Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 Route  





3 Stations  





4 References  














ChengduDazhouWanzhou high-speed railway







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Chengdu–Dazhou–Wanzhou
high-speed railway
成达万高速铁路
Overview
StatusUnder construction
Termini
  • Wanzhou North
  • Stations13
    Service
    Operator(s)China Railway Chengdu Group
    Technical
    Line length477 km (296 mi)[1]
    Track gauge1,435 mm (4 ft 8+12 in)
    Operating speed350 km/h (217 mph)

    The Chengdu–Dazhou–Wanzhou high-speed railwayorChengdawan HSR (Chinese: 成达万高速铁路; pinyin: Chéngdáwàn Gāosù Tiělù) is a high-speed railway currently under construction in China. This line forms part of the Shanghai–Chongqing–Chengdu high-speed railway.

    History[edit]

    This railway was planned as early as 2015.[2] Construction began on 30 September 2022.[1]

    Route[edit]

    The section between Tianfu and Tianfu Airport is shared with the Chengdu–Zigong high-speed railway.

    Stations[edit]

    Station Name[1] Chinese Metro
    transfers/connections
    Tianfu 天府 Chengdu Metro 18 19
    Tianfu Airport 天府机场 Chengdu Metro 18
    Ziyang West 资阳西
    Lezhi 乐至
    Suining 遂宁
    Pengxi South 蓬溪南
    Nanchong North 南充北
    Yingshan West 营山西
    Quxian North 渠县北
    Dazhou South 达州南
    Kaijiang South 开江南
    Yuexi 岳溪
    Wanzhou North 万州北

    References[edit]

    1. ^ a b c "全线动工!成达万高铁新进展". 2022-09-30. 成达万高铁全线共设天府站、天府机场站、资阳西站、乐至站、遂宁站、蓬溪南站、南充北站、营山西站、渠县北站、达州南站、开江南站、岳溪站、万州北站等13座车站
  • ^ "成都将新建4条出川铁路". 中国铁路成都局集团有限公司 (China Railway Chengdu Group Co., Ltd.). Retrieved 2020-12-24.

  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Chengdu–Dazhou–Wanzhou_high-speed_railway&oldid=1218378240"

    Categories: 
    High-speed railway lines in China
    High-speed railway lines under construction
    25 kV AC railway electrification
    People's Republic of China rail transport stubs
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Articles containing simplified Chinese-language text
    Articles containing Chinese-language text
    All stub articles
     



    This page was last edited on 11 April 2024, at 10:58 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki