Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Capacity  





2 References  





3 External links  














Telangana Super Thermal Power Project







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 18°4518N 79°2837E / 18.75500°N 79.47694°E / 18.75500; 79.47694
 

From Wikipedia, the free encyclopedia
 


Telangana Super Thermal Power Project
Far view of NTPC Power Plant
Map
Location of the Telangana Super Thermal Power Project
Official nameTSTPP
CountryIndia
LocationTelangana
Coordinates18°45′18N 79°28′37E / 18.75500°N 79.47694°E / 18.75500; 79.47694
StatusUnder construction
Construction began29 Jan 2016
Commission dateUnit 1: 3 October 2023[1]
Construction cost10598.98 Crores
Operator(s)NTPC
Thermal power station
Primary fuelCoal
Power generation
Nameplate capacity
  • 800 MW

Telangana Super Thermal Power Project(TSTPP) is in Telangana, India. The power plant is under construction with power capacity of 1600 MW (2x800 MW) in first phase and in total planned capacity of 4000 MW.[2] It is the coal based power plant of National Thermal Power Corporation. It is being built near Ramagundam city in Peddapalli District.[3] The first Unit, 800MW, was inaugurated by PM Modi on 3 October 2023.[4][5] The second unit was inaugurated by PM Modi on 4 March 2024.[6]

Capacity[edit]

The first unit of 800MW was expected to be completed by the third quarter of 2020,[7] but construction was halted due to COVID-19.[8]

Unit Capacity (In MW) Date of Commissioning status
1 800 05.09.2023 Commissioned
2 800 Under construction

References[edit]

  1. ^ "Prime Minister Modi to dedicate to nation development projects worth ₹8,000 crore at Nizamabad on 3 Oct". 2 October 2023.
  • ^ "NTPC chairman visits thermal power project site". The Hindu. 19 February 2016. Retrieved 24 March 2016.
  • ^ "Telangana Super-Thermal Power Project, Telangana, India". NS Energy.
  • ^ "Prime Minister Modi to dedicate to nation development projects worth ₹8,000 crore at Nizamabad on 3 Oct". South First. 2 October 2023.
  • ^ "PM Modi inaugurates 800 MW unit of NTPC's Telangana super thermal power project - ET EnergyWorld". The Economic Times. 3 October 2023. Retrieved 4 March 2024.
  • ^ "PM Modi to inaugurate, lay foundation stone for NTPC's power projects worth over ₹30000 cr - ET Government". The Economic Times. 4 March 2024. Retrieved 4 March 2024.
  • ^ "Cabinet approves Proposal for higher allocation of power to Home State from Under Construction Projects of NTPC Ltd". pib.gov.in. Retrieved 4 March 2024.
  • ^ "NTPC resumes power plant work in Telangana". The Times of India. 4 May 2020. Retrieved 4 March 2024.
  • External links[edit]


  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Telangana_Super_Thermal_Power_Project&oldid=1225531553"

    Categories: 
    Khammam district
    Coal-fired power stations in Telangana
    2020 establishments in Telangana
    Indian power station stubs
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Use dmy dates from July 2019
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Thermal power station articles using Infobox power station
    All stub articles
    Pages using the Kartographer extension
     



    This page was last edited on 25 May 2024, at 01:13 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki