Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Network  





2 See also  





3 References  














High-speed rail in Austria






Français
Magyar
Türkçe

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


The West railway between the capital Vienna and Salzburg is being upgraded. Most new sections have a continuous maximum design speed of 250 km/h (155 mph).[1]

ÖBB Railjet train near PfarrwerfenonSalzburg-Tyrol Railway

German and Austrian ICE trains operate at a maximum speed of 230 km/h (145 mph), as do Austrian locomotive-hauled trains (called Railjet) which were launched in 2008. The section between Attnang-Puchheim and Salzburg has not been part of the massive investments during the past decades. Therefore a new high-speed rail line between Köstendorf and Salzburg is being planned by ÖBB. Long distance and freight trains are planned to run through a 21.3 km (13.2 mi) long new track that is designed for a maximum speed of 250 km/h (155 mph). This new infrastructure should enable to substantially increase the number of regional trains on the existing tracks and cut travel times for long distance connections by using the new tunnels. Construction works are expected to begin in 2025/2026.[2]

The 56 km (35 mi) Brenner Base Tunnel under construction will allow speeds of up to 250 km/h (155 mph).[3][4] The expected year of completion is 2032. [5] The first part of the New Lower Inn Valley Railway was opened in December 2012 as part of an upgrade of the line connecting the future Brenner Base Tunnel and southern Germany, which is being upgraded from two tracks to four and to a maximum design speed of 250 km/h (155 mph). The section is also part of the Berlin-Palermo railway axis.

The Koralmbahn, the first entirely new railway line in the Second Austrian Republic has been under construction since 2006. It includes a new 33 km (21 mi) tunnel (the Koralmtunnel) connecting the cities of Klagenfurt and Graz. Primarily built for intermodal freight transport, it will also be used by passenger trains travelling at up to 250 km/h (155 mph). The travel time between Klagenfurt and Graz will be reduced from three hours to one hour. The Koralmbahn is expected to be operational by 2025.[6] Another important project on the Southern Railway is the Semmering Base Tunnel. The new tunnel connects the states of Lower Austria and Styria and allows massive travel time reductions compared to the existing Semmering railway. The new base tunnel will become operational in 2028. [7]

Network[edit]

Railjet routes as of June 2020
Line Maximum speed Length Construction began Service started
Western Railway (Vienna - Attnang-Puchheim) 200/230 km/h (per sections)[8] 243 km (151 mi) Unknown (past) 1990 (Linz - Wels) to 2016 (Ybbs - Amstetten)[8]
New Lower Inn Valley railway (Kundl - Baumkirchen) 220 km/h[8] 40.236 km (25.001 mi) Unknown (past) 9 December 2012
Marchegger Eastern railway (upgrade Vienna Stadlau - Slovakian border) 200 km/h[8] 38 km[8] Unknown (past) 2025 (expected)[9]
Pottendorfer line (upgrade & new Vienna Inzersdorf Ort - Wr. Neustadt) 200 km/h[8] 47 km[8] Unknown (past) 2024 (expected)[10]
Koralm Railway (Graz - Klagenfurt) 250 km/h[8] 125 km (78 mi) 2001 2025 (expected)[11][8]
Semmering Base Tunnel (Gloggnitz - Mürzzuschlag) 230 km/h[8] 27.3 km (17.0 mi) 2012 2030 (expected)[12]
Brenner Base Tunnel & its Austrian access (Volders-Baumkirchen - Italian border) 250 km/h[8] 46 km[8] Summer 2006 2032 (expected)[13]
North Railway (upgrade Gänserndorf - Břeclav, Czech Republic) 200 km/h[8] 47 km[8] 2024 (expected)[8] 2030 (expected)
Western Railway (new line Köstendorf - Salzburg) 250 km/h 21.3 km (13.2 mi) 2025/2026 (expected) 2040 (expected)
New Lower Inn Valley railway (Kundl - Brannenburg, Germany) 230 km/h 25 km (16 mi) Unknown (future) Unknown (future)

See also[edit]

References[edit]

  1. ^ "ÖBB dementieren Meldungen über Verschiebung des Westbahn-Ausbaues". Austria Presse Agentur. Retrieved 2015-03-28.
  • ^ "Rund um die Planung". ÖBB-Infrastruktur AG (in German). Retrieved 2021-12-31.
  • ^ "Durchbruch am Brenner". Sueddeutsche Zeitung (in German). 2007-07-12. Archived from the original on 2008-05-23.
  • ^ Müller-Meiningen, Julius (2008-04-30). "Monumentales Superloch". Sueddeutsche Zeitung (in German). Archived from the original on 2008-05-23.
  • ^ "Brennerbasistunnel: Inbetriebnahme voraussichtlich erst 2032". Südtirol News (in German). Retrieved 2021-12-31.
  • ^ red, steiermark ORF at/Agenturen (2021-02-18). "Semmering-Basistunnel erst ab 2028 in Betrieb". steiermark.ORF.at (in German). Retrieved 2021-12-31.
  • ^ red, steiermark ORF at/Agenturen (2021-02-18). "Semmering-Basistunnel erst ab 2028 in Betrieb". steiermark.ORF.at (in German). Retrieved 2021-12-31.
  • ^ a b c d e f g h i j k l m n o Atlas, High-Speed Rail 2021 on the International Union of Railways (UIC) website.
  • ^ "Marchegger Ostbahn schon 2025 zweigleisig", 22 May 2021, orf.at.
  • ^ "Pottendorfer Line. Four Tracks between Vienna and Wiener Neustadt", oebb.at.
  • ^ [https://suedstrecke.oebb.at/en/#koralmbahn "Koralm Line Off to the south on 130 kilometres of new railway lines past 23 stations and through many new tunnels"], oebb.at.
  • ^ "Further delay to Semmering Base Tunnel". International Railway Journal. 2022-04-26. Retrieved 2022-04-27.
  • ^ Brenner Base Tunnel Delayed Modern Railways issue 874 July 2021 page 80

  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=High-speed_rail_in_Austria&oldid=1233276536"

    Categories: 
    High-speed rail in Austria
    Austria transport stubs
    Hidden categories: 
    CS1 German-language sources (de)
    Articles with short description
    Short description is different from Wikidata
    All stub articles
     



    This page was last edited on 8 July 2024, at 07:03 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki