Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 Operator  





3 Rolling stock  



3.1  Steam locomotives  





3.2  Diesel locomotives  







4 Route  



4.1  Stations  







5 See also  





6 References  



6.1  Notes  





6.2  Bibliography  







7 External links  














Matheran Hill Railway






Deutsch





Svenska
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Matheran Hill Railway

MHR train

TerminusMatheran
Commercial operations
Built byAdamjee Peerbhoy
Preserved operations
Operated byCentral Railways
Length21 km
Preserved gaugeft (610 mm)
Commercial history
Opened1907
Preservation history
HeadquartersNeral

The Matheran Hill Railway (MHR) is a ft (610 mm) narrow-gauge heritage railwayinMaharashtra, India, which is administered by the Central Railway zone. It covers a distance of 21 km (13 mi), cutting a swathe through forest and connecting NeraltoMatheran in the Western Ghats. The MHR is on the tentative list of UNESCO World Heritage Sites.[4]

History

[edit]

The Neral–Matheran Light Railway was built between 1901 and 1907 by Abdul Hussein Adamjee Peerbhoy and financed by his father, Sir Adamjee Peerbhoy, at a cost of Rupees 16,00,000.[5] Adamjee Peerbhoy visited Matheran often, and wanted to build a railway to make it easier to get there. Hussain's plans for the Matheran Hill Railway were formulated in 1900, and construction began in 1904. The consulting engineer was Everard Calthrop. The line was open to traffic by 1907. Its tracks were originally 30 lb/yd (14.9 kg/m) rails, but were upgraded to 42 lb/yd (20.8 kg/m) rails. The ruling gradient is 1:20 (five percent), with tight curves, and speed is limited to 12 km/h (7.5 mph).

When the railway was opened, the rolling stock consisted of just two locomotives, fifteen First Class, two Third Class coaches, two luggage vans with postal accommodation, twelve open goods wagons, along with two saloons that were in verge of completion at GIPR's Parel Locomotive Workshops. One Locomotive was taken from the Darjeeling Himalayan Railway as well.

Around 1907, only one locomotive would run on the railway at a time. The service had two trains each way per day.[6]

The railway was closed because of flood damage in 2005 and was not expected to reopen before April 2007.[7] However, the first run on the repaired railway was on 5 March 2007.[8] The line observed its centenary on 15 April of that year. Service had been suspended during the monsoon season (from June to October)[9] because of the danger of landslides. During the 2012 monsoon season, Central Railway (CR) tested the railway's air brakes and, after approval from the Commission of Railway Safety, ran the train during the monsoon for the first time.[10] CR planned to shorten the monsoon service suspension to 15 July – 1 October.[11]

In November 2012, CR added a special coach (known as a saloon) to trains operating on the line. The saloons have sofas and LCD screens showing images from outside the train. The saloons had been available only to railway officers.[12][13]

Operator

[edit]

The MHR and its assets, including the stations, line, and vehicles, belong to the Government of India and are entrusted to the Ministry of Railways. Central Railway handles day-to-day maintenance and management, and several programs, divisions, and departments of Indian Railways are responsible for repairs.

Rolling stock

[edit]

Steam locomotives

[edit]
Blu-and-white locomotive on a pedestal
Steam locomotive MLR-741 on display at the Matheran station

Consulting engineer Everard Calthrop designed the MLR Class 0-6-0Ts with Klien-Lindner axles to give a flexible wheelbase and four were supplied by Orenstein & Koppel. They ran from the railway's opening in 1907 until 1982, when they were replaced by diesel engines. By 1983, all steam locomotives were phased out. A B-class locomotive (#794) from the Darjeeling Himalayan Railway was transferred to the Neral–Matheran line in 2001 to test the feasibility of steam excursions.[4] It was sent to the Golden Rock workshops for conversion to oil firing in 2013, and returned to Neral soon afterwards.[14] Rail enthusiasts can once again enjoy and witness the 'steam-engine' on the Neral-Matheran toy train route. The steam engine will be fired either by electric power or hydrogen. Minister of Railways, Ashwini Vaishnaw informed that an electric and hydrogen propelled engine will be given the appearance of the old steam engine.[15]

Locomotive no. 738 is plinthed at the southern end of Neral Toy Train station, in a small garden. It was the engine in which Sir Abdul Hussein Adamjee Peerbhoy traveled, when he visited Germany to order the original four locomotives. (according to a plaque on the locomotive). No. 739 is preserved in the National Rail Museum, New Delhi, while No. 740 had been restored to full working order at Left South Tynedale Railway. No.741 is plinthed at Matheran Railway Station.

MHR No. Builder Builder No. From Location
738 O &K 1766 1905 Neral
739 O &K 2342 1907 Delhi
740 O &K 2343 1907 Left South Tynedale Railway
741 O &K 1767 1905 Matheran
794 Baldwin 44914 1917 Neral

Diesel locomotives

[edit]
Blue and white articulated diesel locomotive
NDM1 diesel locomotive No.501 at Neral Station
Yellow articulated diesel locomotive
NDM1A diesel locomotive No.551
Red 2 axle diesel locomotive
NDM6 diesel locomotive No.603 at Neral

Because of the line's sharp curves, only short-wheelbase four-wheel diesel units can be used; Class NDM1 and NDM6 locomotives are in use. Class NDM1 has two powered units, articulated with a central cab and initially developed by German builder Arnold Jung Lokomotivfabrik. The non-articulated Class NDM6 was manufactured by the Bangalore builders SAN.

ISR No. Class Builder Builder No. Date Status Notes
400 NDM-1 Indian Railways, Parel Works, Mumbai 2016 Delivered from Parel January 2016 In Neral shed awaiting commissioning, 1 April 2016
500 NDM-1 Jung 12108 1956 Withdrawn Originally No. 700 from Kalka-Shimla Railway
501 NDM-1 Jung 12109 1956; rebuilt at Parel 2002 In service Originally No. 750
502 NDM-1 Jung 12110 1956 Dismantled for repairs at Neral 1 April 2016 Originally No. 751
503 NDM-1 Jung 12111 1956 Withdrawn Originally No. 752
504 NDM-1 Jung 12105 1956 Withdrawn Originally No. 701 from Kalka-Shimla Railway
505 NDM-1 Jung 12107 1956 Withdrawn Originally No. 703 from Kalka-Shimla Railway
506 NDM-1 Jung 12106 1956 Withdrawn Originally No. 702 from Kalka-Shimla Railway
550 NDM-1A Indian Railways, Parel Works, Mumbai 2006 In service On Aman Lodge shuttle 7/3/15
551 NDM-1A Indian Railways, Parel Works, Mumbai 2006 In service On Aman Lodge shuttle 7/3/15
600 NDM6 SAN 559 1997 In service Repairs at Neral 1 April 2016
603 NDM6 SAN 568 1998 In service Recorded on 7 March 2015 on Aman Lodge shuttle

Route

[edit]

Neral, the starting point, is near Mumbai. The ft (610 mm) narrow-gauge line runs parallel to the broad-gauge line west of Hardal Hill before turning east to ascend towards Matheran. The rail and road meet near Jumapatti, and meet again after a brief separation at Bhekra Khud. After a short level stretch, there is a sharp ascent just before Mount Barry. A large horseshoe embankment was built to avoid a reversing station here. The line runs for a mile or so northwards around this before turning to take the One-Kiss Tunnel through the embankment. Two more zig-zags through deep cuttings remain before Panorama Point is reached, and then the line bends back to Simpson's Tank and ends at Matheran. It takes about two hours and 20 minutes to complete the 21-kilometre (13 mi) journey, although CR plans to reduce this to one hour 30 minutes.

Stations

[edit]

See also

[edit]

References

[edit]

Notes

[edit]
  1. ^ Fernandes, Felix (1 May 2011). "Matheran toy train service disrupted". Mumbai Mirror. Retrieved 8 July 2013.
  • ^ Verma, Kalpana (9 February 2009). "Toy train rams into tractor on Matheran-Neral route". Indian Express. Retrieved 8 July 2013.
  • ^ Mehta, Manthan K (30 June 2013). "Central Railway to run shuttle service between Aman Lodge and Matheran in monsoon". The Times of India. Retrieved 8 July 2013.
  • ^ a b "It's train, It's toy, It's beautiful commute". 2 October 2012. Retrieved 6 March 2016.
  • ^ See inscription at Commons image.
  • ^ Locomotive Magazine and Railway Carriage & Wagon Review. Locomotive Publishing Company. 1907.
  • ^ Why you still can’t take the toy train to Matheran[dead link]
  • ^ "Uphill Journey Resumes". 5 March 2007. Archived from the original on 25 May 2012. Retrieved 6 March 2016.
  • ^ "Central Railway seeks fresh nod to run Matheran toy train in rains – The Times of India". The Times of India. 21 September 2012. Retrieved 6 March 2016.
  • ^ "Matheran train ran in rains after 100 years | Latest News & Updates at Daily News & Analysis". dna. Retrieved 8 March 2016.
  • ^ "Aman Lodge–Matheran Station toy trains start today – Indian Express". www.indianexpress.com. Retrieved 8 March 2016.
  • ^ "CR makes uphill task enjoyable – Indian Express". www.indianexpress.com. Retrieved 8 March 2016.
  • ^ "Cash-strapped Matheran toy train will operate till 9pm - Hindustan Times". Archived from the original on 6 October 2014. Retrieved 7 January 2014.
  • ^ Verma, Kalpana (3 June 2013). "Steam locomotive set to return on Neral–Matheran route". The Indian EXPRESS. Retrieved 2 May 2016.
  • ^ Mehta, Manthank. "'Steam engine' to chug up Maharashtra's Matheran hills again but won't be fired by coal | Mumbai News - Times of India". Times City. The Times of India. Retrieved 6 January 2023.
  • Bibliography

    [edit]
    • Wallace, Richard (2021). "Chapter 6: The Matheran Light Railway". Hill Railways of the Indian Subcontinent. Ramsbury, Marlborough, UK: The Crowood Press. pp. 147–164. ISBN 9781785008085.
    [edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Matheran_Hill_Railway&oldid=1232092348"

    Categories: 
    2 ft gauge railways in India
    Mountain railways in India
    Railway lines opened in 1907
    Tourist attractions in Raigad district
    World Heritage Tentative List for India
    Hidden categories: 
    All articles with dead external links
    Articles with dead external links from February 2023
    Articles with short description
    Short description matches Wikidata
    Use dmy dates from March 2020
    Commons category link is on Wikidata
    Maharashtra articles missing geocoordinate data
    All articles needing coordinates
    Articles missing coordinates without coordinates on Wikidata
     



    This page was last edited on 1 July 2024, at 22:26 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki