Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Stations  





2 References  














ChongqingWanzhou high-speed railway







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Chongqing–Wanzhou High-speed railway
渝万高速铁路
Overview
StatusPlanned
LocaleChongqing
Termini
  • Wanzhou North
  • Stations5
    Service
    TypeHigh-speed rail
    Operator(s)China Railway Chengdu Group
    Technical
    Line length291.3 km (181 mi)
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge
    Operating speed350 km/h (217 mph)

    Route map

    Wanzhou North

    Ruxi

    Zhongxian tunnel

    Zhongxian

    Fengdu tunnel

    Fengdu North

    Fuling North

    Fuling Yangtze River bridge

    Xinmiaochang

    Chongqing Station river crossing tunnel

    Chongqing

    Chongqing East

    to
    Chongqing
    West

    Jiulongpo

  • talk
  • edit
  • Chongqing–Wanzhou high-speed railway is the second route between Chongqing and Wanzhou after Chongqing–Wanzhou intercity railway. The Chongqing–Wanzhou high-speed railway, on a faster 350 kilometres per hour (220 mph) alignment, is expected to open in 2025. It will take a different route, heading south to serve Zhongxian and Fengdu with new railway stations and interchanging with the existing Fuling North railway station and terminating at Chongqing East.

    On 2 July 2018, initial plans for the railway, with seven stations, were unveiled.[1] Geological surveys began in 2020. The plans have been revised and the line will now have five stations. It is expected to be completed by 2025.[2]

    Stations[edit]

    Station Name Chinese Metro
    transfers/connections
    Chongqing East 重庆东  6   24   27 
    Fuling North 涪陵北
    Fengdu North 丰都北
    Zhongxian 忠县
    Wanzhou North 万州北

    References[edit]

    1. ^ 涪陵发布 (2019-02-20). "渝万高铁计划今年开工!途经涪陵!_手机网易网". 3g.163.com. Retrieved 2020-08-19.
  • ^ "渝万高铁时速350公里 设5个站点". www.cq.xinhuanet.com (in Chinese). Archived from the original on October 23, 2020. Retrieved 2020-08-19.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Chongqing–Wanzhou_high-speed_railway&oldid=1167291601"

    Category: 
    High-speed railway lines in China
    Hidden categories: 
    CS1 Chinese-language sources (zh)
    Articles with short description
    Short description matches Wikidata
    Articles containing Chinese-language text
     



    This page was last edited on 26 July 2023, at 22:00 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki