Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 Test track  





3 2023 revelation of software sabotage  





4 Current products  



4.1  Production history  







5 See also  





6 References  





7 External links  














Newag






Čeština
Dansk
Deutsch
Esperanto
Français
Italiano
Magyar
Polski
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Newag S.A.
Company typePublic (Spółka Akcyjna)

Traded as

WSENWG
IndustryRailway rolling stock manufacturer
Founded1876
HeadquartersNowy Sącz, Poland

Key people

Zbigniew Konieczek [pl] (President and CEO)
Zbigniew Jakubas [pl] (Chairman of the supervisory board)
Products
  • locomotives
  • multiple units
  • trams
  • Revenue1,325,866,000 [1] (2020)

    Net income

    169,139,000 zł[1] (2020)

    Number of employees

    1,447[1] (2020)
    Websitewww.newag.pl
    Multiple unit ED78
    Diesel Locomotive 16D

    Newag S.A. (pronounced "nevag") is a Polish company, based in Nowy Sącz, specialising in the production, maintenance, and modernisation of railway rolling stock. The company's products include the 14WE, 19WE, 35WE types electric multiple units. The company has also developed the Nevelo prototype tram[2] and formed a consortium with Siemens Mobility for final assembly of Siemens Inspiro metro trains for the Warsaw Metro and Sofia Metro.

    History

    [edit]

    In 1876 (when Nowy Sącz was partitioned by Austria-Hungary), the Imperial–Royal Railway Workshops opened, serving the newly built Tarnów–Leluchów railway line [pl]. After the First World War and the establishment of the Second Polish Republic, the company, renamed "1st Class Main Workshop", was redirected to serve Polish State Railways (PKP), employing some 1,800 workers in 1922.[3]

    Inpost-World War II communist Poland the workshop was nationalised and later became a separate, though still state-owned, enterprise officially called "Nowy Sacz Railway Rolling Stock Repairs Depot in Nowy Sacz, State Independent Enterprise" (Polish: Zakłady Naprawcze Taboru Kolejowego『Nowy Sącz』w Nowym Sączu, Przedsiębiorstwo Państwowe Wyodrębnione; ZNTK Nowy Sącz), with a workforce of about 3,500 in 1952. ZNTK Nowy Sącz serviced its last steam locomotive (aTKt48) in 1972.

    After the fall of communism and the economic changes of 1989, ZNTK Nowy Sącz was transformed into a State Treasury Joint Stock Company, with the Polish state as the only shareholder. The company went through a period of financial turmoil around 2001 and its shares were acquired by a private domestic investor in 2003. The current name was adopted in 2005. In 2008, Newag acquired ZNTK Gilwice and subsequently integrated the latter's operations into the wider company.[4]

    In 2012, the first electric multiple unit from the 35WE series belonging to the Newag Impuls family of trains was produced. In 2013, the 31WE Impuls train achieved the speed of 211.6 kph on the Central Rail Line (CMK) setting a new record for a train designed and manufactured entirely in Poland.[5]

    In December 2013, the company made its debut on the Warsaw Stock Exchange with 43.47% of the company's shares having been sold.[6]

    In May 2024, the company secured a PLN 2.7 billion (EUR 740 million) contract with PKP Intercity, which aims to diversity its rolling stock, for the delivery of 35 hybrid dual-mode multiple units.[7]

    Test track

    [edit]

    The company has set up an electrified, 245 metre long test track to test the electric rolling stock it manufactures or modernises. The overhead can be supplied with any of the four systems, commonly used on European railways: 1.5 and 3 kV DC, 15 kV 16.7 Hz and 25 kV 50 Hz.[8]

    2023 revelation of software sabotage

    [edit]

    At the OhMyH@ck conference held in Warsaw on 5 December 2023, software engineers from white hat hacker group Dragon Sector revealed that they had reverse engineered the embedded softwareofNewag 45WE Impuls EMUs after operator Koleje Dolnośląskie had experienced a number of mysterious breakdowns when maintenance was performed by their selected contractor Serwis Pojazdów Szynowych (SPS).[9] In Newag's opinion, the issues were a result of malpractice by SPS and the trains should have instead been serviced by Newag.[10][11]

    Analysis of the software revealed that the train's embedded computers were programmed to lock up and display bogus fault messages and prevent the train from running if a GPS tracker detected that it spent a certain number of days in an independent repair company’s maintenance center, and also if certain replacement parts had a serial number not approved by the manufacturer.[12][13]

    In an investigation conducted with the help of the Polish Office of Rail Transport [pl] and CERT Polska, it was also discovered that the software locks could be bypassed by pressing a sequence of buttons in the cab of the train, although a later software update removed this ability.[14] The Dragon Sector group analysed 29 trains belonging to Koleje Dolnośląskie as well as other affected operators such as Koleje Mazowieckie, SKM Warszawa, WKD and Polregio, 24 of which had software locks which were removed using tools developed by the group. After those findings were made public, former Minister of Digital Affairs Janusz Cieszyński confirmed the Polish government and Polish intelligence agencies had known about the findings since May.[15] It was also revealed that the Polish Internal Security Agency (ABW) had, in October 2022, submitted a case against Newag regarding the abovementioned software manipulation incidents to the prosecutor's office in Nowy Sącz, which initially downplayed the incident until said findings publicly came to light, after which, the investigation was taken over by the regional prosecutor's office in Kraków on suspicion of crimes committed under Article 269 §1 and Article 286 §1 of the Polish Penal Code.[16]

    Newag strongly denied the claims they intentionally disabled their software and instead alleged SPS was propagating a conspiracy theory to avoid contractual penalties for being unable to service the trains. Newag also claimed there is no proof they are the author of the software or that the modifications had been introduced by them. Newag stated it would take legal action against SPS and the Dragon Sector group for slander and defamation.[17]

    The Dragon Sector hacker group subsequently gave a presentation at the 37th Chaos Communication Congress (37C3) in Hamburg on 27 December 2023, where they explained in detail the process of debugging the train software and their findings.[18]

    On 17 January 2024, the Sejm's Parliamentary Committee for Combating Transport Exclusion convened a hearing regarding the abovementioned allegations, whose participants included representatives of the Dragon Sector team, Newag, railway operators and members of the Sejm.[19]

    Current products

    [edit]

    Locomotives and EMU are available with optional last-mile diesel.

    Production history

    [edit]
    Own production
    electric multiple units
    14WE
    Halny
    19WE
     
    31WE
    Impuls
    35WE
    Impuls
    36WE
    Impuls
    37WE
    Impuls
    39WE
     
    45WE
    Impuls
     
    Inspiro
    diesel multiple units
    36WEhd
     
    220M
     
    221M
     
    222M
     
    226M
    Vulcano
    electric locomotives
    E4MSU
    Griffin
    E4DCU-DP
    Griffin
    E6ACT
    Dragon
    E6DCF-DP
    Dragon
    trams
    126N
    Nevelo
    Modernization
    electric multiple units
    EN57 EN71
    electric locomotives
    EU07
    303Eb
    EU07
    303Ec
    EP07P
    303Eb
    EP09
    104Ec
    EM10
    405Em
    3E-100
     
    ET22
    201El
    ET22
    201Ek
    ET22
    201Em
    EL2
     
    diesel locomotives
    6Dg 6Dl 15D/16D 18D 311D

    See also

    [edit]

    References

    [edit]
    1. ^ a b c "Newag Annual Reports" (in Polish).
  • ^ "Newag tram rolls onto the streets of Kraków". Railway Gazette International. Retrieved 1 July 2013.
  • ^ "Historia". newag.pl (in Polish). Retrieved 7 July 2024.
  • ^ "Gliwice: ZNLE S.A. został przejęty przez Newag". transinfo.pl (in Polish). 18 July 2008. Retrieved 7 July 2024.
  • ^ "Film z przejazdu 31WE na CMK z V=211 km/h". kurier-kolejowy.pl (in Polish). 4 March 2013. Retrieved 7 July 2024.
  • ^ "Newag wjeżdża na giełdę". bankier.pl (in Polish). 5 December 2013. Retrieved 7 July 2024.
  • ^ Lubomir Cech (23 May 2024). "35 New Newag Dual-Mode Multiple Units for PKP Intercity". railmarket,com. Retrieved 7 July 2024.
  • ^ "New test track at NEWAG". Newag. 26 November 2020.
  • ^ "O trzech takich, co zhakowali prawdziwy pociąg – a nawet 30 pociągów". Zaufana Trzecia Strona (in Polish). 2023-12-05. Retrieved 2023-12-05.
  • ^ "q3k :blobcatcoffee::『I can finally reveal some rese…』- Warsaw Hackerspace Social Club". 5 December 2023.
  • ^ Belanger, Ashley (2023-12-13). "Trains were designed to break down after third-party repairs, hackers find". Ars Technica. Retrieved 2023-12-14.
  • ^ "Skandal na polskiej kolei. Hakerzy ujawniają, kto stoi za tajemniczymi awariami pociągów". Onet Wiadomości (in Polish). 2023-12-05. Retrieved 2023-12-05.
  • ^ Koebler, Jason (13 December 2023). "Polish Hackers Repaired Trains the Manufacturer Artificially Bricked. Now The Train Company Is Threatening Them". 404 Media. Retrieved 14 December 2023.
  • ^ "q3k :blobcatcoffee::『The key unlock was deleted in …』- Warsaw Hackerspace Social Club". 5 December 2023.
  • ^ "Wielki skandal na kolei. ABW i premier od miesięcy wiedzieli o aferze z pociągami Newagu". Onet Wiadomości (in Polish). 2023-12-19. Retrieved 2024-01-01.
  • ^ "Afera z pociągami Impuls. Prokuratura początkowo zbagatelizowała sprawę". Rzeczpospolita (in Polish). Retrieved 2024-07-04.
  • ^ "Newag comes out fighting in claims over foul play". International Railway Journal. 2023-12-05. Retrieved 2023-12-08.
  • ^ Koebler, Jason (January 4, 2024). "Polish Hackers Say Manufacturer's Repair DRM Killed Train's Power, Broke Compressor". 404 Media. Retrieved January 4, 2024.
  • ^ "Parlamentarny Zespół ds. Walki z Wykluczeniem Transportowym". www.sejm.gov.pl. Retrieved 2024-07-04.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Newag&oldid=1233180883"

    Categories: 
    Rail vehicle manufacturers of Poland
    Locomotive manufacturers of Poland
    Polish brands
    Railway test tracks
    Companies established in 1876
    1876 establishments in Austria-Hungary
    Hidden categories: 
    CS1 Polish-language sources (pl)
    Articles with short description
    Short description is different from Wikidata
    Articles containing Polish-language text
    Commons category link from Wikidata
     



    This page was last edited on 7 July 2024, at 18:28 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki