Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Lines in operation  



1.1  Line 1  





1.2  Line 2  







2 Future expansion  



2.1  Short term plan  





2.2  Long term plan  







3 Fares  





4 Trains  





5 Network map  





6 References  














Changzhou Metro






Deutsch
Esperanto
Euskara
Français


Oʻzbekcha / ўзбекча
Русский
Svenska

Українська


 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Changzhou Metro
Overview
Native name常州轨道交通
LocaleChangzhou, Jiangsu, China
Transit typeRapid transit
Number of lines2
Number of stations44
Daily ridership0.267 million (31 December 2021 record)
Annual ridership10.3 million (2019)
Websitewww.czmetro.net.cn Edit this at Wikidata
Operation
Began operation21 September 2019; 4 years ago (2019-09-21)[1]
Technical
System length54.03 km (33.57 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The Changzhou Metro is a rapid transit system in Changzhou, Jiangsu province, China. The system started operation on 21 September 2019, with the opening of its first line, Line 1 becoming the 35th city in China with a subway in Mainland China.[1] The Changzhou metro currently has Line 1 and Line 2 in operation, while Line 5 is still under construction.[2]

Announcements are made in Mandarin and English.

Lines in operation[edit]

Line Terminals
(District)
Commencement Length
km
Stations
 1  Forest Park
(Xinbei)
Nanxiashu
(Wujin)
21 September 2019 34.24[3] 29
 2  Qingfeng Park
(Zhonglou)
Wuyi Lu
(Wujin)
28 June 2021 19.79[4] 15
Total 54.03 44

Line 1[edit]

Line 1 started operation on 21 September 2019.[1] Construction for Line 1 began on 28 October 2014. The first phase runs from Forest Park (森林公园) in the north to Nanxiashu (南夏墅) in the south. It is 34.24 kilometres (21.28 mi)[3] in length with 29 stations, including 27 underground and 2 elevated. The line will be extended North for 3.5 km and South for 3.2 km.[5]

In its first year of operation, the highest passenger flow in a single day was 243,000 on October 2 and total ridership in 2019 was 10.3 million.[6]

Line 2[edit]

Construction for Line 2 began on 13 February 2017.[7] It is 19.79 kilometres (12.30 mi)[4][7] in length with 15 stations, from Qingfeng ParktoWuyi Lu.[7] It was opened on 28 June 2021.[4]

Future expansion[edit]

Short term plan[edit]

Line Construction start Estimated opening Section Stations Length References
 1  (North ext.) Forest Park - Chunjiang 2 3.5 [5]
 1  (South ext.) Nanxiashu - Changzhou South railway station 2 3.2 [5]
 2  (West ext.) Hexi - Qingfeng Park 7 8.6 [5]
 2  (East ext.) Wuyi Lu - Qishuyan railway station 4 5.0 [5]
 5  October 2023 2028 Lanyuewan - Dongqing 25 30.9 [8]
 6  2028 Wujin Yanjiang railway station - Jianye Lu 25 34.0 [5]

A two-station pilot section of Line 5 at the Lanyuewan end started construction in October 2023, with the start of construction along the entirety of Line 5 planned for 2024, with a completion in 2028.[8]

Long term plan[edit]

According to the "Changzhou Urban Rail Transit Construction Plan (2011~2018)", the urban rail transit network of Changzhou City planned by 2050 consists of 6 lines.[9]

Line Construction start Estimate opening Section Stations Length References
 3  Changzhou North railway station(metro) - Lijia
 4  Photovoltaics Industry Part - Jianhu Parking

Fares[edit]

Changzhou Metro has a starting price of 2 yuan, a starting mileage of 5 kilometers, and an upgrade mileage of "5, 5, 7, 7, 9" kilometers, and an increase of 1 yuan for each level. Namely: the fare of less than 5 kilometers (inclusive) is 2 yuan, the fare of 5-10 (inclusive) kilometers is 3 yuan, the fare of 10-15 (inclusive) kilometers is 4 yuan, and the fare is 15-22 (inclusive) kilometers. 5 yuan, 6 yuan fare for 22-29 (inclusive) kilometers, an increase of 1 yuan for every 9 kilometers above 29 kilometers.[10]

Trains[edit]

Trains for the first phase were manufactured by CRRC Nanjing Puzhen. The trains used by Changzhou Rail Transit Line 1 are Type B cars. Each train is 6 cars and is composed of 4 motor cars and 2 trailer cars. The first phase of the project ordered 36 trainsets. A 6 car set has a total length of about 120 metres (393 ft 8 in) and trains are 2.9 metres (9 ft 6 in) wide, the maximum operating speed is 80 km/h (50 mph), each car has 4 pairs of 1.3 metres (4 ft 3 in) wide doors on each side. The maximum passenger capacity of each train is 2062 people. At the same time, the train adopts lightweight aluminum alloy material with a service life of 30 years.[11]

Network map[edit]

Map


References[edit]

  1. ^ a b c "常州地铁1号线今日正式开通初期运营". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  • ^ "地铁5号线开工 设车站25座". 现代快报. 2023-10-30. Archived from the original on 2023-10-30. Retrieved 2023-10-30.
  • ^ a b "定了!常州市轨道交通1号线本周六上午930开通". 2019-09-18. Archived from the original on 2019-09-21. Retrieved 2019-09-18.
  • ^ a b c "常州地铁二号线开通 "地铁时代"跨入"换乘时代"". 2021-06-23.
  • ^ a b c d e f "【征询】常州市城市轨道交通第二期建设规划(2020-2026年)环评公众意见征询". 2020-03-19. Archived from the original on 2021-06-24. Retrieved 2021-06-23.
  • ^ "国庆我在岗|常州地铁的第一个黄金周客流突破120万人次". 2019-10-08.
  • ^ a b c "常州地铁2号线一期工程全面开工 2020年试运营". 2017-02-13. Archived from the original on 2019-11-01. Retrieved 2019-11-06.
  • ^ a b "地铁5号线开工,设车站25座". 2023-10-30. Retrieved 2024-04-07.
  • ^ "齐家滨陈金虎调研我市历史文化名城和交通建设情况". 2020-01-06.
  • ^ "市发展改革委 市交通局关于核定常州市轨道交通(地铁)票价的通知". 2019-08-16.
  • ^ "来了,常州地铁1号线首列车亮相". 2018-05-29. Archived from the original on 2022-03-12. Retrieved 2021-12-29.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Changzhou_Metro&oldid=1217757163"

    Categories: 
    Rapid transit in China
    Rail transport in Jiangsu
    Transport infrastructure under construction in China
    Transport in Changzhou
    Changzhou Metro
    Hidden categories: 
    Articles with short description
    Short description matches Wikidata
    Articles containing Chinese-language text
    Pages using the Kartographer extension
     



    This page was last edited on 7 April 2024, at 18:16 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki