Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Project details  





2 Electricity production  





3 See also  





4 References  





5 External links  














San Isabel Solar Energy Center







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 37°2203N 104°2804W / 37.36750°N 104.46778°W / 37.36750; -104.46778
 

From Wikipedia, the free encyclopedia
 


San Isabel Solar Energy Center
A view of the project with the Spanish Peaks in the distance.
Map
CountryUnited States
LocationLas Animas County, Colorado
Coordinates37°22′03N 104°28′04W / 37.36750°N 104.46778°W / 37.36750; -104.46778
StatusOperational
Construction beganMarch 2016
Commission dateDecember 2016
Construction costUS$60 million
Owner(s)PSEG Solar Source
Operator(s)juwi O&M Group
Solar farm
TypeFlat-panel PV
single-axis tracking
Site area250 acres (101 ha)
Power generation
Nameplate capacity37.9 MWp, 30 MWAC
Capacity factor27.4 (average 2017-2019)
Annual net output72.0 GW·h, 288 MW·h/acre

The San Isabel Solar Energy Center is a 30 megawatt (MWAC) photovoltaic power stationinLas Animas County, Colorado located about 20 miles north of the city of Trinidad. The electricity is being sold to Tri-State Generation and Transmission (aka Tri-State) under a 25-year power purchase agreement.[1][2][3] It is the second solar project, following the Cimarron Solar Facility in year 2010, to be added to the utility cooperative's renewables portfolio.[4]

Project details[edit]

The facility occupies about 250 acres of semi-arid shortgrass prairie on the Colorado south-eastern plains, about 10 miles east of the base of the Rocky Mountains.[1] It uses 120,960 polycrystalline silicon panels (Model SN-72cell: rated 310 Wp, ~16% efficiency) that the manufacturer, S-Energy, claims are less susceptible to potential-induced degradation.[5][6] The panels are mounted in rows onto single-axis trackers to optimize electricity production throughout the day.[7]

The project was developed, constructed, and continues to be operated by Boulder-based juwi Inc., the U.S. subsidiary of the German renewable energy company juwi AG.[2][3][7] Construction began in March 2016 and employed about 400 workers, with Nesco serving as contractor for the civil structures.[8] Commercial operation began in December 2016, with a dedication ceremony on July 14, 2017.[9] The project was financed, and is owned by PSEG Solar Source, a subsidiary of New Jersey's Public Service Enterprise Group. The completed facility cost about US$60 million.[1]

On January 11, 2019 Tri-State and juwi announced their development plan for the 100 MW Spanish Peaks Solar Project, which would be sited adjacent to San Isabel Solar Energy Center. Under their plan, juwi will continue to develop the project and Tri-State would buy the electricity under a 15-year contract. A construction start is being targeted for year 2022, with completion in 2023. If funded, it may be the fourth solar project, following the Alta Luna Solar Facility in 2017, to be added to Tri-State's renewables portfolio.[10][4]

Electricity production[edit]

Generation (MW·h) of San Isabel [11]
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2016 4,287 4,287
2017 2,678 4,172 5,837 6,443 7,596 8,232 7,140 5,975 5,005 5,927 3,781 3,882 66,668
2018 4,262 5,251 7,453 7,157 7,785 8,406 7,710 7,526 6,795 4,630 4,398 4,044 75,417
2019 4,326 5,451 6,380 6,596 7,396 7,830 8,006 7,685 7,433 5,556 3,940 3,452 74,051
2020 4,553 4,415 7,081 7,437 8,465 7,871 7,489 7,738
Average Annual Production (years 2017-2019) : 72,045
Average Capacity Factor (years 2017-2019) : 27.4%

See also[edit]

  • iconRenewable energy portal
  • References[edit]

    1. ^ a b c "PSEG Acquires 37.8 MW Solar Project from juwi". pseg.com. March 21, 2016. Retrieved February 18, 2019.
  • ^ a b "Tri-State seals deal on solar farm in southern Colorado". Denver Post. September 1, 2015. Retrieved February 18, 2019.
  • ^ a b "Tri-State and juwi Announce Power Purchase Agreement for 30 Megawatt Solar Energy Project". electricenergyonline.com. September 1, 2015. Retrieved February 18, 2019.
  • ^ a b "Tri-State announces new 100-megawatt solar project in southern Colorado". Denver Post. January 11, 2019. Retrieved February 18, 2019.
  • ^ "S-Energy to Supply 74 MW of Solar Modules for Utility-Scale Projects in Colorado". prnewswire.com. May 11, 2016. Retrieved February 18, 2019.
  • ^ "S-Energy SN-72cell Standard Module". s-energy.com. Retrieved February 18, 2019.
  • ^ a b "juwi Portfolio - San Isabel". juwiamericas.com. Retrieved February 18, 2019.
  • ^ "Nesco Projects - San Isabel". nesco-us.com. Retrieved February 18, 2019.
  • ^ "San Isabel hosts grand opening of solar project". thechronicle-news.com. July 17, 2017. Retrieved February 18, 2019.
  • ^ "Tri-State and juwi announce 100-megawatt Spanish Peaks Solar Project". juwiamericas.com. Retrieved February 18, 2019.
  • ^ "Greater San Isabel, Monthly". Electricity Data Browser. Energy Information Administration. Retrieved February 18, 2019.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=San_Isabel_Solar_Energy_Center&oldid=1217291496"

    Categories: 
    Buildings and structures in Las Animas County, Colorado
    Photovoltaic power stations in Colorado
    Photovoltaic power stations in the United States
    Energy infrastructure completed in 2016
    Public Service Enterprise Group
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Solar power station articles using Infobox power station
    Pages using the Kartographer extension
     



    This page was last edited on 4 April 2024, at 23:34 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki