BU11 Parking

    SA4
    Tropicana

    SA5
    Damansara Idaman Parking

    SA6
    SS7

    SA7
    KJ27
    Glenmarie
    Parking
    5

    SA8
    Temasya

    SA9
    Kerjaya

    SA10
    Stadium Shah Alam Parking

    Phase 2
    Phase 1

    SA12
    Dato' Menteri

    SA13
    Raja Muda

    SA14
    UiTM Shah Alam

    SA15
    Seksyen 7 Shah Alam Parking

    SA16
    Bukit Raja Selatan

    SA17
    Bandar Baru Klang Parking

    SA18
    Pasar Klang Parking

    SA19
    Jalan Meru

    SA20
    Pasar Jawa

    KD14
    Klang Parking
    2

    SA21
    Taman Selatan

    SA22
    Sri Andalas Parking

    SA23
    Klang Jaya

    SA24
    Bandar Bukit Tinggi Parking

    SA25
    Bandar Botanik

    SA26
    Johan Setia Parking


    Interchange stations

    integrated paid area
    single fare trip

    non-integrated paid area
    multiple fare trips

    interchange within same building
    or cross-platform interchange

    The LRT Shah Alam Line, previously known as the LRT Bandar Utama–Klang Line, LRT Bandar Utama-Johan Setia Line or simply LRT Johan Setia Line,[5] is a medium-capacity light rapid transit (LRT) line which will be serving the Shah Alam and Klang regions on the western side of the Klang Valley, Malaysia. It will be the third LRT line, and the fourth fully automated and driverless rail system in the Klang Valley region. The line will be operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia.[6][7] It was announced by Prasarana Malaysia on 24 April 2013.[8][9]

    Once completed, the line will form part of the Klang Valley Integrated Transit System. It is numbered 11 and coloured sky blue on official transit maps.

    The line is one out of four rapid transit lines in the Klang Valley that does not serve KL Sentral, the other three being the Ampang Line, Sri Petaling Line and the Putrajaya Line, as well as the first rapid transit line in the Klang Valley that is entirely outside the borders of the Federal Territory of Kuala Lumpur.

    Stations[edit]

    Map
    Location of Shah Alam Line
    LRT3 elevated bridge under construction across Klang River.
    Damansara Idaman LRT station.

    Previously, a total of 26 stations were planned, with a proposed two-kilometre distance between each station. One station was to be an underground station, with the other 25 being elevated.

    The LRT3 will feature a few interchange stations. The planned interchanges are  KG09  Bandar Utama on the MRT Kajang Line and  KJ27  CGC-Glenmarie on the LRT Kelana Jaya Line.

    The alignment is based on the Final Railway Scheme approved by the Land Public Transport Commission (SPAD).

    Due to the change of government in the 2018 Malaysian general election, the new Pakatan Harapan government decided to cut costs around the project and shelved six stations from the initial plan. The Lien Hoe, Temasya, SIRIM, Bukit Raja and Bandar Botanik stations were converted into provisional stations while the underground station of Persiaran Hishamuddin was cancelled. The reasons cited for the changes made were due to the high cost of the project, unnecessary tunneling for the underground portion of the line and low ridership in the area. The provisional stations however will be built once the demand in the area picks up.[10][11]

    Other cost-cutting exercises including the swapping of six-car trains for three-car trains, cutting down the total trains from 42 to 22, reducing the size of the stations and ditching costly acceleration techniques. The completion date also was extended from 2020 to 2024.[10][11]

    In July 2023, Transport Minister Anthony Loke mentioned that the overall line would be expected to be operational by 1 March 2025 adding more delays to the opening of the Shah Alam Line.[12] This would be the third delay to the project's completion date.

    During the Budget 2024 presentation held on 13 October 2023, Finance Minister Dato' Seri Anwar Ibrahim announced the reintegration of the five stations that were previously under provisional status (Tropicana, Temasya, Raja Muda, Bukit Raja Selatan, Bandar Botanik) to be built alongside the rest of the Shah Alam Line with the exception of the sole underground station, Persiaran Hishamuddin, which remains cancelled.[13]

    Alignment and station list[edit]

    The line currently has 25 permanent stations under construction.[14]

    Station Code Working Name Interim Name Station Layout Platform Type Interchange / Notes
     SA01  Bandar Utama One Utama Elevated Side Eastern terminus.

    Interchange station with  KG09  MRT Kajang Line.

