Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Background  





2 Stations  



2.1  Northern Route  





2.2  Southern Route  







3 References  














MRT Line 5







Igbo
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Mass Rapid Transit Line 5
Overview
StatusApproved
OwnerRoad Transport and Highways Division
LocaleGreater Dhaka, Bangladesh
Stations29
Service
TypeRapid transit
SystemDhaka Metro Rail
Operator(s)Dhaka Mass Transit Company Limited
Depot(s)
  • Dasherkandi
  • Daily ridership1,230,000 (estimated)
    Technical
    Line lengthNorthern Route: 20 kilometres (12 mi)
    Southern route: 17.3 kilometres (10.7 mi)
    Number of tracks2
    CharacterElevated and underground

    Route map

    The MRT Line 5 (Bengali: এমআরটি লাইন ৫, romanised: Em-Ar-Ti Lain Pachh) is an approved mass rapid transit line of Dhaka Metro Rail. It will be the third line of the Dhaka Metro Rail system. This line comprises Northern Route and Southern Route. The construction of the MRT Line 5's Northern Route began in 5 November 2023 and is scheduled to commence operation by 2028.[1]

    Background

    [edit]

    In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka.[2] The World Bank helped to develop this plan, which proposed the construction of five MRT lines in Dhaka.[3] The five metro lines were MRT Line 1, MRT Line 2, MRT Line 4, MRT Line 5 and MRT Line 6.[4]

    Stations

    [edit]

    Northern Route

    [edit]

    The construction of the Northern Route of the MRT Line 5 will start in July 2023 and will end by 2028.[5]

    Code Name Connections Location Opened
    English Bengali
    1 Hemayetpur হেমায়েতপুর Savar Upazila Planned
    2 Baliarpur বালিয়ারপুর
    3 Bilamalia বিলামালিয়া
    4 Amin Bazar আমিনবাজার
    5 Gabtoli গাবতলী  MRT Line 2 
     MRT Line 5S 
    Mirpur Model Thana
    6 Darus Salam দারুস সালাম Darus Salam Thana
    7 Mirpur 1 মিরপুর ১ Mirpur Model Thana
    8 Mirpur 10 মিরপুর ১০  MRT Line 6 
    9 Mirpur 14 মিরপুর ১৪
    10 Kochukhet কচুক্ষেত Cantonment Thana
    11 Banani বনানী Banani Thana
    12 Gulshan 2 গুলশান ২ Gulshan Thana
    13 Notun Bazar নতুন বাজার  MRT Line 1  Vatara Thana
    14 Vatara ভাটারা

    Southern Route

    [edit]

    The Southern Route of MRT Line 5 is still in the planning stages. There may be changes to the list of stations, including adding new stations, assigning different names to the stations or some stations getting eliminated from the line. Hence, the list of stations is not final and may be updated in the future.

    Code Name Connections Location Opened
    English Bengali
    1 Gabtoli গাবতলী  MRT Line 2 
     MRT Line 5N 
    Mirpur Model Thana Planned
    2 Technical টেকনিক্যাল Darus Salam Thana
    3 Kallyanpur কল্যাণপুর Kallyanpur
    4 Shyamoli শ্যামলী Adabar Thana
    5 College Gate কলেজ গেট Tejgaon Thana
    6 Asad Gate আসাদ গেট Mohammadpur Thana
    7 Russel Square রাসেল স্কয়ার Dhanmondi Thana
    8 Karwan Bazar কাওরান বাজার  MRT Line 6  Karwan Bazar
    9 Hatirjheel হাতিরঝিল Hatirjheel
    10 Tejgaon তেজগাঁও Tejgaon Thana
    11 Aftabnagar আফতাবনগর Gulshan Thana
    12 Aftabnagar Center আফতাবনগর সেন্টার
    13 Aftabnagar East আফতাবনগর পশ্চিম
    11 Nasirabad নাসিরাবাদ Badda Thana
    15 Desherkandi দাশেরকান্দি

    References

    [edit]
    1. ^ "Deal signed for developing MRT Line-5 depot". The Business Standard. 2023-05-23. Retrieved 2023-06-21.
  • ^ Rahman, Shamim (23 December 2022). "পুরোটাই উড়ালপথে নির্মাণ ভারতের 'মেট্রো ম্যান' শ্রীধরনের পরামর্শে". Bonikbarta.net (in Bengali). Archived from the original on 26 December 2022. Retrieved 26 December 2022.
  • ^ Zaman, Sheikh Shahriar (25 December 2022). "মেট্রোরেল ছিল বিরাট এক চ্যালেঞ্জ". Bangla Tribune (in Bengali). Archived from the original on 25 December 2022. Retrieved 26 December 2022.
  • ^ "এয়ারপোর্ট থেকে কমলাপুর আন্ডারগ্রাউন্ড লাইন হচ্ছে". Kaler Kantho (in Bengali). 14 October 2019. Archived from the original on 9 December 2019. Retrieved 10 March 2023.
  • ^ "Construction of Bangladesh's first underground metro line begins in July". www.dhakatribune.com. 2023-05-23. Retrieved 2023-06-21.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=MRT_Line_5&oldid=1226210721"

    Categories: 
    Dhaka Metro Rail lines
    Proposed railway lines in Bangladesh
    Japan International Cooperation Agency
    Standard gauge railways in Bangladesh
    MRT Line 5 (Dhaka Metro Rail)
    Hidden categories: 
    CS1 Bengali-language sources (bn)
    Articles with short description
    Short description matches Wikidata
    Pages with no gauge entered in Infobox rail line
    Articles containing Bengali-language text
     



    This page was last edited on 29 May 2024, at 06:37 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki