Hohhot Metro | |||
---|---|---|---|
![]() | |||
Overview | |||
Locale | Hohhot, Inner Mongolia, China | ||
Transit type | Rapid transit | ||
Number of lines | 2 | ||
Number of stations | 44 | ||
Website | http://www.hhhtmetro.com/ | ||
Operation | |||
Began operation | 29 December 2019; 4 years ago (2019-12-29)[1] | ||
Technical | |||
System length | 49.0 km (30.4 mi) | ||
|
Hohhot Metro | |||||||
---|---|---|---|---|---|---|---|
Chinese name | |||||||
Simplified Chinese | 呼和浩特地铁 | ||||||
Traditional Chinese | 呼和浩特地鐵 | ||||||
| |||||||
Alternative Chinese name | |||||||
Simplified Chinese | 呼和浩特轨道交通 | ||||||
Traditional Chinese | 呼和浩特軌道交通 | ||||||
| |||||||
Mongolian name | |||||||
Mongolian Cyrillic | Хөх хотын метро | ||||||
Mongolian script | ᠬᠦᠬᠡᠬᠤᠳᠠ ᠶᠢᠨ ᠮᠧᠲ᠋ᠷᠣ᠋ | ||||||
| |||||||
Hohhot MetroorHohhot Rail Transit is a metro systeminHohhot, Inner Mongolia, China. Line 1 opened on 29 December 2019.[2]
![]() | |||||
Line | Terminals (District/Banner) |
Commencement | Length km |
Stations | |
---|---|---|---|---|---|
1 | Yili Health Valley (Tumed Left Banner) |
Bayan (Airport) (Saihan) |
29 December 2019 | 21.719[3] | 20 |
2 | Talidonglu (Xincheng) |
A'ershanlu (Saihan) |
1 October 2020 | 27.32[4] | 24 |
The first phase of Line 1 is 21.719 km (13.5 mi)[3] long. The color for Line 1 is red.[5]
Line 1 began construction in April 2016 and was opened on 29 December 2019.[1][3]
The first phase of Line 2 is 27.32 km (17.0 mi)[4] long. It was opened on 1 October 2020.[4] The color for Line 2 is blue.
Lines 3, 4, 5 and 6 are under planning.[6]
正线全长27.32km
Public transportation in Inner Mongolia (NM)
| |||||
---|---|---|---|---|---|
![]() |
| ||||
![]() |
| ||||
Transportation hubs |
| ||||
|
| |||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Light metros |
| ||||||||||||||||||||||||||||||||||||||
Maglev |
| ||||||||||||||||||||||||||||||||||||||
Light rails |
| ||||||||||||||||||||||||||||||||||||||
APM |
| ||||||||||||||||||||||||||||||||||||||
Suburban rail Commuter rail |
| ||||||||||||||||||||||||||||||||||||||
BRT |
| ||||||||||||||||||||||||||||||||||||||
Autonomous Rail Rapid Transit (ART) |
| ||||||||||||||||||||||||||||||||||||||
* in / related to the special administrative regions |
Rapid transit in Asia
| |
---|---|
| |
| |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
* Under construction. |