     SA02  Kayu Ara Damansara Utama Elevated Island
     SA03  BU 11 Tropicana Elevated Island
     SA04  Tropicana Lien Hoe Elevated
     SA05  Damansara Idaman Dataran Prima Elevated Side
     SA06  SS7 Persada Plus / Kelana Indah Elevated
     SA07  Glenmarie Glenmarie 2 Elevated Side Interchange station with  KJ27  LRT Kelana Jaya Line.
     SA08  Temasya Temasya Elevated
     SA09  Kerjaya HICOM-Glenmarie / Persiaran Kerjaya Elevated Side
     SA10  Stadium Shah Alam Malawati Elevated Island
     SA11  Tunnel Ventilation Control Persiaran Hishamuddin Underground Cancelled[15]
     SA12  Dato' Menteri Section 14 / Bandar Anggerik / Bandaraya Shah Alam Elevated
     SA13  Raja Muda SIRIM / Seksyen 2 Elevated
     SA14  UiTM Shah Alam UiTM Elevated Island
     SA15  Seksyen 7 Shah Alam i-City / Hospital Shah Alam Elevated Side 2.4 km from  KD12  Padang Jawa on the KTM Tanjung Malim-Port Klang Line.
     SA16  Bukit Raja Selatan Lebuh Keluli Elevated
     SA17  Bandar Baru Klang Bukit Raja Elevated Island
     SA18  Pasar Klang Pasar Besar Klang Elevated Side
     SA19  Jalan Meru Kawasan 17 Elevated Side
     SA20  Pasar Jawa Klang Elevated Side Connected to Shaw Centerpoint Mall (The Store), 700 meter walking distance from  KD14  Klang on the KTM Tanjung Malim-Port Klang Line.
     SA21  Taman Selatan Taman Selatan Elevated Island
     SA22  Seri Andalas Seri Andalas Elevated Side
     SA23  Klang Jaya Lotus's Bukit Tinggi / Bukit Tinggi Elevated Island Exit to Lotus's Bukit Tinggi Hypermarket.
     SA24  Bandar Bukit Tinggi AEON Bukit Tinggi / Batu Nilam Elevated Island Exit to AEON Bukit Tinggi shopping mall.
     SA25  Bandar Botanik Bandar Botanik Elevated
     SA26  Johan Setia Johan Setia Elevated Island Western terminus.
    Klang Valley Integrated Transit Map published by RapidKL as of Feb 2023

    "Route Map". Archived from the original on 2021-06-23., subject to change

    Chronology[edit]

    Other Information[edit]

    Gallery[edit]

    The exterior of Taman Selatan station.

    References[edit]

    1. ^ "The first LRT3 train arrives in Malaysia" (in Malay). bharian.com.my. 21 June 2021.
  • ^ Kasinathan, Shathana. "LRT3's operation expected in March 2025, says Transport Minister Loke". Malay Mail. Retrieved 4 July 2023.
  • ^ "LRT3 kini dikenali sebagai LRT Laluan Shah Alam - paultan.org". August 5, 2021.
  • ^ "Light Rail Transit Line 3 (LRT 3), Malaysia".
  • ^ Rapid KL (5 August 2021). "LRT3 kini dikenali sebagai LRT Laluan Shah Alam". Facebook (in Malay). Retrieved 23 September 2021. LRT3 atau dahulunya LRT Laluan Bandar Utama – Johan Setia, kini secara rasmi akan dikenali sebagai LRT Laluan Shah Alam.
  • ^ "Study on LRT from Kelana Jaya to Klang via Shah Alam nears completion". The Star Online. Archived from the original on 2013-10-20. Retrieved 2013-10-21.
  • ^ "Third LRT to boost Port Klang". The Malay Mail. Archived from the original on 2013-12-13. Retrieved 2013-10-16.
  • ^ "Shah Alam LRT link in pipeline". Malaysia Chronicle. Retrieved 2013-04-24.
  • ^ "MY – Malaysia to Add a New LRT Line to Klang?". Bid Ocean Network. Archived from the original on 2013-12-13. Retrieved 2013-05-30.
  • ^ a b c "Six LRT3 stations shelved: Are you affected?". malaysiakini. 13 July 2018. Archived from the original on 18 December 2019. Retrieved 26 January 2021.
  • ^ a b c "Prasarana Malaysia Bhd to rationalise LRT3 project". New Straits Times. 26 July 2018. Retrieved 26 January 2021.
  • ^ "LRT3 TO START OPERATION IN MARCH 2025 - ANTHONY LOKE". BERNAMA. 2023-04-07. Retrieved 2023-07-05.
  • ^ Abdul Rahman, Sharil (13 October 2023). "Budget 2024: 5 previously provisional stations along the LRT Shah Alam Line will be built". SoyaCincau. Retrieved 13 October 2023.
  • ^ "Alignment & Stations | LRT3". Retrieved 2020-05-02.
  • ^ "LRT3 Public Information Update". LRT 3. 23 April 2017.
  • ^ "Shah Alam LRT stops proposed". NST. Retrieved 2014-05-30.
  • ^ "LRT3 route agreed at over 35km between PJ and Klang". KiniBiz. Retrieved 2014-07-17.
  • ^ "MRT Corp voices concerns, worried about LRT3 integration point at Bandar Utama". The Star Online.
  • ^ Ali, Sharidan M. (11 October 2014). "Budget 2015: Boon for construction". The Star.
  • ^ "Kelana Jaya Line". MYrapid. Archived from the original on 2015-05-11. Retrieved 2014-10-11.
  • ^ "Prasarana to roll out LRT3 projects by second half of 2015". The Star Online.
  • ^ "Tender documents for RM9bil LRT3 project ready for collection". The Star Online.
  • ^ Minderjeet Kaur (17 April 2015). "Sultan's nod for LRT Line 3". New Straits Times.
  • ^ Ali, Sharidan M (2015-04-11). "Prasarana says funding offer for LRT3 has to meet objectives – Business News | The Star Online". Thestar.com.my. Retrieved 2015-04-17.
  • ^ "Prasarana earmarks RM1 billion for land acquisition for LRT3 project". NST Online.
  • ^ "LRT3 works to start by 1Q16". THE EDGE MARKETS. 13 May 2015.
  • ^ "Construction of LRT3 to start in 1Q". The Star Online.
  • ^ "LRT3 construction work starts Q1 next year". The Sun Daily.
  • ^ "LRT3 public inspection to start this Friday". The Sun Daily. 13 May 2015.
  • ^ "Proposal of LRT3 alignment to be made public on Friday". The Star Online.
  • ^ "LRT 3 proposal put on display for public feedbacks". The Star Online.
  • ^ "Prasarana Organises A Public Inspection Of Its Latest Light Rail Transit Line 3 (LRT3) Project". MYrapid. Archived from the original on 2015-05-15. Retrieved 2015-05-12.
  • ^ "1,000 Visitors On Day One Of LRT3 Public Inspection – Temporary Booth At Taman Jaya LRT Station From Monday". LRT3. Retrieved 2020-10-13.
  • ^ "Prasarana partners MRCB, George Kent for LRT 3 project". The Malaysian Insider.
  • ^ "Route change for LRT3 project". The Rakyat Post.
  • ^ "PM Najib launches LRT3 project, set to benefit two million people by 2020". The New Straits Times.
  • ^ "Check out displays of the updated LRT3 railway scheme at APAD office from 15 June 2020 to 15 September 2020". myLRT3. Retrieved 2020-10-13.
  • ^ "Overall Linewide Progress | LRT3". Retrieved 2022-05-25.
  • ^ "Overall Linewide Progress | LRT3". Retrieved 2023-05-07.
  • ^ "LRT3 to open in March 2025, says Loke". Free Malaysia Today. Retrieved 4 July 2023.
  • ^ Lim, Anthony (13 October 2023). "Budget 2024: LRT3 gains back five stations – Temasya, Tropicana, Raja Muda, Bkt Raja, Bdr Botanik; RM5.3 bil". paultan.org. Retrieved 13 October 2023.
  • ^ Perumal, Stories Elan (2 August 2017). "Food court to share space with Klang LRT3 station". The Star. Archived from the original on 18 October 2022. Retrieved 2023-03-03.
  • ^ "Klang komuter station at risk of being closed". The Star.
  • ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22.
  • ^ "Sistem LRT3". Prasarana Malaysia. Archived from the original on 2015-04-17. Retrieved 2015-05-17.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Shah_Alam_line&oldid=1231541783"

    Categories: 
    Shah Alam Line
    Proposed rail infrastructure in Malaysia
    Transport in the Klang Valley
    Passenger rail transport in Malaysia
    2025 in rail transport
    Hidden categories: 
    CS1 Malay-language sources (ms)
    Articles with short description
    Short description matches Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 28 June 2024, at 21:32 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki