Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Plant  





2 Capacity  





3 See also  





4 References  














Kakatiya Thermal Power Station







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 18°2315N 79°5022E / 18.38750°N 79.83944°E / 18.38750; 79.83944
 

From Wikipedia, the free encyclopedia
 


Kakatiya Thermal Power Project at Bhupalpalle
Map
Official nameKTPP
Country
  • India
LocationGhanpur, Warangal district, Telangana
Coordinates18°23′15N 79°50′22E / 18.38750°N 79.83944°E / 18.38750; 79.83944
StatusOperational
Commission dateUnit 1: February 2009
'Under implementation'
Unit 2: 2013
Operator(s)Telangana Power Generation Corporation Limited (TSGENCO)
Thermal power station
Primary fuelCoal
Power generation
Units operational1X500 MW
'Under implementation'
1X600
Nameplate capacity500 MW
'Under implementation'
600 MW

Kakatiya Thermal Power Station is located near Chelpur village of Ghanpur mandal in Warangal district of the Indian state of Telangana. The power plant is one of the coal based power plantsofTSGENCO

Plant[edit]

This power plant was developed in 2 stages. The first stage comprised one 500MW unit. The unit was synchronized to grid with oil firing on 31.03.2010 at 06:08 hrs. Coal firing was immediately taken up and the load was raised up to 84 MW and the unit was in service with this load for about 1 hour.[1]

Kakatiya TPP Unit-II 1X600MW, was synchronized to the grid at 03:00 hrs. on 22 October 2015 and loaded to 105 MW.

Capacity[edit]

Stage Unit Number Installed Capacity (MW) Date of Commissioning Status
Stage I 1 500 May, 2010 Running
Stage II 2 600 Jan, 2016 Running

[2]

See also[edit]

References[edit]

  1. ^ "Kakatiya Thermal Power Station" (PDF). Central Electricity Authority. Archived from the original (PDF) on 26 September 2010. Retrieved 26 August 2010.
  • ^ "BHEL commissions 600 MW Thermal Unit in Telangana | Central Chronicle". www.centralchronicle.com. Archived from the original on 25 April 2018. Retrieved 30 May 2017.

  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Kakatiya_Thermal_Power_Station&oldid=1041089561"

    Categories: 
    Coal-fired power stations in Telangana
    Hanamkonda district
    2010 establishments in Andhra Pradesh
    Indian power station stubs
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Use dmy dates from July 2019
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Thermal power station articles using Infobox power station
    All stub articles
    Pages using the Kartographer extension
     



    This page was last edited on 28 August 2021, at 14:06 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki