Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Background  



1.1  Development  







2 Design  



2.1  Lines  



2.1.1  Central Line  





2.1.2  Airport Line  





2.1.3  Extensions  







2.2  Rolling stock  







3 See also  





4 References  














Cebu Monorail







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Cebu Monorail Transit System
Overview
OwnerUdenna Corporation
Area servedCebu Province
LocaleMetro Cebu
Transit typeStraddle-beam monorail
Airport rail link
Number of lines2
Number of stations20
HeadquartersMactan–Cebu International Airport
Operation
Operation will startTBA
Operator(s)Philtram Transit Consortium
CharacterElevated
Rolling stockAlstom Innovia Monorail 300
Train length26–100 m (85–328 ft)
Technical
System length27 km (17 mi)
No. of tracks2 monorail beams
Top speed80 km/h (50 mph)

The Cebu Monorail Transit System, simply known as the Cebu Monorail, is a proposed monorail rapid transit system to be built in Metro Cebu, Philippines. Originally proposed by the Japanese in 2015 as the Cebu MRT System, it was revised to a light rail line in the late 2010s, dubbed the Cebu Light Rail Transit SystemorCebu LRT. It was then again revised to its present form in late 2019.

The system consists of two lines, one in mainland Cebu named the Central Line and another leading to Mactan–Cebu International Airport, named the Airport Line. The system was originally set to begin construction in 2021 and to partially open before year-end. The entire system was due to begin operating by May or June 2022. As of February 2021, the project is still awaiting approval from relevant government bodies.

Background

[edit]

The island of Cebu was historically served by the 57 mi (92 km) Cebu Line of the Philippine Railway Company between 1911 and 1942. After the war has destroyed the system, it was never repaired and was eventually dismantled. Since the 1970s, proposals to rebuild the Cebu Line were proposed but none of them came to fruition.[1]

Development

[edit]

The first contemporary proposal to rebuild a rail-based public transit system in Cebu was when the Japan International Cooperation Agency created The Roadmap Study for Sustainable Urban Development in Metro Cebu and proposed it to the Aquino administration in April 2015. JICA introduced a five-line concept as part of the study. The proposal included four MRT lines: North, South, Central, and Mactan lines, as well as an automated guideway transit line named the AGT-CML Line. The first line to be constructed would have been the AGT-CML Line, with a target completion date of 2021, followed by the MRT Central Line between 2021 and 2030. The other MRT lines were planned to open by 2050.[2]

Proposals for such an MRT system were later abandoned, and the Cebu Light Rail Transit System (Cebu LRT) was introduced by the Cebu City government in 2018. The line was planned to have the same characteristics as Manila LRT Line 1, and was complemented by the Cebu Bus Rapid Transit System and a monorail leading to Lapu-Lapu CityinMactan. The project initially had a targeted opening date of 2020 but it was postponed.[3] On May 26, 2019, plans for the Metropolitan Cebu Development and Coordinating Board to be legally reorganized into the Metro Cebu Development Authority was announced, so it can get better access to resources to fund projects such as the Cebu LRT. The system was then announced to be opened by 2022.[4]

However, the project was again revised to its present form on May 28, just two days after the announcement. Dennis Uy's Udenna Corporation, a Davao City-based company, proposed a monorail instead of a light rail system in 2018. Udenna's infrastructure head, Michael Jamonir stated that a monorail would cost less to construct and operate than an LRT system.[5] As of 2019, the project costs ₱77.57 billion (US$1.53 billion).[6]

Earlier in 2017, the Philtram Transportation Consortium (Philtram) was established. The group comprises Udenna, SYSTRA Philippines, CRRC Nanjing Puzhen, and Bombardier Transportation (later Alstom), among others.[7] By 2020, Philtram announced its interest in building the Cebu Monorail.[8] Department of Transportation Secretary Arthur Tugade announced that both the Cebu BRT and the Cebu Monorail will be complete before the end of 2021.[9] As of October 2021, both the BRT and monorail projects have been delayed beyond the initial 2021 target for partial operability.[10]

Design

[edit]

The Cebu Monorail will be a fully-elevated monorail system comprising the Central Line and the Airport Line. It will be capable of handling up to 15,000 per direction per hour. The maximum speed in the system will be 80 kilometers per hour (50 miles per hour).[8]

Lines

[edit]

Central Line

[edit]

The Central Line will be 17.7 kilometers (11.0 miles) long and will have 14 stations. It will connect downtown Cebu City with Talisay. There will also be a connection with the Airport Line somewhere in Cebu City.[9] So far, stations from these areas have been allotted: Talisay, Bulacao, Cebu South Bus Terminal, Kamputhaw, Mabolo and Kasambagan.[11]

Airport Line

[edit]

The Airport Line will be 9.3 kilometers (5.8 miles) long and will have six stations connecting Cebu City with Mactan.[9] Its depot will be located near Mactan–Cebu International Airport.[8] None of the stations have been named asides from one located in the vicinity of the airport.

Extensions

[edit]

There will be an extension of the Central Line to Linao in Talisay City and to Liloan via Mandaue.[11]

Rolling stock

[edit]

The system will use the Innovia Monorail 300 series trainsets to be built by Alstom (initially Bombardier).[12] Licensed production will also be conducted by CRRC Nanjing PuzhenofChina as part of the Belt and Road Initiative.[7]

According to one of Udenna's partners in the consortium, Jose Guardo's Maglevvision Philippines, the Innovia trainsets will initially use Bombardier's regular monorail technology on prefabricated precast post-tension concrete guide beams. It will be eventually replaced by Guardo's spin-induced Lenz's law magnetic levitation technology. These can also be arranged from 2- to 8-car trainsets from 26 to 100 meters (85 to 328 feet) long.[7]

See also

[edit]

References

[edit]
  1. ^ Palmera, Erica Jean (May 15, 2014). "The old Cebu Railway". The Philippine Star. Retrieved May 19, 2014.
  • ^ Public Transportation Introduced by 2030 (PDF). The Roadmap Study for Sustainable Urban Development in Metro Cebu (Report). Japan International Cooperation Agency. April 2015. Archived from the original (PDF) on May 5, 2021. Retrieved May 5, 2021.
  • ^ Mercurio, Richmond (December 10, 2018). "DOTr eyes operation of Cebu LRT, BRT by 2020". philstar.com. Retrieved June 15, 2019.
  • ^ Saavedra, John Rey (May 26, 2019). "Cebu LRT seen operational by 2022". www.pna.gov.ph. Retrieved June 15, 2019.
  • ^ Ilano, Marites (May 28, 2019). "Udenna drops LRT, eyes monorail for Cebu". SunStar Manila.
  • ^ "Cebu Monorail Transit System Project". www.ppp.gov.ph. Retrieved May 5, 2021.
  • ^ a b c Guardo, Jose (August 24, 2017). "Philtram monorail PPT". Retrieved May 5, 2021.
  • ^ a b c Maylan, Mark (February 5, 2021). "Cebu Monorail: Fast-Tracking Decongestion of Cebu's Worsening Traffic". Retrieved May 5, 2021.
  • ^ a b c Saavedra, John Rey (January 20, 2021). "Cebu BRT project partially operational before yearend: Tugade". www.pna.gov.ph. Philippine News Agency. Retrieved May 5, 2021.
  • ^ "Tomas and Dino squabble anew over BRT". INQUIRER.net. October 7, 2021. Retrieved February 7, 2022.
  • ^ a b Department of Transportation and Egis documents, via "Bus Rapid Transit (BRT) Is Set To Go On Full Swing On Its Operation". www.cebunibai.com. March 6, 2020. Archived from the original on March 8, 2020. Retrieved May 6, 2021.
  • ^ Philtram Presentation. Philtram Transportation Consortium, through the Philippine Train Enthusiasts and Railfans Club (PTERC). August 28, 2020. Archived from the original on May 5, 2021. Retrieved May 5, 2021.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Cebu_Monorail&oldid=1225741195"

    Categories: 
    Rapid transit in the Philippines
    Transportation in Cebu
    Cebu City
    Proposed public transportation in the Philippines
    Monorails in the Philippines
    Hidden categories: 
    Wikipedia articles needing copy edit from October 2023
    All articles needing copy edit
    Articles with short description
    Short description is different from Wikidata
    Use mdy dates from June 2020
    Articles containing potentially dated statements from February 2021
    All articles containing potentially dated statements
    Philippines articles missing geocoordinate data
    All articles needing coordinates
    Articles missing coordinates without coordinates on Wikidata
     



    This page was last edited on 26 May 2024, at 12:09 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki