Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Beginnings  





1.2  Formation of MRTC and construction of Line 3  





1.3  Contemporary history  







2 Project Funding Components  





3 See also  





4 References  





5 External links  














Metro Rail Transit Corporation







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Metro Rail Transit Corporation
FormerlyEDSA LRT Corporation, Ltd.
Company typePrivate
Founded1995; 29 years ago (1995)
FounderRobert John L. Sobrepeña
HeadquartersRenaissance Tower, Meralco Avenue, Ortigas Center, Pasig City, Philippines

The Metro Rail Transit Corporation (MRTC), is a private consortium organized in June 1995. The consortium is composed of seven (7) Filipino-owned companies: Fil-Estate Management Inc (now Metro Global Holdings Corporation), Ayala Land Inc, Ramcar Inc, Greenfield Development CorporationofUnilab, Anglo-Philippine Holdings Corporation, National Book Store Group, Allante Realty and Development Inc, and DBH Inc. The Metro Rail Transit Corporation owns the Manila Metro Rail Transit System Line 3 running along the EDSA corridor. MRTC was the original contractor for the EDSA MRT-3 Project. It runs the MRT-3 in coordination with the Department of Transportation under a 25-year Build-Lease-Transfer contract or BLT Agreement, which will end in 2025.

History

[edit]

Beginnings

[edit]

The MRT Line 3 project, originally known as the EDSA LRT III project, was planned by the then-Department of Transportation and Communications (later the Department of Transportation) in 1989. A letter of intent was submitted by Eli Levin of Eli Levin Enterprises, Inc. to the DOTC in 1990, under a build-operate-transfer scheme. Eli Levin incorporated EDSA LRT Corporation Ltd. (ELCL), a Hong Kong-based consortium consisting of ten foreign companies.[1]

The bidding for the EDSA LRT III project started in February 1991. Out of five companies that participated in the pre-bidding round, ELCL was the only company that met the requirements. On July 16, 1991, ELCL submitted a proposal for the EDSA LRT III project. The DOTC and ELCL signed a build-lease-transfer agreement on November 7. A revised and restated BLT agreement was signed on September 22, 1992. Under the agreement, the EDSA LRT III project will be covered in two phases: Phase 1 spans 16 kilometers (9.9 mi) from North AvenueinQuezon City until Taft AvenueinPasay, while Phase 2 spans 5.5 kilometers (3.4 mi) from North Avenue to Monumento, eventually meeting up with the LRT Line 1.[2] Phase 2, however, was shelved by the Arroyo administration in favor of the 5.7-kilometer (3.5 mi) LRT Line 1 north extension.

Formation of MRTC and construction of Line 3

[edit]

In June 1995, a newly formed consortium of reputable Philippine companies purchased an 85% stake in ELCL through EDSA LRT Holdings, Inc. (ELHI), a Philippine-registered company. ELHI also formed and owned MRT Development Corporation (MRT DEVCO), which acquired the development and commercial rights to develop the 16-hectare depot site and the 13 stations.[1] MRTC was formed for the purpose of designing, constructing, testing, commissioning, and maintaining the MRT Line 3.

In December 1995, ELCL's name was changed to Metro Rail Transit Corporation Ltd. ("Metro Rail") and ELHI was correspondingly renamed MRT Holdings, Inc.[citation needed]

Construction of the MRT Line 3 project began on October 15, 1996 with Sumitomo Corp as the main contractor and Mitsubishi Heavy Industries as the civil works sub-contractor. A revised build-lease-transfer agreement was signed on August 7, 1997. An amended turnkey agreement was later signed on September 16, 1997, with a consortium of companies (including Mitsubishi Heavy Industries and Sumitomo Corporation). A separate agreement was signed with ČKD Dopravní Systémy (ČKD Tatra, now part of Siemens AG), the leading builder of trams and light rail vehicles for the Eastern Bloc, on rolling stock. MRTC also retained the services of ICF Kaiser Engineers and Constructors (now Earthtech) to provide program management and technical oversight of the services for the design, construction management, and commissioning.[3]

From September 1995 to March 2002, MRTC oversaw the construction, financing and operational management of the project. JP Morgan and the management team of MRTC negotiated with the support of a team of technical experts and other advisors in arranging project financing totaling US$675.5-million from the Japan Bank for International Cooperation (formerly Japan Export-Import Bank or JEXIM), Investiční a poštovní banka, a consortium of Foreign Currency Deposit Unit (FCDU) banks led by Citibank, Bank of the Philippine Islands, Far East Bank, ING Bank, Metrobank and the Philippine Government under a Sovereign credit basis whose blended all-in financing cost amounted to only 4.72% p.a. over the entire life of the loan facilities. On October 17, 1997, MRTC obtained financial closure of the loans for the project.[2]

On December 10, 1997, a maintenance agreement was signed between MRTC, Sumitomo Corporation, and Mitsubishi Heavy Industries. Under the agreement, the maintenance provider will provide maintenance and repair services for a period of ten years for the MRT Line 3.

On December 15, 1999, the section of the MRT Line 3 from North AvenuetoBuendia was inaugurated,[4] with the line being fully operational on July 20, 2000.[2] MRTC was obligated to lease the system to DOTC, who would operate the system, with MRTC providing the maintenance. DOTC was required to make payments of rental fees to MRTC, and these were broken down into several different portions. One significant part was intended to repay the loans taken out to finance the project, in which the loans were fully repaid in 2010.[5]

Contemporary history

[edit]

Plans to buy out the MRT-3 from MRTC to the government were initiated, but this was not pursued.[6] On November 15, 2010,[2] Metro Pacific Investments Corporation entered into a cooperation agreement with Fil-Estate Corporation to pursue the expansion programs for the MRT3. However, it did not materialize as DOTC's cooperation could not be secured then.

In Oct 2012, MRT3 was carrying up to 600,000 passengers a day when DOTC cancelled the maintenance contract with Sumitomo / TESP and appointed local unqualified groups to handle the maintenance for the MRT3. As a result, the condition of the MRT Line 3 (MRT-3) deteriorated and received a barrage of complaints from loyal passengers due to severe lack of support and maintenance from its administrators. Technical problems became more and more frequent due to neglect and poor maintenance by contractors appointed by the then-Department of Transportation and Communications. A senator quoted, "People have to wait for one hour just to get inside a cramped broken train". A fare hike was also pushed in 2015 almost doubling the fare cost for commuters with the intention of collecting additional revenues to fund the improvement of its services.[7] The line's issues were resolved through a comprehensive rehabilitation project which returned Sumitomo Corporation as the maintenance provider of the line since 2019.[8][9] The rehabilitation of the entire system including replacement of all rails has been completed.

Project Funding Components

[edit]

A breakdown of the key funders and tranche funding components of the MRT-3 Phase-1 Project were as follows:

See also

[edit]
  • Line 2
  • Line 3
  • Line 4
  • Line 5
  • Line 6
  • Line 7
  • Line 8
  • Line 9
  • PNR Metro Commuter Line
  • List of rail transit stations in the Greater Manila Area
  • Manila Light Rail Transit System
  • Philippine National Railways
  • Department of Transportation (DOTr)
  • Transportation in the Philippines
  • References

    [edit]
    1. ^ a b "RESOLUTION - DIRECTING THE APPROPRIATE SENATE COMMITTEES TO CONDUCT AN INQUIRY IN AID OF LEGISLATION INTO THE OWNERSHIP, CONTROL AND OPERATION OF THE METRO RAIL TRANSIT III PROJECT (MRT3) WITH THE END IN VIEW OF ENACTING LEGISLATIVE MEASURES TO ADDRESS THE SAME" (PDF). January 25, 2011. Retrieved December 20, 2021.
  • ^ a b c d "About Us". Metro Rail Transit Corporation. Retrieved December 20, 2021.
  • ^ "About". dotrmrt3.gov.ph. Retrieved December 20, 2021.
  • ^ "Miracle rail project to rid Edsa of jams". New Straits Times. The New Straits Times Press (M) Bhd. December 15, 1999. Retrieved December 20, 2021 – via Google News Archive.
  • ^ "Got You! "Fixing MRT-3: Sobrepeña Option v. Japan ODA Option". Department of Transportation (Philippines) (Press release). June 14, 2018. Retrieved April 18, 2022.
  • ^ Desiderio, Louella (December 6, 2015). "DOTC to pursue buyout of MRT-3". The Philippine Star. Retrieved December 20, 2021.
  • ^ "LRT-MRT FARES TO BE INCREASED ON JAN.4". Department of Transportation and Communications (DOTC). Archived from the original on December 25, 2014. Retrieved December 20, 2021.
  • ^ Magsino, Dona (May 1, 2019). "MRT3 rehab, maintenance starts". GMA News Online. Retrieved February 18, 2022.
  • ^ Dumlao, Miggy (December 8, 2020). "MRT-3 now runs at 60 kph speed". Philippine Daily Inquirer. Retrieved February 18, 2022.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Metro_Rail_Transit_Corporation&oldid=1234999170"

    Categories: 
    Department of Transportation (Philippines)
    Transportation companies of the Philippines
    Companies based in Manila
    Rail transportation in Metro Manila
    Privately held companies of the Philippines
    1995 establishments in the Philippines
    Companies established in 1995
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Articles needing additional references from December 2021
    All articles needing additional references
    Use mdy dates from June 2020
    Use Philippine English from October 2022
    All Wikipedia articles written in Philippine English
    All articles with unsourced statements
    Articles with unsourced statements from December 2021
     



    This page was last edited on 17 July 2024, at 06:04 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki