Contents

   



(Top)
 


1 Design  





2 Capacity  





3 Construction  





4 Operation  





5 Criticism  





6 Rozelle Parklands  





7 References  





8 External links  














Rozelle Interchange







 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 33°5213S 151°1020E / 33.87028°S 151.17222°E / -33.87028; 151.17222
 

From Wikipedia, the free encyclopedia
 


33°52′13S 151°10′20E / 33.87028°S 151.17222°E / -33.87028; 151.17222

Rozelle Interchange


Exhaust stacks for the tunnels with green walls
Map
General information
TypeRoad junction
LocationRozelle
Lilyfield
Opened26 November 2023 (2023-11-26)
Built byJohn Holland CPB Contractors joint venture
Maintained byTransport for NSW
Roads at junction
  • M8 Motorway
  • Victoria Road
  • Western Distributor
  • City West Link
  • Western Harbour Tunnel
  • Location(s)
    LGA(s)Inner West

    The Rozelle Interchange is an underground motorway interchange in Sydney, New South Wales, Australia. It was built as part of WestConnex and opened to traffic on 26 November 2023.[1] The interchange includes a toll-free bypass of Victoria Road between the Iron Cove Bridge and the Anzac Bridge known as the Iron Cove Link.[2]

    The interchange is located at the site of the former Rozelle Rail Yards.[2] It is one of largest and most complex underground junctions in the world. It has three storeys of tunnels, with the deepest being 65 metres (213 ft) below ground.[3]

    The interchange will be the southern terminus of the under-construction Western Harbour Tunnel, which will be completed in 2028. Stub tunnels for the new tunnel were built during the construction of the interchange. On the surface above the underground interchange is a parkland known as Rozelle Parklands.

    The interchange has been described as "Australia's most complex underground junction" and a spaghetti junction.[4]

    Design

    [edit]

    The interchange consists of two parallel sets of main tunnels, originating from the M4 (west-facing only) and the M8 (east-facing only) sections of the M4–M8 Link respectively, as well as the Iron Cove Link tunnels.[5]

    The tunnels originating from the M4 mainly lead into the Western Distributor and the Anzac Bridge, with entry and exit ramps connecting to the future Western Harbour Tunnel. There is no connection between Victoria Road (Iron Cove Bridge) and the M4 tunnels via the Iron Cove Link.[5] Until the Western Harbour Tunnel opens, all eastbound traffic from the M4 tunnels lead to the Western Distributor and Anzac Bridge only, as there are no other exits.

    The tunnels originating from the M8 mainly lead into the future Western Harbour Tunnel, with entry and exit ramps connecting to the Iron Cove Link, towards Iron Cove Bridge, and City West Link. Traffic from the M8 exits at City West Link, west of The Crescent intersection, to access the Western Distributor and the Anzac Bridge via City West Link, and vice versa.[5]

    The Iron Cove Link tunnels connect between the Western Distributor/Anzac Bridge and Victoria Road at Iron Cove Bridge.[5] The Iron Cove Link is toll-free. It is the only component of WestConnex that is toll-free.[6]

    Future entrance and exit portals to the Western Harbour Tunnel have been built at the intersection of City West Link and The Crescent, which will become a four-way intersection when the Western Harbour Tunnel opens.[5]

    Capacity

    [edit]

    No provision has been made to increase the capacity on or after the Anzac Bridge to deal with extra traffic from the M8, M4 and Western Harbour Tunnel. In 2020, the N.S.W. government forecast an increase in bridge traffic of less than one percent,[7]: 7  so additional traffic from the new tolled tunnels must be offset by an induced reduction in traffic from the existing surface-road.[8]

    At the start of the project, in response to Local Council submissions raising the issue of local congestion and access, the N.S.W. government promised that local congestion would be relieved:

    "The approved project would improve the efficiency of existing infrastructure allowing for congestion to be relieved at key intersections on the existing road network. This includes improving on intersection performance on the congested section of the road network around the revised design at the City West Link/The Crescent and Victoria Road/The Crescent intersections."

    — WestConnex M4-M5 Link Rozelle Interchange …Response to submissions…, June 2020[7]

    Construction

    [edit]

    The main contractor for the construction of the interchange and Iron Cove Link was a joint venture between John Holland and CPB Contractors. Unlike the other stages of WestConnex, construction was directly managed by Transport for NSW rather than WestConnex.[2]

    Construction began in 2020, with the halfway mark achieved in April 2021.[3][9]

    Operation

    [edit]

    The Rozelle West motorway operations complex is located on the western end of the Rozelle Parklands, and it comprises the majority of the operations facilities for the Rozelle Interchange, including maintenance and operations, substation, fire water pumps and deluge tanks, water treatment plants etc.[10]

    Criticism

    [edit]
    Rozelle Interchange from Anzac Bridge shared path
    A warning sign for asbestos in Rozelle Parklands

    After opening to the public on 26 November 2023, the new arrangement caused severe congestion and delays during the morning and evening peaks, with extensive delays on non-tolled surface roads for both vehicles and public transport.[11]

    The removal of lanes to the Anzac Bridge from the City West Link and Victoria Road has been criticised.[12] Priority of traffic consisting of two lanes is given to the toll roads, whereas the other lanes are merged coming from Victoria Road and the Iron Cove Link Tunnel, supporting the maximum 4 lanes over the Anzac Bridge. This essentially affected all prior road users before the Interchange was opened.[13]

    The Iron Cove Link was criticised as being underused due to misleading signage at both the Iron Cove Bridge and Anzac Bridge, that misled vehicles that the Iron Cove Link was tolled, which was not the case. Issues with ambiguous, wrong, incomplete and too-late signage were reported.[14]

    Minister for Roads John Graham has proposed reducing truck movements during peak periods, and alterations to existing signage to the interchange.[15]

    After samples of asbestos were found in recycled mulch in the Rozelle Parklands, the site has temporary remained closed to the public.[16] Initial testing found no airborne particles which are dangerous to human health,[17] but investigation into the mulch supplier found asbestos at dozens of other sites across Sydney, triggering the Sydney asbestos mulch crisis.[18]

    Rozelle Parklands

    [edit]
    Rozelle Parklands and the tunnel stacks in the background

    Above the tunnels, at the location of the former rail yards, is a 10-hectare (25-acre) open green space known as the Rozelle Parklands. It has a wetlands, a village green, playing and barbecue facilities, and active transport links.[2][19][10] A shared user path bridge over City West Link connects the parkland to the Rozelle Bay light rail stop and the southern side of The Crescent. The Rozelle Parklands opened to the public on 17 December 2023, three weeks after the interchange opened.[20] The park was closed on 10 January 2024, less than a month after opening, due to the discovery of asbestos-contaminated mulch.[21] It was reopened on 28 March 2024.[22]

    The Rozelle Parklands was proposed as part of the urban design and landscape plan for the Rozelle Interchange project. The plan was released for community consultation in August and September 2020. During the community consultation, more than 1,600 individual comments and 723 official submissions of feedback were received. In response, Transport for NSW established the Rozelle Parklands Working Group (RPWG), which included local community member and representatives from the Department of Planning, Industry and Environment (DPIE), Office of Sport, Inner West Council and Transport for NSW.[19]

    The RPWG was responsible for managing the consultation and making recommendations to Transport for NSW. In May 2021, their final recommendations report was presented to the Minister for Transport and Roads, and the urban design and landscape plan was approved by the DPIE.[2]

    References

    [edit]
    1. ^ "Rozelle Interchange to open for Sydney drivers on Sunday morning". ABC News. 24 November 2023. Retrieved 24 November 2023.
  • ^ a b c d e "M4-M5 Link Rozelle Interchange". WestConnex. Retrieved 28 January 2023.
  • ^ a b "The complex spaghetti junction deep beneath Sydney's inner west revealed". Sydney Morning Herald. 26 September 2019. Retrieved 30 January 2023.
  • ^ "Motorist reversing, late lane changes: welcome to Sydney's spaghetti junction". The Sydney Morning Herald.
  • ^ a b c d e "Interactive Map". WestConnex. Retrieved 28 January 2023.
  • ^ "Rozelle Interchange tunnel design" (PDF). WestConnex. September 2019. Archived from the original (PDF) on 10 June 2020. Retrieved 10 June 2020.
  • ^ a b WestConnex M4-M5 Link Rozelle Interchange – Modification: The Crescent overpass and active transport links Response to submissions on the Design amendment report. N.S.W. Government. June 2020. Retrieved 7 December 2023.
  • ^ Standen, Christopher (6 December 2023). "The Rozelle interchange is working exactly as planned". The Sydney Morning Herald.
  • ^ "Halfway for Rozelle Interchange tunnelling". NSW Government. 8 April 2021. Retrieved 30 January 2023.
  • ^ a b "Rozelle Interchange Urban Design and Landscape Plan" (PDF). Transport for NSW. August 2020. Retrieved 28 January 2023.
  • ^ "Ten minutes to travel 90 metres: The big problems above the new Rozelle interchange". The Sydney Morning Herald.
  • ^ "Heavy traffic after Rozelle Interchange opens in Sydney". Nine News.
  • ^ "Sydney's City West Link to get extra lane space to ease Rozelle Interchange congestion". ABC News.
  • ^ "Rozelle Interchange sign 'confusing' motorists to be changed, peak-hour traffic delays reported in Sydney's inner west". ABC News.
  • ^ "Transport minister acknowledges Rozelle Interchange frustration as Rebel Wilson vents about congestion". ABC News.
  • ^ "More asbestos found in Sydney's Rozelle parklands garden mulch as investigation into source continues". The Guardian Australia.
  • ^ Lewis, Alexander (10 January 2024). "Rozelle Parklands temporarily closed after asbestos discovered in mulch near children's playground". ABC News. Retrieved 12 January 2024.
  • ^ "Sydney asbestos scare: How a mulch discovery has sent a city scrambling". 19 February 2024. Retrieved 20 March 2024.
  • ^ a b "Take a look: Rozelle Parklands fly-through". Rozelle Interchange: Interaction Construction Portal. Retrieved 28 January 2023.
  • ^ "Rozelle Parklands Opening Date Locked In". Transport for NSW. 11 December 2023. Retrieved 13 December 2023.
  • ^ "Mayor fumes as parklands above trouble-plagued Rozelle Interchange closed by asbestos scare". ABC News. 10 January 2024. Retrieved 20 March 2024.
  • ^ "Rozelle Parklands". Transport for NSW. 18 April 2024. Retrieved 23 June 2024.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Rozelle_Interchange&oldid=1235253558"

    Categories: 
    Road interchanges in Australia
    Transport infrastructure completed in 2023
    2023 establishments in Australia
    Rozelle, New South Wales
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Use dmy dates from January 2023
    Use Australian English from January 2023
    All Wikipedia articles written in Australian English
    Coordinates on Wikidata
    Commons category link is on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 18 July 2024, at 11:39 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki