Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Negotiations  





1.2  Agreement  





1.3  Construction  







2 Naming  





3 Station layout  





4 See also  





5 External links  





6 References  














North Triangle Common Station






Cebuano
Tagalog
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 14°3921N 121°141E / 14.65583°N 121.02806°E / 14.65583; 121.02806
 

From Wikipedia, the free encyclopedia
 


North Triangle Common Station
The construction progress of Area A in October 2023
General information
Other namesNorth Avenue Common Station
Unified Grand Central Common Station
North EDSA
Location
  • North Avenue, Bagong Pag-asa (MRT-7)
  • Quezon City, Metro Manila
    Philippines
    Owned by
  • Metro Rail Transit Corporation
  • Operated by
  • Light Rail Manila Corporation
  • Metro Rail Transit Corporation
  • SMC-Mass Rail Transit 7 Incorporated
  • Line(s)
  •      Line 3
  •      Line 7
  • PlatformsSide and island platforms
    Tracks7

    ConnectionsFuture:  MMS  North Avenue
    Construction
    Structure typeElevated
    ParkingYes (TriNoma, SM City North EDSA)
    Other information
    StatusUnder construction
    History
    Opening2024 (partial)[1]
    2025 (full)[1]
    Previous namesMetro Manila Integrated Rail Terminal
    Passengers
    478,000 (projected)[2]
    Services
    Preceding station LRTA_Logo
    Manila LRT
    Following station
    Terminus Line 1 Fernando Poe Jr.
    towards Baclaran
    Preceding station Manila MRT Following station
    Terminus Line 3 Quezon Avenue
    towards Taft Avenue
    Line 7 Quezon Memorial Circle

    The North Triangle Common Station[3][4] (official temporary designation: Unified Grand Central Station,[5] also called Grand Central Station), popularly known as the Common Station, is an under-construction[6] rapid transit terminal and transport hub that will connect LRT Line 1, MRT Line 3, and MRT Line 7,[7] and the nearby Metro Manila Subway.[8][9] It is located in Bagong Pag-asa, Quezon City, Philippines, and is named after its location, which is at the corner of EDSA and North Avenue.[10]

    The common alignment had been in limbo for years since the Department of Transportation and Communications (DOTC), now Department of Transportation (DOTr), reviewed the project's technical and financial components.[11] It was in January 2017 that an agreement was reached to build the station. The groundbreaking of the station was held at the North Triangle Transport Terminal in September 2017. The station was expected to fully open in January 2021 but that date has now been pushed back to 2025, with partial operations for MRT-3 and LRT-1 slated for the end of 2023.[12]

    History[edit]

    Negotiations[edit]

    On June 2, 2011, the Department of Transportation and Communications (DOTC) called for bidders for the contract to build the station, which was estimated to cost 1.5 billion.[7] But on July 13 of that year, then-Secretary of Transportation and Communications Mar Roxas announced a review of the project and considering adding store space for lease. The government, by that time, had allotted ₱2 billion for its construction.[10]

    On July 22, 2012, the government shelved the project indefinitely due to the Philippine financial crisis in favor of demolition of the tracks and pillars.[13] Secretary Roxas said that the station was being studied by engineers because the MRT-3's original plans did not include the station, and that problems with the line's timing system may arise. He included that in the event that the station does not go through, the ₱200 million paid by SM Prime Holdings, Inc., the operator of SM City North EDSA and other SM Malls, to the Light Rail Transit Authority for naming rights may have to be returned.

    However, at the start of 2013, Roxas' successor, Joseph Emilio Abaya announced that the government has cancelled and abandoned the project indefinitely because the construction of the common station was supposed to be completed back in May 2010 during the presidency of Gloria Macapagal Arroyo but disputes over cost, engineering issues and naming rights caused due to the halting of the project by Arroyo's successor President Benigno Aquino III on January 2, 2013.

    On January 9, 2013, Abaya announced that the government has filed for the candidacies for three sites of the common station linking three rapid transit systems for Metro Manila, DOTC is not keen on build the common station in front of the Annex Building of the SM City North EDSA shopping mall, adding that other potential locations are the TriNoma mall and the Malvar LRT stationinCaloocan. Abaya said the agency is awaiting the results of a study that would determine the final location of the common station. He had said the original design near SM City North EDSA Annex was "ineffective and costly" because the rails of Line 3 would have to be extended and trains would have to be added.[14]

    On November 21, 2013, the NEDA board, chaired by President Benigno Aquino III, approved the construction of a common station within North Avenue between SM City North EDSA and TriNoma, estimated to cost ₱1.4 billion. The station was set to feature head-to-head platforms for LRT 1 and MRT 3 trains with a 147.4 m (483 ft 7 in) elevated walkalator to MRT 7,[15] inconsistent with the original plan of having seamless connectivity to Monumento and is also an unusual arrangement of having two train stations beside each other.[16] Secretary Abaya said that SM would be able to keep the naming rights for the station, even if it is transferred near rival Ayala's TriNoma mall.[17] This led to the change of the station's location, which was initially set to be near SM City North EDSA, earning the ire of the group of the country's largest mall operator SM Prime Holdings Inc., which paid an initial ₱200 million for the naming rights of the station.

    Transportation officials have repeatedly said building the station near TriNoma is both economically and environmentally viable, as this would result in a lower cost and less urban blight.

    SM Prime then brought its battle to the Supreme Court, which issued a stay order against the DOTC and the Light Rail Transit Authority (LRTA) in June 2014, enjoining them to stop the transfer of the common alignment's location.[11][18][19]

    Agreement[edit]

    At a business forum held on August 12, 2016, Department of Transportation (now abbreviated as DOTr) Secretary Arthur Tugade said that all stakeholders namely Metro Pacific Corporation, SMC-Mass Rail Transit 7 Inc. of San Miguel Corporation, SM Prime Holdings, and Ayala Corporation had agreed in principle that the common station will be built in North Avenue between the Southeast end of SM North EDSA and North side of the TriNoma Mall.[20] Negotiations took about 8 years for the station to be built near SM North EDSA and TriNoma.[21]

    A memorandum of agreement was signed by the station's stakeholders on January 18, 2017.[5]

    Construction[edit]

    Area B construction progress in January 2020
    Area C construction progress in August 2022

    The groundbreaking ceremony of the station was held on September 29, 2017, marking the start of construction.[19] It is planned to be completed in 2023. Three areas were designated for the project with each area with its own developers. Area A which will host a platform and concourse for Lines 1 and 3 will be developed by the Department of Transportation. Area B, which covers two concourses that will connect Areas A and C will be developed by North Triangle Depot Commercial Corporation, an affiliate of Ayala Land. San Miguel Corporation will develop and finance Area C which will host the Line 7 platform. By January 2017, the projected cost for the station is ₱2.8 billion.[21][22]

    The construction of Area A is carried out by BF Corporation and Foresight Development and Surveying Company. The contract for the construction of Area A was signed on February 13, 2019.[23] The Area A involves a spur line branching from Line 1's portion, reusing the previously dug foundations originally intended for the station in front of SM North EDSA for its pier beams. All-steel girders will be used.

    As of January 31, 2023, the station is 79.72% complete.[24] The station was originally supposed to open in January 2021,[1] but mainly due to the COVID-19 pandemic, which affected manpower as well as construction logistics delays, the station opening was postponed to June 2023,[1] with full operations expected to begin by 2025.[1] Issues such as utilities relocation, the aforementioned pandemic-related issues, and systems upgrades (such as signalling & automated fare collection)[1] contributed to repeated completion delays. In April, additional delays have pushed back the opening of the common station to the end of 2023.[12]

    Naming[edit]

    In 2009, SM Prime Holdings which owns SM North EDSA secured naming rights for the station by paying ₱200 million while Ayala which owns TriNoma contributed ₱150 million which also made it eligible for naming rights.[5] In January 2017, it was agreed that naming rights of both SM Prime Holdings and Ayala will be honored and until the two companies agreed upon a name, the station shall be temporarily called as the Unified Grand Central Station.[5]

    Station layout[edit]

    The station is divided into three primary areas: A, B, and C. Area A hosts a platform and concourse for Lines 1 and 3. Area B will connect Areas A and C. Area C hosts a platform and concourse for Line 7.[21]

    See also[edit]

    External links[edit]

    References[edit]

    1. ^ a b c d e f Chavez, Cesar (February 20, 2023). "Common Station na magdurugtong sa MRT-3 at LRT-1, planong buksan sa Hunyo – DOTr" [Common Station that will connect MRT Line 3 and LRT Line 1, planned to open in June – DOTr]. Ito Ang Balita (Interview) (in Filipino). Interviewed by JP Nuñez. Philippines: UNTV News and Rescue. Retrieved February 21, 2023.[unreliable source?]
  • ^ Rosales, Clara (June 9, 2022). "LOOK: The Common Station Connecting Metro Trains is Almost Complete". reportr.world. Retrieved June 9, 2022.
  • ^ "Take a look at the North Avenue Common Station project". philkotse.com. Retrieved April 26, 2021.
  • ^ "North Triangle Common Station". Visionarch. Retrieved April 26, 2021.
  • ^ a b c d Gonzales, Yuji Vincent (January 19, 2017). "What will the MRT-LRT common station be called?". Inquirer.net. Retrieved January 19, 2017.
  • ^ Jiao, Claire (September 29, 2017). "LRT-MRT common station breaks ground". CNN Philippines. Archived from the original on April 11, 2018. Retrieved April 10, 2018.
  • ^ a b Montecillo, Paolo G. (June 5, 2011). "Bidders for LRT-MRT central station sought". Inquirer.net. Retrieved October 23, 2012.
  • ^ Pateña, Aerol John (February 13, 2019). "DOTr inks deal on common station construction". Philippine News Agency. Retrieved February 22, 2022.
  • ^ Department of Transportation (March 7, 2022). "DOTr - CONSTRUCTION OF COMMON STATION STRUCTURE TO BE COMPLETED BY END OF MARCH 2022 – TUGADE". dotr.gov.ph. Archived from the original on March 8, 2022. Retrieved March 31, 2022.
  • ^ a b Montecillo, Paolo G. (July 13, 2011). "DOTC reviews MRT-LRT central station project". Inquirer.net. Retrieved October 24, 2012.
  • ^ a b Marasigan, Lorenz S. (February 25, 2015). "SM ready to end feud with Ayala". BusinessMirror.
  • ^ a b Manabat, Jacque (April 12, 2023). "Opening of common station for train lines postponed anew". ABS-CBN News.
  • ^ Venzon, Cliff Harvey (July 23, 2012). "Central station near SM North shelved". BusinessWorld. Archived from the original on April 26, 2021. Retrieved April 26, 2021.
  • ^ Amojelar, Darwin G. (January 9, 2013). "DOTC to choose among 3 possible sites for common train station". Archived from the original on February 2, 2017.
  • ^ Tan, Kimberly Jane (November 21, 2013). "NEDA approves MRT 7, LRT-1 extension projects". GMA News and Public Affairs. Retrieved January 1, 2014.
  • ^ Marasigan, Gelo; Remitio, Rex (September 28, 2016). "Finally: A common station for LRT, MRT lines". CNN Philippines. Archived from the original on April 10, 2018. Retrieved April 10, 2018.
  • ^ "MRT-LRT common station to be located at Trinoma". ABS-CBN News. April 22, 2014.
  • ^ Flores, Mikhail Franz; dela Paz, Chrisee Jalyssa (August 2, 2014). "High court stops transfer of common train station site". BW. Archived from the original on June 16, 2018. Retrieved August 2, 2014.
  • ^ a b Fe, Kaye (September 29, 2017). "Construction of P2.8-B Grand Unified Central Station to begin after almost a decade of delay". Eagle News. Eagle Broadcasting Corporation. Retrieved September 29, 2017.
  • ^ Camus, Miguel R. (August 13, 2016). "Common railway station row resolved". Inquirer.net.
  • ^ a b c Ong, Jennifer (January 19, 2017). "MRT, LRT Common Station Construction To Start In 2017". International Business Times. IBT Media Inc. Archived from the original on January 31, 2017. Retrieved January 19, 2017.
  • ^ GMA News (January 18, 2017). Common station na magkokonekta sa LRT1, MRT3 at MRT7, sisimulan sa Disyembre. YouTube. Archived from the original on December 15, 2021. Retrieved May 19, 2021.
  • ^ Valdez, Denise A. (February 13, 2019). "Contracting arrangements finalized for common station". BusinessWorld. Retrieved August 15, 2021.
  • ^ "HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS". House of Representatives of the Philippines. Press and Public Affairs Bureau. February 16, 2023. Retrieved February 21, 2023.
  • 14°39′21N 121°1′41E / 14.65583°N 121.02806°E / 14.65583; 121.02806


    Retrieved from "https://en.wikipedia.org/w/index.php?title=North_Triangle_Common_Station&oldid=1228281080"

    Categories: 
    Manila Light Rail Transit System stations
    Manila Metro Rail Transit System stations
    Buildings and structures in Quezon City
    Railway stations under construction in the Philippines
    Railway stations scheduled to open in 2024
    Hidden categories: 
    Pages with non-numeric formatnum arguments
    CS1 foreign language sources (ISO 639-2)
    All articles lacking reliable references
    Articles lacking reliable references from October 2023
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Use Philippine English from January 2023
    All Wikipedia articles written in Philippine English
    Use mdy dates from June 2020
    Pages using infobox station with deprecated parameters
    Articles containing potentially dated statements from January 2023
    All articles containing potentially dated statements
    Coordinates on Wikidata
     



    This page was last edited on 10 June 2024, at 11:14 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki