Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Description  





2 History  



2.1  New platforms  





2.2  HS2  







3 National Rail services  





4 Manchester Metrolink  



4.1  Services  





4.2  Ticket zones  







5 References  





6 External links  



6.1  National rail  





6.2  Metrolink  
















Manchester Airport station






Cymraeg
Français
مصرى
Nederlands
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 53°2154N 2°1623W / 53.36500°N 2.27306°W / 53.36500; -2.27306
 

From Wikipedia, the free encyclopedia
 

(Redirected from Manchester Airport railway station)

Manchester Airport

National Rail Manchester Metrolink

General information
LocationRingway, Manchester
England
Grid referenceSJ819853
Managed byTransPennine Express
Transit authorityTransport for Greater Manchester
Platforms4
Other information
Station codeMIA
Fare zone4 (Metrolink)
ClassificationDfT categoryB
Key dates
May 1993Opened
2004Refurbished
2008Third platform opened
2014Metrolink services begin
2015Fourth platform added
Passengers
2018/19Increase 5.708 million
2019/20Increase 5.747 million
2020/21Decrease 0.546 million
 Interchange  4,645
2021/22Increase 2.174 million
 Interchange Increase 14,518
2022/23Increase 3.917 million
 Interchange Increase 16,945

Notes

Passenger statistics from the Office of Rail and Road

Manchester Airport station is a railway, tram, bus and coach station at Manchester Airport, England which opened at the same time as the second air terminal in 1993. The station is 9+34 miles (15.7 km) south of Manchester Piccadilly, at the end of a short branch from the Styal line via a triangular junction between Heald Green and Styal stations. Manchester Metrolink tram services were extended to the airport in 2014 and operate to Manchester Victoria.

Description[edit]

The station is 9+34 miles (15.7 km) south of Manchester Piccadilly at the end of a short branch from the Styal Line constructed by British Rail in 1993. A branch of Manchester Metrolink runs into it. It is accessed via a triangular junction located between Heald Green and Styal. The station platforms are connected by escalator, lift, ramps and an elevated covered walkway (known as the "Sky Link") to the airport terminal buildings in which is a staffed railway ticket office. Throughout the airport complex, the railway station is known as "The Station" and is signposted as such.

History[edit]

New platforms[edit]

In December 2008, a third platform opened after a year of construction and a total cost of £15 million. The following year Network Rail noted that it had "greatly increased operational flexibility at the station, and reduced the number of times that late-running trains had had to be terminated at Manchester Piccadilly."[1]

In 2009, Network Rail stated that the creation of the third platform has meant that the capacity at Manchester Airport will become constrained by the layover of the trains and congestion at the throat. To solve this issue they have recommended building a line underneath the airport towards Northwich in the 2019 to 2024 period.[2]

In July 2012, support for a fourth railway platform was announced by the Government.[3] The current platforms are eight carriage lengths long, so each can accommodate two trains of four carriages. A fourth platform will allow greater use of longer trains of six carriages or more. This had been recommended as part of the Northern Hub scheme of rail improvements around Manchester by the 2010 Manchester Hub Rail Study and the 2011 Northern Route Utilisation Strategy, with an estimated cost of £23 million.[4]

In February 2014, construction commenced on a new £20m fourth platform at the station. The start of construction was attended by the Chancellor of the Exchequer, George Osborne. Construction of the new platform was completed in May 2015 - three years earlier than the 2018 estimate given in 2012.[5][6] This was to allow engineering work to overlap with that being done on the Manchester Metrolink extension to the airport (see below) so that the fourth platform could be used for the extra traffic generated by the Ordsall Chord (opened 10 December 2017), while the fourth platform itself opened to passengers in Autumn 2015.[7][8]

HS2[edit]

In January 2013, the Government announced that Manchester Airport would be included in the second phase of the High Speed 2 railway line. This will enable Manchester Airport to be reached from London Euston in 59 minutes. The new line and associated new station will pass to the west of the Airport, away from the existing railway station and transport interchange, giving the airport two disconnected railways stations approximately 1 mile apart.[9]

The proposed Manchester Airport High Speed Station

However, on 4 October 2023 it was confirmed by the United Kingdom government under Prime Minister Rishi Sunak and Chancellor Jeremy Hunt that the Manchester leg of High Speed 2 would be scrapped, and as a result, the new high-speed station at Manchester Airport would not be built. [10]

National Rail services[edit]

Map showing heavy rail and Metrolink access to the airport
First TransPennine Express Class 185 on platform 2 (was 1a) arriving from Manchester Piccadilly

The station is managed by TransPennine Express (TPE). All services are operated by TPE, Northern Trains and Transport for Wales (TfW). There are eight trains per hour (tph) to Manchester Piccadilly and beyond, seven of which start and end their journeys here, and the other continues south to Crewe via Wilmslow.

The current off-peak service pattern (as of December 2022) is as follows:

TransPennine Express[11]

Northern Trains[12]

Transport for Wales[13]

There are no long-distance services to the airport from the south; a Central Trains service from Skegness via Derby and Crewe was cut in 2003,[14] while Virgin CrossCountry services from Birmingham New Street to Edinburgh or Glasgow, were withdrawn the same year.

It was planned that infrastructure developments that are part of the Northern Hub system of schemes such as the Ordsall Chord should enable direct trains to Manchester Victoria and on towards Bradford from May 2019. However the introduction of the May 2018 timetable, one of the most radical in decades, caused punctuality through Manchester to drop sharply and it became common for TransPennine Express to terminate delayed services at Manchester Piccadilly or Victoria rather than continue onto the final destination at Manchester Airport.[15][16]

Any future additional services to the Airport are in doubt without further infrastructure works; unresolved issues surround the lack of new 'through' platforms at Manchester Piccadilly which have been shelved by the government and the Styal Line to Manchester Airport operating at full capacity with little resilience to absorb delays.[17]

Preceding station   National Rail National Rail   Following station
TerminusTransport for Wales Rail

Chester to Manchester Line

East Didsbury

TransPennine Express

Anglo-Scottish Route

Manchester Piccadilly

TransPennine Express

North TransPennine

Manchester Piccadilly

Gatley

Northern Trains

Manchester AirporttoBlackpool North

Heald Green

Manchester Piccadilly

Northern Trains

Windermere/Barrow-in-FurnesstoManchester Airport

Gatley

Heald Green

Northern Trains

Manchester AirporttoLiverpool Lime Street

Styal

Northern Trains

Styal line local stopping service

Manchester Metrolink[edit]

Manchester Airport
Metrolink station
Metrolink platforms
General information
LocationManchester
England
Coordinates53°21′55N 2°16′20W / 53.36540°N 2.27229°W / 53.36540; -2.27229
Line(s)Airport Line
Platforms1
Other information
StatusIn operation
Fare zone4
History
Opened3 November 2014; 9 years ago (2014-11-03)

Location

Map

The Manchester Metrolink light rail network was extended from St Werburgh's Road to Manchester Airport as part of the Phase 3 expansion project.[18] The Metrolink station has been built adjacent to the airport station.[19] It is the terminus of the Airport Line.

Following a period of uncertainty due to funding problems, the plans were finally given the go-ahead in May 2009. The confirmed route would not complete the full airport loop as proposed, but trams would run along the northern route via Wythenshawe. Completion of the western side of the loop is subject to further funding in a later project.[20][21] An opening date of Summer 2016 had originally been indicated for opening of the Airport line[22] but the line opened early on 3 November 2014.[23][24]

Services[edit]

Trams run between Manchester Airport and Victoria every 12 minutes.

Preceding station Manchester Metrolink Following station
Terminus Manchester Airport–Victoria Shadowmoss
towards Victoria

Ticket zones[edit]

With the introduction to a zonal ticketing system on Metrolink services in January 2019, Manchester Airport is located within zone 4.[25]

References[edit]

  • ^ Historic day for Greater Manchester's rail network Archived 22 October 2013 at the Wayback Machine, Transport for Greater Manchester, 16 July 2012
  • ^ Manchester Hub Rail Study, Network Rail, February 2010
    Northern Route Utilisation Strategy Archived 10 April 2015 at the Wayback Machine, Network Rail, May 2011, page 7 and pp. 55-56
  • ^ "Chancellor unveils the start of £600m rail investment in the north of England" (Press release). Network Rail. 7 February 2014. Retrieved 22 February 2017.
  • ^ "Manchester Airport station reopens after work to build a fourth platform is completed" (Press release). Network Rail. 9 February 2015. Archived from the original on 13 February 2015. Retrieved 13 February 2015.
  • ^ Bickerdike, Graeme (10 March 2015). "And then there were 4". Rail Engineer. Coalville. Archived from the original on 24 September 2015. Retrieved 10 June 2019.
  • ^ Cox, Charlotte (18 August 2015). "Manchester Airport rail station's fourth platform completed ahead of schedule". Manchester Evening News. Trinity Mirror. Retrieved 10 June 2019.
  • ^ Route HSM28 | Plan and Profile | Sheet 5 of 9 (PDF) (Map). 1:5000.
  • ^ "LIVE: HS2 Manchester link cancelled by Rishi Sunak - updates and reaction". 4 October 2023.
  • ^ "Timetables | Download timetables | First TransPennine Express". TransPennine Express. Retrieved 11 December 2022.
  • ^ "Northern Trains – Timetables". Northern. Retrieved 11 December 2022.
  • ^ "Wales & UK Train Timetables - TfW". Transport for Wales. Retrieved 11 December 2022.
  • ^ "Train services to be cut". BBC News. 17 February 2003.
  • ^ "'Unacceptable #NorthernFail' - the travel chaos passengers faced on first working day of new Northern timetable". Manchester Evening News. 21 May 2018. Retrieved 21 May 2018.
  • ^ "A big chunk of Northern's timetable is back on Monday - but not for many Greater Manchester passengers". Manchester Evening News. 29 July 2018. As an industry we are really sorry for the impact that this has had on customers. Congestion on the network within the Manchester area has been a factor in the disruption and as all our services run through this corridor this caused a knock-on effect on our services across the North.
  • ^ "Timetable recast: too much, too quickly". Railway Gazette. 4 June 2018. Archived from the original on 13 August 2018. Retrieved 13 August 2018.
  • ^ "Metrolink Future Network" (PDF). GMPTE. 2006. Archived from the original (PDF) on 17 July 2006. Retrieved 28 December 2008. - map of the proposed network expansion
  • ^ "Metrolink Network - proposed South Manchester & Manchester Airport extension (map)". GMPTE. 2005. Archived from the original on 20 July 2011. Retrieved 21 May 2009.
  • ^ "Metrolink: back on track?". BBC Manchester. 13 May 2009. Retrieved 17 May 2009.
  • ^ Linton, Deborah (13 May 2009). "£1.4bn transport deal unveiled". Manchester Evening News. Archived from the original on 23 December 2012. Retrieved 17 May 2009.
  • ^ "Airport line". Manchester Metrolink. Transport for Greater Manchester. Archived from the original on 13 November 2012. Retrieved 19 May 2013.
  • ^ "Trams to Manchester Airport to arrive more than A YEAR early". Transport for Greater Manchester. Archived from the original on 30 June 2014. Retrieved 20 June 2014.
  • ^ "New Metrolink line to Wythenshawe and Manchester Airport to open on November 3 – a year ahead of schedule". Manchester Evening News. 13 October 2014. Archived from the original on 18 October 2014.
  • ^ "Metrolink ticket zones map". TfGM. Archived from the original on 6 December 2018. Retrieved 5 December 2018.
  • External links[edit]

    National rail[edit]

    Metrolink[edit]

    53°21′54N 2°16′23W / 53.36500°N 2.27306°W / 53.36500; -2.27306


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Manchester_Airport_station&oldid=1224592453"

    Categories: 
    1993 establishments in England
    Railway stations in Manchester
    DfT Category B stations
    Railway stations in Great Britain opened in 1993
    Airport railway stations in the United Kingdom
    Northern franchise railway stations
    Railway stations served by TransPennine Express
    Railway stations served by Transport for Wales Rail
    Tram stops in Manchester
    Railway stations opened by British Rail
    Manchester Airport
    Tram stops on the Manchester Airport  Victoria route
    Hidden categories: 
    Webarchive template wayback links
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Use dmy dates from October 2018
    Use British English from November 2017
    Articles with OS grid coordinates
    Pages with no open date in Infobox station
    Commons category link is on Wikidata
    Coordinates on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 19 May 2024, at 08:17 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki