Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 See also  





2 References  





3 External links  














Wind power in New Hampshire






Español
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Two turbines of Lempster Mountain wind farm
Wind power in New Hampshire is located in New Hampshire
Crotched Mountain

Crotched Mountain

Lempster Mtn
Granite
Groton
Jericho

Jericho

Antrim

Antrim

Wind power projectsinNew Hampshire
  Operating
  Under construction
  Decommissioned

Wind power in New Hampshire began in 1980, with the installation of the world's first wind farmatCrotched Mountain, consisting of 20 30 kW wind turbines, although it closed decades ago.[1] As of 2020, five wind power projects are operating in the state of New Hampshire – Lempster Mountain, which opened in 2008, Granite Reliable Wind Farm, which opened in late 2011, Groton Wind, which opened in 2012, Jericho Mountain, which opened in 2015, and Antrim Wind, which opened in 2020.

Granite Reliable has 33 Vestas three-megawatt wind turbines on mountains in the Phillips Brook area.[2][3][4]

Groton Wind consists of 24 Gamesa G87 2.0 MW turbines, and are located along two ridges west of Plymouth, in the town of Groton. Although there is a high voltage power line to the west of the wind farm, the power is transmitted to a new substation at the CamptonHolderness town line.[5][6] Turbines are 286 feet (87 m) tall and the blades are 139 feet (42 m) long.

A wind farm in Antrim opened in 2020.[7] It had been expected to begin construction in 2014, but on February 7, 2013, New Hampshire's Site Evaluation Committee rejected the proposal by a 6 to 3 vote, the first time the SEC has turned down a wind project.[8] The primary reason for the rejection was stated as the visual and aesthetic impact the proposed turbines would have had on the Audubon Society of New Hampshire's Willard Pond Sanctuary and the region in general. The project was eventually approved with 9 turbines, one fewer than originally proposed.

New Hampshire is a net power producer, generating more than is consumed. The output of Groton Wind is going to NStar, in Boston, and 55% of Granite is going to Vermont.[9] In 2010 New Hampshire produced 22 million MWh, and used 7.7 million MWh.[10]

A 2009 regulation requires state approval of any energy facility of over 30 MW, and transmission lines over 100 kV.[11]

Name Capacity
(MW)
Energy
(GW·hr/yr)
Location
(county)
Status
Lempster Mountain 24  70[12] Sullivan Operating
Granite 99[13] 224[14] Coos Operating[15]
Groton Wind 48 144-158[16] Grafton Operating[17][18][19]
Jericho Mountain 5 14 Coos Operating [20]
Antrim Wind 9 29 Sullivan Operating[21]
New Hampshire Wind Generation Capacity by Year
Megawatts of Wind Capacity [22]

See also

[edit]

References

[edit]
  • ^ Conaboy, Chelsea (September 17, 2008). "33 turbines would dot Coos ridges". Concord Monitor. Retrieved May 17, 2009.
  • ^ "Granite Reliable Power Windpark, NH". Our Windparks. Noble Environmental Power. Retrieved September 24, 2011.
  • ^ Department of Energy Finalizes $169 Million Loan Guarantee to Granite Reliable Power: A Wind Powering America Success Story
  • ^ Groton Wind Farm
  • ^ Electric service lines in Plymouth area being upgraded
  • ^ Ledger Transcript: "Antrim wind project complete"
  • ^ Antrim Wind Farm Gets Thumbs Down From SEC
  • ^ "Vermont utils to buy wind power from New Hampshire". Reuters. Archived from the original on April 25, 2019.
  • ^ Retail Sales of Electricity by State
  • ^ Energy Facility Evaluation, Siting, Construction and Operation
  • ^ Fleisher, Chris (October 11, 2009). "Lempster's big blow: One year later". The Keene Sentinel. Retrieved October 14, 2009.
  • ^ State to suspend action on wind farm application February 9, 2009, retrieved May 16, 2009
  • ^ "Granite Reliable". Loan Programs Office, DOE. Retrieved September 24, 2011.
  • ^ "Coos County Wind Project Would Create 550 Jobs, Contribute $40.6M to Economy" (Press release). University of New Hampshire (UNH). April 15, 2009. Retrieved September 24, 2011.
  • ^ Groton Wind
  • ^ Wind project gets deadline extension
  • ^ Wind farm makes presence known
  • ^ iberdrola renewables - groton wind
  • ^ "Jericho Mountain (USA) - Wind farms - Online access - the Wind Power".
  • ^ Ledger Transcript 2 Feb. 2020 "Andrim wind project complete"
  • ^ WINDExchange: U.S. Installed and Potential Wind Power Capacity and Generation
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Wind_power_in_New_Hampshire&oldid=1167759085"

    Category: 
    Wind power in New Hampshire
    Hidden categories: 
    Pages using the EasyTimeline extension
    Articles with short description
    Short description matches Wikidata
    Use mdy dates from February 2012
    Commons category link from Wikidata
     



    This page was last edited on 29 July 2023, at 18:24 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki