Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Route  



1.1  Design  







2 History  



2.1  County of Cumberland planning scheme  





2.2  1984 scheme  





2.3  1994 scheme  



2.3.1  Tender process  





2.3.2  Planning  





2.3.3  Construction  







2.4  Post-opening  







3 Tolls  



3.1  Ownership  





3.2  Toll prices  







4 Exits and interchanges  





5 See also  





6 References  





7 External links  














Eastern Distributor






Deutsch
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Eastern Distributor


Tunnel entrance at Woolloomooloo
Eastern Distributor is located in Sydney
North end

North end

South end

South end

Coordinates
General information
TypeMotorway
Length4.7 km (2.9 mi)[1]
OpenedDecember 1999
GazettedJuly 1997[2]
Route number(s) M1 (2013–present)
Former
route number
Metroad 1 (1999–2013)
Major junctions
North end Cahill Expressway
Woolloomooloo, Sydney
 
  • Anzac Parade
  • Cross City Tunnel
  • South end Southern Cross Drive
    Kensington, Sydney
    Highway system

    The Eastern Distributor is a 4.7-kilometre-long (2.9 mi)[1] motorwayinSydney, New South Wales, Australia. Part of the M1 and the Sydney Orbital Network, the motorway links the Sydney central business district with the south-east[3] and Sydney Airport. The Eastern Distributor separates Sydney's Eastern Suburbs from Sydney's Inner-Southern Suburbs. The centre-piece is a 1.7 km (1.1 mi) tunnel running from WoolloomoolootoSurry Hills. Built as a build-own-operate-transfer project, it is 75.1% owned by Transurban.

    The motorway opened to traffic in December 1999, with the project fully completed in July 2000. It is only tolled in the northbound direction.

    Transurban considers the southern end of Cahill Expressway (including the Domain Tunnel) to be part of the Eastern Distributor, and denotes the latter to have a total length of 6 kilometres (4 mi).[4] The length of 4.7 kilometres (2.9 mi) used in this article refers to the length of the motorway constructed in the 1990s between the southern end of Cahill Expressway (Cowper Wharf Road) and the northern end of Southern Cross Drive (Link Road).

    Route[edit]

    Eastern Distributor trench section within South Dowling Street at Moore Park, just after the main tunnel.

    The Eastern Distributor commences at the southern end of Cahill Expressway and the interchange with Cowper Wharf Road in Woolloomooloo and heads in a southerly direction as a dual-carriageway six-lane surface road, before entering piggyback tunnels shortly afterwards under the suburbs of Woolloomooloo and Darlinghurst, with a subterranean interchange with the Cross City Tunnel for direct connections to the Western Distributor. After returning to the surface in Moore Park, it continues south in a trench inside South Dowling Street, before ending at the interchange with Link Road and continuing south as Southern Cross Drive.

    Design[edit]

    The project's centrepiece is the 1.7-kilometre (1.1 mi) piggyback tunnel under one of Australia's most densely populated urban areas, necessitated due to the requirement of three lanes in each direction within the existing roadway corridor.[5] The unique double-deck, three lanes per direction design comprises a large, single tunnel excavation. At mid-height through the excavation, a precast concrete ledge forms the base of the northbound tunnel, with the southbound tunnel slotting below. As a result, only one tunnel roof was created with the lower southbound carriageway built in a slot. According to the Australasian Tunnelling Society, no records are available of any piggyback tunnel (rail or road) where the upper carriageway has been carried on prestressed concrete planks resting on sidewall ledges. In the main tunnel there is a central length of 0.5 kilometres (0.3 mi) where the span is typically greater than 17 metres (56 ft), and of note, there is no record of any road tunnel with spans greater than this where permanent roof support comprises rockbolts and shotcrete only and with vertical unsupported sidewalls of rock.[6]

    At the time it was built, the tunnel's claim to fame was that at 24.5 metres (80 ft) across at its widest point, it was the widest tunnel in the world.[7] This point occurs where the William Street on ramp tunnel merges with the main tunnel.[6] At 14 metres (46 ft), the tunnel is also notably tall (from the ceiling to the floor).[8][7]

    The tunnels of the Eastern Distributor are fully equipped with lighting, ventilation, drainage, CCTV surveillance, fire fighting and emergency control systems.[6]

    History[edit]

    County of Cumberland planning scheme[edit]

    The need for an Eastern Distributor was first discussed in the early 1950s in the County of Cumberland planning scheme.[9]

    Underpasses of the Eastern Distributor beneath William Street and Taylor Street were proposed to commence construction in 1974.[10] The construction never eventuated.

    1984 scheme[edit]

    In 1984, the Department of Main Roads proposed construction of the Eastern Distributor as a surface freeway with underpasses at William Street and Oxford Street. It was later redesigned into a tunnel from north of William Street to the intersections of South Dowling Street, Moore Park Road and Anzac Parade. An Environmental Impact Statement (EIS) was prepared on 1985 to be built in three stages:[11][12][13][14]

    The William Street underpass (Stage 1) opened in November 1987 and connected Cahill Expressway and Palmer Street to Bourke Street. The underpass allowed southbound traffic from Cahill Expressway to avoid intersecting William Street.[15] The rest of the 1984 scheme was abandoned and not constructed due to escalating costs. The William Street underpass would eventually be closed twelve years later after the main Eastern Distributor tunnels opened to traffic in December 1999, to be reconstructed to form part of the Bourke Street on-ramp which opened seven months later.

    1994 scheme[edit]

    The completion of the Sydney Harbour Tunnel in 1992 resulted in an increase in volumes on Cahill Expressway and therefore an increased need for an inner-city bypass south and south-east of the expressway. Roads & Traffic Authority (RTA) undertook community consultation to gauge the level of community acceptance of construction of the Eastern Distributor as a toll road. With indications of a high level of community support, the Eastern Distributor project was revived by the New South Wales state government in 1994, based on the 1984 scheme. The Eastern Distributor would link the Sydney central business district with Sydney Airport via the already existing Southern Cross Drive (freeway), which would be widened.[8] It was designed to ease congestion and to reduce the time to travel from the city to the airport by bypassing 19 traffic lights.[8][16] A study commissioned by the State Chamber of Commerce in 1997 found that the "Eastern Distributor would prevent 330 accidents a year and cut fuel consumption by 1.2 million litres annually".[7]

    Tender process[edit]

    In May 1994, the state government gave approval for RTA to invite the private sector to tender to construct and operate the tollway under a build-own-operate-transfer arrangement. In February and March 1995, three proponents were invited to develop detailed proposals. RTA later requested the proponents to submit revised offers based on a concession term of 38 years, as "a term of 45 years would be unacceptable to the community" and the 38 year term had already been set as a precedent by the M2 Motorway.[11]

    The Labor state opposition promised that if elected, the Eastern Distributor would be toll-free.[12] When Labor was elected as government in March 1995, the formal tender process had already commenced, and the new government had to proceed with constructing the Eastern Distributor as a tollway.[11] In November 1995, the government agreed with RTA's recommendation to appoint Airport Motorway Limited (AML) as the successful proponent, with the government providing planning, support and management during construction.[11] The other two unsuccessful proponents were Baulderstone Hornibrook and Transfield.[11]

    The Keating federal government announced on 15 December 1995 that it intended to withdraw taxation concessions on infrastructure bonds for urban road projects, "effective immediately".[17] In a response letter written to the federal treasurer Ralph Willis in January 1996, the state treasurer Michael Egan highlighted that the policy would impact the M5 East and Eastern Distributor projects, and estimated that the policy would result in an "increase the cost of the Eastern Distributor project by between $70 million and $90 million".[11] As a result, the announcement was "sufficient to halt the progress of the Eastern Distributor project" and the appointment of AML as the successful proponent was not formally endorsed. The policy was not enacted into legislation by the Keating government prior to the March 1996 federal election. The newly-elected Howard government reversed the policy in June 1996 and confirmed that the Eastern Distributor has been certified as "an urban road project which may utilise infrastructure bonds for financing purposes".[11][17]

    Following the reversal of the federal government policy, on 13 August 1996 the appointment of AML as the successful proponent and the decision to proceed with the project was formally announced.[16][18][8] The agreement was signed in 1997, and under the concession agreement, AML would own and operate the tollway for 38 years after full opening.[19][11]

    Planning[edit]

    In 1994, RTA decided to delay the EIS until after the selection of the preferred proponent, explaining that if an EIS was prepared then (1994), then "it is unlikely to contain the most innovative solutions to construction and environmental issues and could require a further EIS being required before work could commence". However, there would be a risk that substantial changes to the EIS would risk a new tender.[11]

    The EIS for the Eastern Distributor was eventually exhibited in November to December 1996. 2,762 submissions were received during the exhibition period. RTA proposed significant modifications in April 1997, which included:[20]

    Due to the substantial modifications, RTA sought advice from the Independent Commission Against Corruption (ICAC) on whether a new tender was required; ICAC later advised that it was not required. The proposed modifications increased project costs by A$132 million. As a result, the concession period was increased from 38 to 48 years, and the opening toll price was also increased from A$2.50toA$3.00.[11][7]

    The New South Wales Audit Office undertook a performance audit of the proposed tollway and tabled its report in Parliament on 28 May 1997, with the report finalised in July 1997.[11] A planning assessment report by the Director-General of Department of Urban Affairs and Planning was published on 2 June 1997,[20] and the project was approved by the Minister for Urban Affairs and Planning on 26 June 1997, subject to 151 conditions.[12][19][21] Actual construction started soon after in August 1997.

    The passing of the Roads Act of 1993[22] updated road classifications and the way they could be declared within New South Wales. Under this act, the Roads & Traffic Authority (later Transport for NSW) declared the Eastern Distributor as Tollway 6007, from its interchange with Cahill Expressway and Cowper Wharf Road in Woolloomooloo (with an off-ramp just outside Hospital Road) to the interchange with Southern Cross Drive and Link Road in Kensington, on 4 July 1997, just before it started construction and 2.5 years before it had officially opened;[2] the tollway today still retains this declaration.[23]

    Construction[edit]

    Construction using 5,000 workers was undertaken by Leighton Contractors, who was a shareholder of Airport Motorway Limited.[8] Two separate tunnel subcontractors began excavating the northbound tunnel in January 1998, working at either end of the tunnel at Surry Hills and Woolloomooloo.[7] Seven roadheaders were utilised for the tunnel boring, with the rock ceiling then reinforced with rock bolts and shotcrete.[6] On 4 December 1998, the two teams were shaking hands in the middle, 30 metres (100 ft) beneath Taylor Square. By March 1999, all digging had been completed, after 400,000 cubic metres (520,000 cu yd) of soil, largely Sydney sandstone was removed, equal to 40,000 truckloads.[7]

    At a cost of $730 million,[8] the motorway was opened on 19 December 1999, except for the William Street on- and off-ramps which were opened on 23 July 2000, just in time for the 2000 Summer Olympics.[24] As part of the agreement which defined the 48 years of concession period, the motorway will be due to revert to government ownership on 23 July 2048.[25]

    After opening, a number of changes were made to surface streets:[12]

    Post-opening[edit]

    Soon after opening, southbound motorists were found to be entering the Eastern Distributor from the Cross City Tunnel access point and immediately attempting to cross three lanes for the Anzac Parade off-ramp on the other side of the carriageway. Permanent traffic obstacles were subsequently installed and users are now referred to the Lachlan Street/Dacey Avenue exit, or as through traffic towards Sydney Airport.

    Toll booths initially operated at toll points along the Eastern Distributor. With the progressive introduction of electronic tolls, these were replaced by readers on a gantry in 2012 and demolished.[26][27]

    Eastern Distributor was allocated part of Metroad 1 on its opening in 1999. With the conversion to the newer alphanumeric system in 2013, this was replaced with route M1.[28]

    In July 2017, the northbound off-ramp exit onto South Dowling Street towards Cleveland Street was closed off for 24 hours per day, 7 days a week, on a six-month trial (initially three months).[29] Prior to the closure, the exit was the last northbound exit before toll and was closed during morning and afternoon peaks. Vehicles would regularly queue at the South Dowling Street/Cleveland Street intersection and spill back onto the motorway via the exit. The trial closure saw significant improvements to traffic congestion along both South Dowling Street and the Eastern Distributor, and increase in speeds on both roads.[30][31] Following the successful trial, the exit was permanently closed in February 2018.[32]

    Tolls[edit]

    Ownership[edit]

    The Eastern Distributor is owned and operated by Airport Motorway Limited (AML), which is 75.1% owned by Transurban.[33] The remaining shareholders are Industry Funds Management (14.37%) and UniSuper (10.53%).[34][35]

    When AML was incorporated, Leighton Group held 11% of AML, with Macquarie Infrastructure Group being the holder of the balance.[36][37] Leighton sold its stake to Macquarie Infrastructure in 2000. By 2005, Macquarie Infrastructure Group held 71.35% of AML.[38] Macquarie Infrastructure Group spun off Sydney Roads Group including its stake in AML in July 2006.[39] Sydney Roads Group was sold to Transurban in April 2007.[40] In September 2007, Transurban further acquired a 3.75% stake in AML, increasing its stake to 75.1% stake which it held to this day.[41]

    Toll prices[edit]

    The Eastern Distributor is tolled in the northbound direction only for all traffic that use the main tunnel (Surry Hills/Moore Park to Woolloomooloo). There are two toll points on the Eastern Distributor: one at the northern end of the motorway and one at the William Street/Cross City Tunnel exit. Northbound vehicles along Eastern Distributor are charged the same toll price in either toll point.

    At the time of opening, the toll price for light vehicles (cars and motorcycles) was A$3.00.[42] In April 2003, the toll price for heavy vehicles (trucks and buses) was A$7.50.[43]

    Toll prices as of 1 January 2024[44]
    Toll road Class A toll prices[a] Class B toll prices[a] Toll increase[46] Toll concessionaire Expiry of toll concession[47]


    Eastern Distributor (northbound) $9.38 $18.76 Quarterly on 1 January, 1 April, 1 July, and 1 October, by the greater of the weighted sum of quarterly AWE and quarterly CPI or 1% Airport Motorway Limited
    (75.1% Transurban)
    July 2048


    1. ^ a b Class A vehicles are typically cars and motorcycles; Class B vehicles are all other vehicles including trucks and heavy vehicles.[45]

    Exits and interchanges[edit]

    LGALocationkm[1]miDestinationsNotes
    SydneySydney CBD0.00.0 Cahill Expressway (M1) – North Sydney, NewcastleNorthern terminus of road, route M1 continues north along Cahill Expressway
    Woolloomooloo0.10.062Toll point (for northbound traffic only)
    0.20.12Cathedral Street (east) – Woolloomooloo
    Palmer Street (south), to William Street (east) – Kings Cross, Double Bay, Woollahra
    Southbound exit only
    0.30.19Eastern Suburbs railway line
    0.40.25Northern end of tunnel
    Darlinghurst1.20.75Anzac Parade (south) – Randwick, La Perouse
    Moore Park Road (east) – Woollahra, Bondi Junction
    Southbound exit only
    1.30.81Bourke Street – WoolloomoolooSouthbound entrance only
    Cross City Tunnel (eastbound) – WoolloomoolooSouthbound entrance only
    1.60.99Anzac Parade (north) – Moore Park
    Moore Park Road (west) – Paddington
    Northbound entrance only
    1.651.03William Street – Kings Cross, Sydney CBD
    Palmer Street – Woolloomooloo
    Northbound exit only, toll point at exit
    Cross City Tunnel (west) – Sydney CBD
    Surry HillsMoore Park boundary2.11.3Southern end of tunnel
    2.21.4South Dowling Street (northbound) – Surry HillsNorthbound entrance only
    2.41.5L2 Randwick and L3 Kingsford light rail lines
    Moore Park2.5–
    2.8
    1.6–
    1.7
    Tunnel (under Cleveland Street)
    Moore Park–Redfern boundary3.22.0South Dowling Street (southbound), to Dacey Avenue and Lachlan Street – Randwick, Alexandria, RoseberySouthbound exit only
    Waterloo3.5–
    4.1
    2.2–
    2.5
    Dacey Todman Underpass tunnel[5]
    Sydney–Randwick boundaryZetlandKensington boundary4.42.7South Dowling Street (north) – Waterloo, Moore Park
    O'Dea Avenue (west) – Waterloo, Zetland
    Todman Avenue – Randwick, Kensington
    Northbound exit and southbound entrance only
    4.72.9Link Road – RoseberyNorthbound exit and entrance only
    Southern Cross Drive (M1) – Mascot, Wollongong, Canberra, Sydney AirportSouthern terminus of road, route M1 continues south along Southern Cross Drive
    1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Incomplete access
  •       Route transition
  • See also[edit]

  • flagNew South Wales portal
  • References[edit]

    1. ^ a b c Google (25 August 2021). "Eastern Distributor" (Map). Google Maps. Google. Retrieved 25 August 2021.
  • ^ a b "Roads Act 1993". Government Gazette of the State of New South Wales. No. 73. National Library of Australia. 4 July 1997. p. 5356. Archived from the original on 22 February 2024. Retrieved 22 February 2024.
  • ^ "Eastern Distributor - Linkt".
  • ^ "Eastern Distributor". Linkt. Retrieved 25 August 2018.
  • ^ a b Lai, Steven; Wong, Dee; Wu, Dicken (9 April 2009). "Fire and life safety designs for road tunnels in Asia" (PDF). Fire Division, Hong Kong Institution of Engineers. pp. 23–24. Archived from the original (PDF) on 29 January 2016.
  • ^ a b c d "Eastern Distributor, Sydney". Australasian Tunnelling Society. Archived from the original on 16 February 2011.
  • ^ a b c d e f "History". Eastern Distributor. Archived from the original on 25 April 2002.
  • ^ a b c d e f Jewell, Chris; Merrick, Noel (2003). "Modelling of the groundwater impact of a sunken urban motorway in Sydney, Australia" (PDF). RMZ – Materials and Geoenvironment. 50 (1): 229. Archived from the original (PDF) on 24 September 2015.
  • ^ £10 mil road plan to speed Sydney traffic The Sun 19 July 1950 page 12
  • ^ "Annual Report 1972–73" (PDF). OpenGov NSW. Department of Main Roads New South Wales. 1973. p. 11. Retrieved 27 August 2021.
  • ^ a b c d e f g h i j k "NSW Audit Office - Performance Reports – 1997 – Review of Eastern Distributor" (PDF). NSW Audit Office. July 1997. Retrieved 24 August 2021.
  • ^ a b c d "Cahill Expressway/Eastern Distributor/Eastern Freeway: History and Development". Ozroads. Retrieved 24 August 2021.[self-published source]
  • ^ "The Eastern Distributor – Preferred Scheme" (PDF). OpenGov NSW. New South Wales Department of Main Roads. 1985. Retrieved 24 August 2021.
  • ^ "Eastern Distributor – Environmental Impact Statement Report" (PDF). New South Wales Department of Main Roads. November 1985. Retrieved 24 August 2021.
  • ^ "The Eastern Distributor Stage 1 – William Street Underpass" (PDF). Expressway.online. New South Wales Department of Main Roads. Retrieved 24 August 2021.
  • ^ a b Ries, Ivor (14 August 1996). "Carr's tollway turnaround". Australian Financial Review. Retrieved 26 August 2021.
  • ^ a b "Annual Report 1996" (PDF). OpenGov NSW. Roads and Traffic Authority New South Wales. October 1996. p. 56. Retrieved 26 August 2021.
  • ^ City Tollway Fleetline issue 244 September 1996 page 163
  • ^ a b "Roads and Traffic Authority Annual Report 1996-97" (PDF). OpenGov NSW. Roads and Traffic Authority. 30 October 1997. p. 79,92. Retrieved 24 August 2021.
  • ^ a b "Proposed Eastern Distributor: Cahill Expressway to Mill Pond Road: volume 1: environmental impact assessment" (PDF). OpenGov NSW. Department of Urban Affairs and Planning. 2 June 1997. Retrieved 24 August 2021.
  • ^ "East link go-ahead". Daily Telegraph. 28 June 1997. p. 4.
  • ^ State of New South Wales, An Act to make provision with respect to the roads of New South Wales; to repeal the State Roads Act 1986, the Crown and Other Roads Act 1990 and certain other enactments; and for other purposes. Archived 11 August 2022 at the Wayback Machine 10 November 1924
  • ^ Transport for NSW (August 2022). "Schedule of Classified Roads and Unclassified Regional Roads" (PDF). Government of New South Wales. Archived from the original (PDF) on 25 August 2022. Retrieved 1 August 2022.
  • ^ "Eastern Distributor Construction Homes Damage". Parliament of New South Wales. 11 September 2001. Archived from the original on 24 September 2015.
  • ^ "Eastern Distributor". Roads and Maritime Services. Archived from the original on 25 June 2012.
  • ^ "Sydney Harbour Bridge's last toll booths to be removed". The Sydney Morning Herald. 15 June 2020. Retrieved 14 October 2022.
  • ^ "Eastern Distributor Toll Plaza". Ford Civil. Retrieved 25 August 2021.
  • ^ "Road number and name changes in Sydney" (PDF). Roads and Maritime Services. Transport for NSW - Roads and Maritime. 2013. Archived from the original (PDF) on 1 April 2019. Retrieved 23 July 2020.
  • ^ "Trial full closure of Eastern Distributor off ramp at Cleveland Street". Transport for NSW - Roads and Waterways. 3 July 2017. Retrieved 25 August 2021.
  • ^ "Cleveland Street Off Ramp Closure Trial - An interim update of the trial closure 24 hours a day 7 days per week" (PDF). Linkt. Retrieved 25 August 2021.
  • ^ "Saving travel times in the heart of Sydney". Transurban. 5 February 2018. Retrieved 25 August 2021.
  • ^ "Inquiry into progress under the National Road Safety Strategy 2011-2020 - Transurban submission" (PDF). National Road Safety Strategy. Transurban. March 2018. p. 9. Retrieved 25 August 2021.
  • ^ "Transurban turnover rises as traffic grows". The Sydney Morning Herald. 12 January 2012. Archived from the original on 13 January 2012.
  • ^ Li, Zheng; Hensher, David (September 2010). "Toll Roads in Australia: An Overview of Characteristics and Accuracy of Demand Forecasts". Transport Reviews. 30 (5): 541–569. doi:10.1080/01441640903211173. S2CID 153484704. Retrieved 23 October 2021.
  • ^ "NSW Legislative Council Inquiry into Road Tolling Regimes Portfolio Committee No 6 Transport and Customer Service" (PDF). Transurban. 23 May 2021. p. 10. Retrieved 23 October 2021.
  • ^ "Eastern Distributor to ease Sydney city congestion". TunnelTalk. February 1999. Retrieved 24 August 2021.
  • ^ "Leighton Group Concise Annual Report" (PDF). Leighton Group. 2000.
  • ^ "Macquarie hits the road running". Sydney Morning Herald. 8 February 2005.
  • ^ "Transurban takeover gets green light". Sydney Morning Herald. 8 March 2007.
  • ^ "Transurban finalises Sydney Roads takover". The Australian. 27 April 2007. Retrieved 5 November 2020.
  • ^ "Transurban Group Appendix 4E Year ended 30 June 2008" (PDF). ASX. Transurban. 2008. Retrieved 14 October 2021.
  • ^ "Sydney's great toll rort". The Daily Telegraph. 17 October 2009.
  • ^ "Eastern Distributor toll to rise". Sydney Morning Herald. 17 April 2003.
  • ^ "Toll costs by road". NSW Government. 1 January 2024. Retrieved 9 January 2024.
  • ^ "What is my vehicle class?". Linkt. Retrieved 5 November 2020.
  • ^ "When and how do toll prices increase". Linkt. Retrieved 5 November 2020.
  • ^ "Road tolling in New South Wales" (PDF). New South Wales Parliament. Portfolio Committee No.2 – Health and Community Services. October 2017. Retrieved 30 October 2020.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Eastern_Distributor&oldid=1209510026"

    Categories: 
    Highways in Sydney
    Tunnels in Sydney
    Toll roads in Australia
    Tunnels completed in 2000
    Highway 1 (Australia)
    Road tunnels in Australia
    Surry Hills, New South Wales
    Moore Park, New South Wales
    Kensington, New South Wales
    Woolloomooloo
    Darlinghurst, New South Wales
    Redfern, New South Wales
    Hidden categories: 
    Pages with non-numeric formatnum arguments
    All accuracy disputes
    Accuracy disputes from February 2024
    Webarchive template wayback links
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from January 2020
    Use Australian English from September 2015
    All Wikipedia articles written in Australian English
    Pages using gadget WikiMiniAtlas
    Pages using infobox Australian road with a mapframe parameter
    Articles containing potentially dated statements from January 2024
    All articles containing potentially dated statements
    WikiProject Australian Roads articles with a junction list using templates
    Commons category link is on Wikidata
    Official website not in Wikidata
     



    This page was last edited on 22 February 2024, at 07:12 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki