Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Roads and urban planning  







2 Numbering within a township  





3 Section subdivisions  





4 Measurement anomalies  





5 Alternatives and legacy systems  





6 See also  





7 References  





8 Further reading  














Section (United States land surveying)







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Section line)

Sectioning a township (36 sections).
Perfectly square 160-acre quarter sections of farmland cover central Indiana.
Satellite image of crops growing in southwest Kansas, mainly using center pivot irrigation. The primary grid pattern is of quarter sections (12 mi × 12 mi (800 m × 800 m)).

In U.S. land surveying under the Public Land Survey System (PLSS), a section is an area nominally one square mile (2.6 square kilometers), containing 640 acres (260 hectares), with 36 sections making up one survey township on a rectangular grid.[1]

The legal description of a tract of land under the PLSS includes the name of the state, name of the county, township number, range number, section number, and portion of a section. Sections are customarily surveyed into smaller squares by repeated halving and quartering. A quarter section is 160 acres (65 ha) and a "quarter-quarter section" is 40 acres (16 ha). In 1832 the smallest area of land that could be acquired was reduced to the 40-acre (16 ha) quarter-quarter section, and this size parcel became entrenched in American mythology. After the Civil War, freedmen (freed slaves) were reckoned to be self-sufficient with "40 acres and a mule." In the 20th century real estate developers preferred working with 40-acre (16 ha) parcels.[2] The phrases "front 40" and "back 40," referring to farm fields, indicate the front and back quarter-quarter sections of land.

One of the reasons for creating sections of 640 acres (260 ha) was the ease of dividing into halves and quarters while still maintaining a whole number of acres. A section can be halved seven times in this way, down to a 5-acre (2 ha) parcel, or half of a quarter-quarter-quarter section—an easily surveyed 50-square-chain (2 ha) area. This system was of great practical value on the American frontier, where surveyors often had a shaky grasp of mathematics and were required to work quickly.[2]

A description of a quarter-quarter section in standard abbreviated form, might look like "NW 1/4, NE 1/4, Sec. 34, T.3S, R.1W, 1st P.M." or, alternatively, "34-3-1 NW4NE4 1PM". In expanded form this would read:

The Northwest quarter of the Northeast quarter of Section 34 of Township 3 South, Range 1 West, first Principal Meridian.[3]

History

[edit]

The existence of section lines made property descriptions far more straightforward than the old metes and bounds system. The establishment of standard east-west and north-south lines ("township" and "range lines") meant that deeds could be written without regard to temporary terrain features such as trees, piles of rocks, fences, and the like, and be worded in the style such as "Lying and being in Township 4 North; Range 7 West; and being the northwest quadrant of the southwest quadrant of said section," an exact description in this case of 40 acres, as there are 640 acres (260 ha) in a square mile.

The importance of "sections" was greatly enhanced by the passage of "An Ordinance for ascertaining the mode of disposing of lands in the Western Territory" of 1785 by the U.S. Congress (see Land Ordinance of 1785). This law provided that lands outside the then-existing states could not be sold, otherwise distributed, or opened for settlement prior to being surveyed. The standard way of doing this was to divide the land into sections. An area six sections by six sections would define a township. Within this area, one section was designated as school land. As the entire parcel would not be necessary for the school and its grounds, the balance of it was to be sold, with the monies to go into the construction and upkeep of the school.

On May 20, 1862, President Abraham Lincoln signed into law the Homestead Act, by which settlers could "claim" 160 acres (a quarter section) of public land. Claimants were required to "live on" and “improve” their plot by cultivating the land. After five years, the original filer of the claim was entitled to the property, free and clear, except for a small registration fee.[4]

Roads and urban planning

[edit]

Numbering within a township

[edit]
Section map of Rock Creek Township, Saunders County, Nebraska (1907)

Every township is divided into 36 sections, each usually 1 mile (1.6 km) square. Sections are numbered boustrophedonically within townships[3] as follows (north at top):

6 5 4 3 2 1
7 8 9 10 11 12
18 17 16 15 14 13
19 20 21 22 23 24
30 29 28 27 26 25
31 32 33 34 35 36

Section subdivisions

[edit]

Sections can be divided into quarter sections of 160 acres (65 ha), named by intercardinal direction (northwest, northeast, etc.). For instance, the southwest quarter of a section is named SW 1/4.[5]

NW NE
SW SE

Sections can be further broken up into 40-acre (16 ha) blocks, or quarter-quarter sections. These add a second intercardinal direction label. For instance, the southeast quarter of the southwest quarter section mentioned above is labeled SE 1/4, SW 1/4:[5][6]

NWNW NENW NWNE NENE
SWNW SENW SWNE SENE
NWSW NESW NWSE NESE
SWSW SESW SWSE SESE

Measurement anomalies

[edit]

The curvature of the Earth makes it impossible to superimpose a regular grid on its surface, as the meridians converge toward the North Pole. As the U.S. is in the Northern Hemisphere, if a section's or township's east and west sides lie along meridians, its north side is shorter than its south side. As sections were surveyed from south and east to north and west, accumulated errors and distortions resulted on the north and west lines, and north and west sections diverge the most from the ideal shape and size.

The entire township grid shifts to account for the Earth's curvature. Where the grid is corrected, or where two grids based on different principal meridians meet, section shapes are irregular.

Sections also differ from the PLSS ideal of one square mile for other reasons, including errors and sloppy work by surveyors, poor instrumentation, and difficult terrain. In addition, the primary survey tool was the magnetic compass, which is influenced by local irregularities.

Once established, even an imperfect grid remains in force, mainly because the monuments of the original survey, when recovered, hold legal precedent over subsequent resurveys.[3]

Alternatives and legacy systems

[edit]

The Public Land Survey System was not the first to define and implement a survey grid. A number of similar systems were established, often using terms like section and township but not necessarily in the same way. For example, the lands of the Holland Purchase in western New York were surveyed into a township grid before the PLSS was established. In colonial New England land was often divided into squares called towns or townships, and further subdivided into parcels called lots or sections.[2]

Sections are also used in land descriptions in the portion of northwestern Georgia that was formerly part of the territory of the Cherokee Nation. They are not, however, part of the PLSS and are irregular in shape and size. See Cherokee County, Georgia for more information on the historical reasons for this.

Another exception to the usual use of sections and section numbering occurs when most of a parcel, or lot, falls under a body of water. The term "government lot" is used for such parcels and they are usually described separately from the rest of the section using single numbers (such as "Government Lot 5 of Section 15"). Also, parcels within a platted subdivision are often specified by lot number rather than using PLSS descriptions.[3]

Where Spanish land grants in Florida have descriptions that predate PLSS or even the U.S. itself, deviation from typical section numbering and size and shape often takes place. In an effort to honor these land grants after the U.S. took control of Florida, surveyors would use descriptions from confirmed land grants to establish their initial boundaries and created PLSS sections that extrapolated from those lines. Often, the amount of land left over in areas immediately surrounding the grants was grossly undersized or awkwardly shaped. Those tracts are referred to as "fractional sections" and often are not subject to township or range definitions. An example of such a legal description's beginning would read "Being a portion of Fractional Sec. 59, Township 0 South, Range 0 West".

Also, land north of the Watson Line near the Georgia border was not subject to the standard U.S. section, township and range designations, since the State of Georgia had claimed and laid out counties and surveyed its public lands south to that line into what eventually became part of the State of Florida. The exact location of the Georgia–Florida state line was ultimately confirmed by an Act of Congress, approved April 9, 1872.

See also

[edit]

References

[edit]
  1. ^ White, C. Albert (1983). A History of the Rectangular Survey System (PDF). Washington, D.C.: United States Bureau of Land Management.
  • ^ a b c Linklater, Andro (2002). Measuring America: How the United States Was Shaped By the Greatest Land Sale in History. Plume. pp. 72, 166, 234. ISBN 0-452-28459-7.
  • ^ a b c d Muehrcke, Phillip C.; Muehrcke, Juliana O.; Kimerling, A. Jon (2001). Map Use: Reading, Analysis, and Interpretation (4th ed.). JP Publications. pp. 234–239. ISBN 0-9602978-5-5.
  • ^ "Homestead Act (1862)". 29 July 2021.
  • ^ a b "Tutorial on the Public Land Survey System Descriptions" (PDF). Wisconsin Department of Natural Resources. Retrieved 2020-01-14.
  • ^ Murray, William Gordon (1969). Farm Appraisal and Valuation (5th ed.). Ames: Iowa State University Press. p. 53. ISBN 9780813805702. OCLC 246381719.
  • Further reading

    [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Section_(United_States_land_surveying)&oldid=1230478073"

    Categories: 
    Surveying of the United States
    Units of area
    Customary units of measurement in the United States
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
     



    This page was last edited on 22 June 2024, at 23:29 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki