Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  German period  





1.2  British Mandate  





1.3  After independence  







2 The Main Line  



2.1  Mwanza Line  





2.2  Mikumi line  







3 Traffic  





4 See also  





5 Sources  





6 Literature  





7 External links  



7.1  Maps  
















Central Line (Tanzania)






Deutsch
Italiano
Kiswahili
Norsk bokmål
Polski

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 6°S 35°E / 6°S 35°E / -6; 35
 

From Wikipedia, the free encyclopedia
 


Railway network
1000mm gauge, 1067mm gauge

1914 map of Dar es Salaam- Kintinku section
1914 map of Makutupora-Kigoma section

The Central Line (German: Mittellandbahn), formerly known as the Tanganyika Railway (German: Tanganjikabahn) is the most important railway line in Tanzania, apart from TAZARA. It runs west from Dar es SalaamtoKigomaonLake Tanganyika via Dodoma. A branch leads to MwanzaonLake Victoria.

In 2017, Tanzania began the Tanzania Standard Gauge Railway project, which will construct a standard gauge (1435 mm) line parallel to the meter-gauge (1000 mm) Central Line between Dar es Salaam and Mwanza, with a new route branching northwest at IsakatoKigaliinRwanda.

History[edit]

Kidete railway station
Kigoma railway station, viewed from the station yard in 2010

German period[edit]

The Central Line was the second railway project coming into existence in the colony of then German East Africa after the Usambara Railway. For the Tanganjikabahn-project a company was founded, the Ostafrikanische Eisenbahngesellschaft (OAEG) (East African Railway Company) which started railway construction in 1905 with 21 million marks (ℳ) provided by Adolph von Hansemann's Disconto-Gesellschaft (Discounting Company) bank. The building started at the port and capital of that time, Dar es Salaam.

From the start the engineers fought large difficulties, the tropical climate, periodic heavy rain and lack of appropriate building material. On the other hand, they could count on the experiences from the previous building of the Usambara Railway. The 1,000 mm (3 ft 3+38 in), meter-gauge, was chosen. The Central Line is the largest technical inheritance of the German colonial age in Tanzania.

The route followed an old caravan route to Tabora, which gave large logistic advantages. German settlers soon followed with plantations, and Tabora developed into a large agricultural centre. Kilometer 200 was reached in 1907, in the vicinity of the town of Morogoro. In 1909 the railhead reached Kilosa. Kigoma at Lake Tanganyika at kilometer 1252 was reached in 1914 just prior to the First World War. The regular travel time over the total distance amounted to 58 hours. It was planned to develop the line further to Iringa and to reach Lake Malawi, a project which was stopped due to the war.

The construction of the line opened up trade between Lake Tanganyika and the east coast and spurred the growth of the ports at its termini.

British Mandate[edit]

The British mandate added to the Central Line three branch lines. The most important one, of 379 km (235 mi), ran from Tabora to Mwanza at the south bank of the Lake Victoria. Another ran from KilosatoMikumi. A third, established in 1931, ran 93.58 mi (150.60 km)[1] from Manyoni via SingidatoKinyangiri;[2] the section north of Singida closed between 1944 and 1947.[3]

After independence[edit]

After the independence of Tanzania, the Central Line and the Usambara Railway were connected between the stations of Mruazi and Ruvu.

The Main Line[edit]

The Central Line starts at the Tanzanian metropolis of Dar es Salaam at the Indian Ocean with today's capital of Tanzania, Dodoma, in the center of the country and proceeds further to Tanzania’s most important port at the shore of Lake Tanganyika, Kigoma. It crosses central Tanzania completely with a length of 1,254 kilometers (779 mi) and overcomes the height of the east edge East African rift valley. The main stations on this line are: Dar es Salaam, Ruvu, Morogoro, Kilosa, Dodoma, Manyoni, Tabora and Kaliua.[4]

Mwanza Line[edit]

Mwanza Train Station as seen from the main road in the centre of Mwanza town.

The Mwanza Railway line connects with the main line at Tabora station and ends at Mwanza railway station. The distance covered by this railway line is 378 km. Its construction started at Tabora in 1923 and ended in Mwanza in 1928. A dry port was constructed at the town of Isaka, for freight transport to Rwanda and Burundi. The main stations along the Mwanza Railway line are: Tabora, Kakola, Isaka, Shinyanga and Mwanza.[4]

Mikumi line[edit]

The Mikumi line, built between 1958 and 1963, branches southwards off the Central Line at Kilosa and crosses the Mkata Plain to Kidatu, where it meets the 1,067 mm gauge TAZARA Railway at a break-of-gauge.

Traffic[edit]

Passenger train in the main station of Dar es Salaam

Today’s rail services are offered by the Tanzania Railways Corporation. The timetable[5] offers two passenger services per week in each direction covering the whole length of the line. A trip from Dar es Salaam to Kigoma takes approximately 40 hours today according to the timetable. The long time of travel is due to the poor state of the railway’s infrastructure, which originates to a large extent still from the German colonial times.[citation needed] Three classes are offered, whereby the second class also provides sleeping cars and the first class offers sleeping cars only.[6][7] The standard of a sleeping car of second class corresponds rather to a couchette by European standards.[citation needed]

Flooding in December 2009 caused serious disruption; operations resumed in June 2010.[8]

See also[edit]

Sources[edit]

  1. ^ "Railway Construction in East Africa, 1931–35". Hansard. 25 November 1936.
  • ^ Tanganyika (8 July 1932). Official Gazette. p. 395.
  • ^ Jumanne Mkama (1966). "Transportation and Economic Development in Tanzania". p. 30.
  • ^ a b "Railways Network". Tanzania Railways Limited. Archived from the original on 6 October 2016. Retrieved 7 March 2016.
  • ^ "Long Distance Train". Tanzania Railways Corporation. Retrieved 2022-12-24.
  • ^ "Mwanzo". www.trc.co.tz. January 2018. Retrieved 2023-08-12.
  • ^ "Mwanzo". www.trc.co.tz. January 2018. Retrieved 2023-08-12.
  • ^ "News in Brief". Railway Gazette. 2010. Archived from the original on 2019-07-13. Retrieved 2010-07-05.
  • Literature[edit]

    External links[edit]

    Maps[edit]

    6°S 35°E / 6°S 35°E / -6; 35


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Central_Line_(Tanzania)&oldid=1220334528"

    Categories: 
    Economy of German East Africa
    Night trains
    Metre gauge railways in Tanzania
    Railway lines in Tanzania
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Articles containing German-language text
    All articles with unsourced statements
    Articles with unsourced statements from September 2014
    Coordinates on Wikidata
     



    This page was last edited on 23 April 2024, at 03:57 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki