Ormonde Wind Farm






Deutsch
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 54°06N 3°24W / 54.1°N 3.4°W / 54.1; -3.4
 

From Wikipedia, the free encyclopedia
 


Ormonde Wind Farm
Map
Country
  • United Kingdom
LocationWest of Barrow-in-Furness, Irish Sea
Coordinates54°06′N 3°24′W / 54.1°N 3.4°W / 54.1; -3.4
StatusOperational
Construction beganMay 2010
Commission date
  • February 2012
Owner(s)
Operator(s)
Wind farm
Type
Max. water depth17–21 m (56–69 ft)
Distance from shore9.5 km (5.9 mi)
Hub height100 m (328 ft)
Rotor diameter
  • 126 m (413 ft)
Site area8.7 km2 (3.4 sq mi)
Power generation
Units operational30 × 5 MW
Make and modelSenvion REpower 5M (30)
Nameplate capacity
  • 150 MW
Capacity factor38.5 %
Annual net output500 GWh
External links
Websitegroup.vattenfall.com/uk/what-we-do/our-projects/ormonde
CommonsRelated media on Commons
Map
Wind farm layout

The Ormonde Wind Farm is a wind farm west of Barrow-in-Furness in the Irish Sea. The wind farm covers an area of 8.7 square kilometres (3.4 sq mi). It has a total capacity of 150 MW and is expected to produce around 500 GWh of electricity per year.[1]

Planning[edit]

Originally the Ormonde project was planned as a hybrid wind and natural gas powered electricity generation plant supplied from the Ormonde South and Ormonde North gas fields. The project was developed by Eclipse Energy. In 2008, Vattenfall bought Eclipse Energy and the project was developed as wind energy only. The project management company throughout the project has been Offshore Design Engineering.[2]

Construction[edit]

The SeaJack installation vessel, Belfast Lough, 30 May 2011 en route from Harland and Wolff

Construction started in 2010 and was completed in August 2011.[3][4] Prysmian provided submarine power cable connections including 27 km of 33 kV inter-array cables to connect the wind turbines and a 42 km of 132 kV export cable to connect the wind farm to the substation.[5][6][unreliable source?] 30 turbines each with 5 MW nameplate capacity are provided by REpower and electrical works were to be carried out by Areva.[7] Steel foundations for generators were developed and designed by OWEC Tower and produced by Burntisland Fabrications.[8] Logistics and assembly services are provided by Harland and Wolff. Generators were installed by A2SEA.[9] The first four steel foundations were delivered in July 2010,[1] and were installed by a joint venture of Scaldis and Geosea BV.

The wind farm was commissioned on 22 February 2012 and is now fully operational.[10]

Its levelised cost has been estimated at £149/MWh.[11]

Incident[edit]

In 2021, a rotor and blades from a wind turbine fell into the sea following a maintenance error. The components broke up and debris has been washed up on nearby beaches.[12][13]

See also[edit]

  • iconWeather portal
  • iconRenewable energy portal
  • References[edit]

    1. ^ a b Snieckus, Darius (15 July 2010). "Foundations for Vattenfall's Ormonde wind farm on the way". ReCharge. NHST Media Group. Retrieved 16 July 2010.
  • ^ "ODE Projects - Ormonde Wind Farm". Archived from the original on 12 May 2011.
  • ^ Wolstenholme, Matthew (4 May 2010). "Vattenfall starts construction work on Ormonde wind farm". ReCharge. NHST Media Group. Retrieved 16 July 2010.
  • ^ "Work on Ormonde Wind Farm off Barrow completed". BBC News. 3 August 2011. Retrieved 16 August 2011.
  • ^ "Prysmian secures €27 million project". Prysmian Group. 27 September 2010. Retrieved 20 February 2022.
  • ^ "Ormonde Offshore Wind Farm".
  • ^ Johnson, Rachel (26 February 2009). "Work contracts awarded for Ormonde offshore wind hybrid". NewEnergyFocus.com. Retrieved 16 July 2010.
  • ^ "Burntisland bags wind job". Upstream Online. NHST Media Group. 20 February 2009. Retrieved 16 July 2010.
  • ^ Stromsta, Karl-Erik (1 June 2010). "A2SEA bags contract for work on Vattenfall's Ormonde project". ReCharge. NHST Media Group. Retrieved 16 July 2010.
  • ^ businessGreen news website
  • ^ Aldersey-Williams, John; Broadbent, Ian; Strachan, Peter (2019). "Better estimates of LCOE from audited accounts – A new methodology with examples from United Kingdom offshore wind and CCGT". Energy Policy. 128: 25–35. doi:10.1016/j.enpol.2018.12.044. hdl:10059/3298. S2CID 158158724.
  • ^ "Ormonde offshore wind farm debris could be widespread". BBC News. 24 October 2021. Retrieved 20 February 2022.
  • ^ Richard, Craig (25 October 2021). "Rotor and blades fall into sea at Vattenfall's Ormonde offshore wind farm". Wind Power Monthly. Retrieved 20 February 2022.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Ormonde_Wind_Farm&oldid=1153860716"

    Categories: 
    Offshore wind farms in the Irish Sea
    Wind farms in England
    Vattenfall wind farms
    Buildings and structures in Barrow-in-Furness
    Energy infrastructure completed in 2012
    2012 establishments in England
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Use dmy dates from April 2022
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Wind farm articles using Infobox power station
    All articles lacking reliable references
    Articles lacking reliable references from June 2016
    Commons category link is on Wikidata
    Webarchive template wayback links
    Pages using the Kartographer extension
     



    This page was last edited on 8 May 2023, at 19:17 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki