Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Route data  





2 History  



2.1  Private railway  





2.2  After nationalization  





2.3  Discontinued/suspended section  







3 Stations  





4 Rolling stock  





5 References  














Kabe Line






Esperanto
Français

Italiano


 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Kabe Line
Overview
OwnerLogo of the West Railway Company (JR West) JR West
LocaleHiroshima Prefecture
Termini
  • Yokogawa
  • Aki-Kameyama
  • Stations14
    Service
    TypeRegional rail
    SystemHiroshima City Network
    History
    Opened1909
    Technical
    Line length15.6 km (9.7 mi)
    Number of tracks1
    Track gauge1,067 mm (3 ft 6 in)
    Electrification1,500 V DC, overhead lines
    Operating speed65 km/h (40 mph)

    The Kabe Line (可部線, Kabe-sen) is a railway line operated by West Japan Railway Company (JR West) within the city of Hiroshima in Japan. It connects Hiroshima Station and Aki-Kameyama StationinAsakita-ku. The actual junction station is Yokogawa. It is one of the commuter lines to Hiroshima.[1][2][3]

    Route data

    [edit]

    History

    [edit]

    Private railway

    [edit]

    The section now in operation of the Kabe Line was originally constructed by a private company and later purchased by Japanese Government Railways.

    The section was opened by Dainippon Kidō in four phases.

    The line was handed over to Kabe Kidō on 11 March 1919. Kabe Kidō was merged to Hiroshima Denki Kidō on 1 May 1926.

    The line was originally built to 762 mm (2 ft 6 in) gauge and not electrified. The line was electrified and re-gauged (to the national standard of 1,067 mm (3 ft 6 in)) in the following steps.

    The line was handed over to the Kōhin Railway on 1 July 1931. On 1 December 1935, the line's legal status was changed from light railway to railway.

    After nationalization

    [edit]

    The line was nationalized on 1 September 1936, and became a part of Japanese Government Railways as the Kabe Line. Simultaneously, some station names were changed as follows:

    The line voltage was raised from 750 V to 1,500 V (JNR standard) on 23 April 1962.

    Since 4 September 1968, the line had been on the government's list of deficit-ridden railways where service was to be discontinued.

    After JR West took over the line in 1987, wanman driver-only operation was introduced on the Kabe – Sandankyō section.

    Beginning in summer 2007, the ICOCA card can be used in all stations in the Hiroshima City Network, including all stations on the Kabe Line.

    On 4 February 2011, it was announced that a 1.6 km (0.99 mi) section of the abandoned segment, between Kabe Station and the former Kōdo Station, would be electrified and reopened. This will be the first such reopening by a JR Group company since the privatization of Japanese National Railways (JNR).[4] Operation was scheduled to resume from fiscal 2015;[5] the two new stations at Kōdo-Homachigawa and Aki-Kameyama finally opened on 4 March 2017.[6]

    Discontinued/suspended section

    [edit]
    a train for non-electrified section at Kake Station

    JGR extended the line beyond Kabe Station. The extended sections were not electrified.

    The line was intended to be extended to Hamada station on the Sanin Main Line, and construction on that section commenced in 1974, before being abandoned in 1980.

    The Kabe – Sandankyō section was closed on 1 December 2003.[7]

    Stations

    [edit]

    Trains can pass at stations marked "||", "◇", "∨", and "∧". Trains cannot pass at stations marked "|".

    No. Station Japanese Distance
    (km)
    Transfers Tracks Location
    Sanyō Main Line
     JR-B01  Hiroshima 広島 Sanyō Shinkansen, Kure Line, Geibi Line, Hiroden Main Line || Minami
     JR-B02  Shin-Hakushima 新白島 Astram Line || Naka
    Kabe Line
     JR-B03  Yokogawa 横川 0.0 Sanyō Main Line, Hiroden Yokogawa Line Nishi
     JR-B04  Mitaki 三滝 1.1
     JR-B05  Aki-Nagatsuka 安芸長束 2.6 Asaminami
     JR-B06  Shimo-Gion 下祗園 3.9
     JR-B07  Furuichibashi 古市橋 5.3
     JR-B08  Ōmachi 大町 6.5 Astram Line |
     JR-B09  Midorii 緑井 7.3
     JR-B10  Shichikenjaya 七軒茶屋 8.0 |
     JR-B11  Bairin 梅林 9.6
     JR-B12  Kami-Yagi 上八木 11.2 |
     JR-B13  Nakashima 中島 12.6 | Asakita
     JR-B14  Kabe 可部 14.0
     JR-B15  Kōdo-Homachigawa 河戸帆待川 14.8 |
     JR-B16  Aki-Kameyama あき亀山 15.6

    Rolling stock

    [edit]

    New 2- and 3-car 227 series electric trains were introduced on the Kabe Line from around 2015,[6] replacing older 115 series trains.[8] By 2019, all Kabe Line services were operated by 227 series trains.[6]

    References

    [edit]
    1. ^ "Hiroshima station guide. How to change the trains, Shinkansen and local train to Miyajima. How to catch tram and loop bus Meipuru-pu". JPRail.com - Japan rail and train travel complete guide. 9 October 2016.
  • ^ "Hiroshima Access Guide: Transport and Getting Around". JapanTravel. 10 August 2020.
  • ^ "JR Kabe Line(Yokogawa-Aki Kameyama) (横川(広島県)-あき亀山) Route Infomation / Stop Station List - NAVITIME Transit". transit.navitime.com.
  • ^ JR廃線、初の復活…広島市の可部線 [First-ever reopening of an abandoned JR line: the Kabe Line in Hiroshima]. Yomiuri Shimbun (in Japanese). 4 February 2011. Retrieved 6 February 2011.
  • ^ 可部線、15年度に延伸 [Kabe Line to be extended in fiscal 2015]. The Chigoku Shimbun Online (in Japanese). Japan: Chugoku Shimbun. 1 January 2013. Retrieved 8 January 2013.
  • ^ a b c "JR可部線、コロナ禍を経ても混雑が激化 - 2021年度の混雑率132%に" [JR Kabe Line faces increasing congestion in spite of coronavirus pandemic, with a 132% congestion rate in fiscal 2021]. Mynavi News (in Japanese). 23 July 2022. Retrieved 25 July 2022.
  • ^ "旧戸河内駅、残るは表示板のモニュメントのみ 実は開通前から廃止検討の声も【廃線20年 可部線今昔】②". Chugoku Shimbun (in Japanese). 5 December 2023. Archived from the original on 6 December 2023. Retrieved 2 February 2024.
  • ^ JR西日本、広島地区に227系近郊形直流電車を投入 [JR West to introduce 227 series DC suburban trains in Hiroshima area]. The Page (in Japanese). Japan: Wordleaf Corporation. 19 June 2014. Archived from the original on 19 June 2014. Retrieved 19 June 2014.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Kabe_Line&oldid=1228520231"

    Categories: 
    Kabe Line
    Railway lines opened in 1909
    1067 mm gauge railways in Japan
    2 ft 6 in gauge railways in Japan
    Hidden categories: 
    CS1 uses Japanese-language script (ja)
    CS1 Japanese-language sources (ja)
    Articles with short description
    Short description matches Wikidata
    Use dmy dates from July 2018
    Articles containing Japanese-language text
    Articles needing additional references from January 2013
    All articles needing additional references
    Commons category link from Wikidata
     



    This page was last edited on 11 June 2024, at 17:53 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki