1 History  



1.1  Evaluation project  





1.2  Planned expansion  





1.3  Construction and grid connection  







2 Controversy  





3 See also  





4 References  





5 External links  














Beatrice Wind Farm






Deutsch
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 58°08N 3°04W / 58.13°N 3.07°W / 58.13; -3.07
 

From Wikipedia, the free encyclopedia
 


Beatrice Wind Farm
5 MW wind turbine under construction for Beatrice at Nigg fabrication yard on the Cromarty Firth
Map
Country
  • United Kingdom
LocationMoray Firth, North Sea
Coordinates58°08′N 3°04′W / 58.13°N 3.07°W / 58.13; -3.07
StatusOperational
Commission date
  • July 2018
Construction cost£2.6bn
Owner(s)
  • Equitix
  • Red Rock Power Limited
  • SSE Renewables
  • The Renewables Infrastructure Group
  • Wind farm
    Type
    Max. water depth45m
    Distance from shore13km
    Hub height101m
    Rotor diameter154m
    Power generation
    Units operational84 × 7 MW
    Make and modelSiemens Gamesa SWT-7.0-154 (84)
    Nameplate capacity
    • 588 MW
    External links
    Websitewww.beatricewind.com
    Map
    Wind farm layout

    The Beatrice Offshore Wind Farm now known as Beatrice Offshore Windfarm Ltd (BOWL) project, is an offshore wind farm close to the Beatrice oil field in the Moray Firth, part of the North Sea 13 km off the north east coast of Scotland.

    History[edit]

    Evaluation project[edit]

    Beatrice Wind Farm Demonstrator Project was a joint venture between Scottish and Southern Energy and Talisman Energy (UK) to build and operate an evaluation wind farm in the deep water close to the Beatrice Oil field that Talisman Energy was planning to decommission.[1]

    Built in 2007, with two turbines and a total capacity of 10 MW, it was designed to examine the feasibility of building a commercial wind farm in deep water. The jacket foundation design was developed by the Norwegian company OWEC Tower AS,[2] and fabricated in Scotland by Burntisland Fabrications. The site is 13 km from the Scottish coast and in 45 m of water. The evaluation project was proposed to last five years.[3] All the electricity generated was fed to the nearby Beatrice Alpha oil platform.

    The oilfield ceased operations in March 2015, and the demonstrator wind farm is expected to be decommissioned between 2024 and 2027.[4]

    Planned expansion[edit]

    In February 2009, the partnership of SSE Renewables and Repsol Nuevas Energias UK, was awarded exclusivity by The Crown Estate to develop the Beatrice offshore wind farm in the Outer Moray Firth just to the north of the existing demonstrator turbines. In April 2014, the UK Energy Secretary Ed Davey announced that the Beatrice Wind Farm would be one of eight projects awarded a contract for difference to set the price paid for its power for the next 15 years.[5]

    On 23 May 2016 approval was given for a £2.6bn expansion of the wind farm to 84 turbines with a capacity of 588MW of electricity, enough to supply 450,000 homes.[6]

    In June 2016 contracts were awarded to the Global Energy Group, in association with Siemens Wind Power, for fabrication and assembly of the turbines at Nigg Energy Park in Ross Shire, and to Wick Harbour for the assembly and transport process. Several other Highland towns are expected to benefit during the construction phase due to the expected influx of workers. Work began in April 2017.

    Construction and grid connection[edit]

    Offshore construction began in April 2017.[7] As of 15 May 2018, 56 of the total 84 turbine and 2 OTM jackets had been installed, first power from the main phase was generated in July 2018, with full commissioning expected to follow in spring 2019.[8][9][10]

    In January 2019, the wind farm was connected to the new Caithness - Moray Link. The high voltage direct current link enables power generated at Beatrice and other projects to be sent to high population areas in southern Scotland.[11]

    The link which runs from Caithness to Moray, which comes ashore at Portgordon in Moray, is connected to the new Beatrice/BOWL thence to Blackhillock Substation near Keith in Moray, the UK's biggest electricity substation as of January 2019.[11]

    Installation and commissioning for all 84 turbines was completed on 15 May 2019.[12]

    Controversy[edit]

    In October 2018 details emerged that migrant workers were being used increasingly in the construction phase.

    It came out that 11 Russian Workers were arrested at Aberdeen Airport in 2017 as they were working illegally on Seafarers documents.[13]

    In an unexpected move, the UK Home Office granted a 6-month waiver so that the crew could continue to work. This has been extended twice until 2019.[13]

    See also[edit]

  • iconWeather portal
  • iconRenewable energy portal
  • References[edit]

    1. ^ "The Beatrice Wind Farm Demonstrator Project, at a cost of €41 million, saw two 5MW wind turbines installed adjacent to the Beatrice oil field, 25 km off the east coast of Scotland". Beatrice Demonstrator Website. Archived from the original on 17 February 2014.
  • ^ "OWEC Tower AS". OWEC Tower Website. Archived from the original on 20 August 2011.
  • ^ "Beatrice Farm Demonstrator - Project Summary" (PDF). Archived from the original (PDF) on 6 October 2011.
  • ^ "Beatrice Demonstration to be decommissioned". 30 May 2017. Retrieved 3 January 2023.
  • ^ Amos, Ilona (24 April 2014). "Backing for wind farm that will push up bills". The Scotsman.
  • ^ "Beatrice". sse.com. Archived from the original on 29 June 2016. Retrieved 28 June 2016.
  • ^ "Building Beatrice offshore - Offshore Construction".
  • ^ "First power exported from Beatrice Offshore Wind Farm". BBC News. 19 July 2018.
  • ^ White, Matthew (15 May 2018). "Beatrice jackets up to a total 56". 4C Offshore.
  • ^ "Beatrice Turbines One Third Done". 18 October 2018.
  • ^ a b Keane, Kevin (11 January 2019). "Major subsea electricity link completed". BBC News. Retrieved 11 January 2019.
  • ^ PoliticsHome.com (15 May 2019). "Offshore construction completed at Scotland's largest offshore wind farm". PoliticsHome.com. Retrieved 20 May 2019.
  • ^ a b Lawrence, Felicity; McSweeney, Ella (21 October 2018). "Migrants building £2.6bn windfarm paid fraction of minimum wage". The Guardian. ISSN 0261-3077. Retrieved 12 January 2019.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Beatrice_Wind_Farm&oldid=1155132085"

    Categories: 
    Wind farms in Scotland
    Offshore wind farms in the North Sea
    2007 establishments in Scotland
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from March 2020
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Wind farm articles using Infobox power station
    Pages using the Kartographer extension
     



    This page was last edited on 16 May 2023, at 20:49 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki