Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 Stations  





3 References  














MRT Line 4 (Dhaka Metro Rail)







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Mass Rapid Transit Line 4
Overview
Native nameম্যাস র‍্যাপিড ট্রানজিট লাইন ৪
StatusProposed
OwnerRoad Transport and Highways Division
LocaleGreater Dhaka, Bangladesh
Termini
  • Madanpur (East)
  • Stations8
    Colour on map     Dark Blue (#003DA5)
    Service
    TypeRapid transit
    SystemDhaka Metro Rail
    Operator(s)Dhaka Mass Transit Company Limited
    Depot(s)Madanpur, Bandar Upazila
    History
    Planned openingDecember 2030
    Technical
    Line length16 kilometres (9.9 mi)
    Number of tracks2
    CharacterElevated and underground
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge
    Electrification750 V DC third rail and 1,500 V DC overhead catenary
    Operating speed100 km/h (62 mph)
    Highest elevation13 metres (43 ft)

    Route map

    The MRT Line 4 (Bengali: এমআরটি লাইন ৪) of Dhaka Metro Rail is a proposed mass rapid transit line, stretching from the city's main railway station to the Bandar Upazila. This line is scheduled to be completed by 2030 and will be operated by the Dhaka Mass Transit Company Limited (DMTCL). South Korea has expressed interest to invest in this project.

    History

    [edit]

    In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka.[1] The World Bank helped to develop this plan, which proposed the construction of five MRT lines in Dhaka.[2] The five metro lines were MRT Line 1, MRT Line 2, MRT Line 4, MRT Line 5 and MRT Line 6.[3] In 2017, an agreement was signed between the government of Bangladesh and Japan to build MRT Line 4 on a Public Private Partnership (PPP) basis.[4] On 1 October 2019, Selina Hayat Ivy, the mayor of Narayanganj City Corporation submitted a written request to Obaidul Quader, the Road Transport and Bridges minister, to connect Narayanganj with the Dhaka Metro network.[5] Although, there was an existing plan to connect the city with Kamalapur by building MRT Line 4 which was proposed to be an underground line parallel with the Narayanganj–Bahadurabad Ghat line.[6] But due to the ongoing double line construction project to increase the commuter service on the line and the construction of the Dhaka–Jessore line, if MRT Line 4 is constructed there, there will not be enough passengers to make the metro line profitable, Dhaka Mass Transit Company Limited (DMTCL) has revised the alignment and changed the destination of the route to Madanpur.[7] In 2023, the government pulled out of the deal with Japan to build MRT Line 4 due to higher costs.[4] the government decided to request the Department of Economic Relations (ERD) to find donors to fund MRT Line 4.[8] ERD found World Bank, Japan and South Korea as potential donors.[9]

    Stations

    [edit]

    The MRT Line 4 is still in the planning stages. There may be changes to the list of stations, including adding new stations, assigning different names to the stations or some stations getting eliminated from the line. Hence, the list of stations is not final and may be updated in the future.[10]

    Code Name Connections Location Opened
    English Bengali
    1 Kamalapur কমলাপুর Bus interchange Bus station

    Bangladesh Railway  MRT Line 1 
     MRT Line 2 
     MRT Line 6 

    Motijheel Thana 2030
    2 Sayedabad সায়েদাবাদ Jatrabari Thana
    3 Jatrabari যাত্রাবাড়ী
    4 Shonir Akhra শনির আখড়া
    5 Signboard সাইনবোর্ড  MRT Line 2  Siddhirganj Thana
    6 Chittagong Road চট্টগ্রাম রোড
    7 Kanchpur কাঁচপুর Sonargaon Upazila
    8 Madanpur মদনপুর Bandar Upazila

    References

    [edit]
    1. ^ Rahman, Shamim (23 December 2022). "পুরোটাই উড়ালপথে নির্মাণ ভারতের 'মেট্রো ম্যান' শ্রীধরনের পরামর্শে". Bonikbarta.net (in Bengali). Archived from the original on 26 December 2022. Retrieved 26 December 2022.
  • ^ Zaman, Sheikh Shahriar (25 December 2022). "মেট্রোরেল ছিল বিরাট এক চ্যালেঞ্জ". Bangla Tribune (in Bengali). Archived from the original on 25 December 2022. Retrieved 26 December 2022.
  • ^ "এয়ারপোর্ট থেকে কমলাপুর আন্ডারগ্রাউন্ড লাইন হচ্ছে". Kaler Kantho (in Bengali). 14 October 2019. Archived from the original on 9 December 2019. Retrieved 10 March 2023.
  • ^ a b Rahman, Arifur (9 April 2023). "South Korea to finance construction of Kamalapur-Narayanganj route". Prothom Alo. Retrieved 18 August 2023.
  • ^ Sharif, Sahed (3 December 2019). "মেট্রোরেলের আওতায় আসছে নারায়ণগঞ্জ". Bangla Tribune (in Bengali). Retrieved 18 August 2023.
  • ^ Byron, Rejaul Karim; Adhikary, Tuhin Shubhra (15 October 2019). "Dhaka Metro Rail: Two more lines to cost Tk 93,800cr". The Daily Star. Archived from the original on 24 January 2020. Retrieved 8 October 2021.
  • ^ "ঢাকা-নারায়ণগঞ্জ মেট্রোরেলে যাত্রী না মেলার শঙ্কায় পাল্টে যাচ্ছে গতিপথ". Amader Shomoy (in Bengali). 4 March 2022. Retrieved 18 August 2023.
  • ^ Kabir, FHM Humayan (1 April 2023). "Govt plans to start construction of MRT-2 and MRT-4". The Financial Express. Retrieved 14 August 2023.
  • ^ Adhikary, Tuhin Subhra (1 May 2023). "Metro Line-2, -4: Japan, S Korea, WB show interests". The Daily Star. Retrieved 18 August 2023.
  • ^ "Frequently Asked Questions (FAQs) of MRT Line-4".

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=MRT_Line_4_(Dhaka_Metro_Rail)&oldid=1226440724"

    Categories: 
    Dhaka Metro Rail lines
    Sonargaon Upazila
    Bandar Upazila
    Proposed railway lines in Bangladesh
    Standard gauge railways in Bangladesh
    Hidden categories: 
    CS1 Bengali-language sources (bn)
    Articles with short description
    Short description is different from Wikidata
    Articles containing Bengali-language text
     



    This page was last edited on 30 May 2024, at 17:18 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki