Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Buffalo Mountain  





2 TVA import  





3 Clean Line Energy transmission  





4 Statistics  





5 See also  





6 References  





7 External links  














Wind power in Tennessee







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Wind power in Tennessee has most potential in East Tennessee along the North Carolina border.[1] The state has not passed renewable portfolio standard legislation and there is just one utility-scale wind farm with 15 operating turbines[2] and previously 3 test turbines.[3] The Tennessee Valley Authority (TVA), based in Knoxville, imports wind-generated electricity into its service area which includes Tennessee. US Senator Lamar Alexander from Tennessee is an outspoken critic of wind power.[4]

2008 US Department of Energy wind power potential map of Tennessee

According to engineers at TVA none of the windmills is now generating power because of maintenance and mechanical issues.

Buffalo Mountain[edit]

TVA wind turbines on Buffalo Mountain

Located north of Oak Ridge and Oliver Springs, and east of Frozen Head State Park about thirty miles northwest of Knoxville, Buffalo Mountain Wind Farm was built in 2000 by the Tennessee Valley Authority (TVA).[citation needed]

Before expanding the wind plant at Buffalo Mountain, TVA proposed fourteen wind turbines on a ridge north of Beech Mountain, within 11 miles of the Appalachian Trail.[5]

Until 2009 the TVA operated three wind turbines with a combined generation capacity of 2 MW "as a test bed". TVA stopped operating the three turbines in 2009 due to maintenance issues. In 2021 TVA announced no access would be allowed in the area while it is removing the three original test wind turbines that  "reached their end of life."[3] It purchases the output of 15 wind turbines built in 2004 and owned by Invenergy that have a combined capacity of 27 MW.[6][7][8][9][10]

TVA import[edit]

The Tennessee Valley Authority service area covers most of Tennessee, portions of Alabama, Mississippi, and Kentucky, and small sections of Georgia, North Carolina, and Virginia. As of 2013, the agency had power purchased agreements with wind farms outside its service area:

A 2010 agreement with Iberdrola Renewables provides a potential 300MW future supply from Streator-Cayuga Ridge Wind Farm, Livingston County, Illinois [11]

Clean Line Energy transmission[edit]

Clean Line Energy LLC is proposing 700-mile power transmission line to bring wind energy from Oklahoma and to the Tennessee Valley. The TVA would import 1,750 megawatts, about half of the power that could be transmitted. Developers began in 2007 to seek regulatory approval for the $2 billion project, but the approvals needed to start construction aren't expected to be in place until at least 2020.[12][13][14][15][16] The project faces opposition, particularly in Arkansas.[17]

Statistics[edit]


See also[edit]

References[edit]

  1. ^ American Council On Renewable Energy (ACORE) (September 2012). "Renewable Energy in Tennessee" (PDF). Archived from the original (PDF) on 2013-04-20. Retrieved 2022-11-01.
  • ^ "State Renewable Portfolio Standards and Goals". National Association of State Legislatures. February 19, 2015. Retrieved 2 June 2015.
  • ^ a b "TVA: Buffalo Mountain wind farm access closed in November due to removal of turbines". wbir.com. November 2, 2021. Retrieved 2022-11-01.
  • ^ Paul C. Barton, Gannett Washington Bureau (26 March 2013). "Wind blowing against Alexander's energy arguments". USA TODAY.
  • ^ Leutze, Jay Erskine (2012-06-05). Stand Up That Mountain: The Battle to Save One Small Community in the Wilderness Along the Appalachian Trail. Simon and Schuster. ISBN 978-1-4516-7900-7.
  • ^ "Johnson City explores feasibility of Buffalo Mountain wind farm". Kingsport Times-News.
  • ^ "Buffalo Mountain Wind Farm TN USA - GEO". globalenergyobservatory.org.
  • ^ Jim Matheny, WBIR (28 October 2013). "Wind fuels steady rotation of power at TVA's Buffalo Mtn". WBIR.
  • ^ "CleanEnergy Footprints". cleanenergy.org.
  • ^ "NRDC: Renewable Energy in Tennessee". nrdc.org.
  • ^ "TVA: Energy Purchases from Wind Farms". tva.com.
  • ^ Tony Russell (2 February 2015). "New Transmission Lines To Carry Oklahoma Wind Energy To Tennessee - NewsOn6.com - Tulsa, OK - News, Weather, Video and Sports - KOTV.com -". newson6.com.
  • ^ "TVA may import wind power from Texas, Oklahoma". timesfreepress.com. Retrieved 1 June 2015.
  • ^ "TVA may import wind power from Texas, Oklahoma". timesfreepress.com.
  • ^ "Tennessee grants approval for 3.5GW wind transmission". windpowermonthly.com.
  • ^ "Tennessee Regulatory Authority approves utility status for Plains and Eastern Clean Line - Memphis Business Journal". Memphis Business Journal. 13 January 2015.
  • ^ "Bill Targets Clean Line, Contrasting With Trump's Zeal for Infrastructure". 7 March 2017. Archived from the original on 7 March 2017. Retrieved 9 March 2017.
  • ^ WINDExchange: U.S. Installed and Potential Wind Power Capacity and Generation
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Wind_power_in_Tennessee&oldid=1148535810"

    Category: 
    Wind power in Tennessee
    Hidden categories: 
    Pages using the EasyTimeline extension
    Articles with short description
    Short description matches Wikidata
    All articles with unsourced statements
    Articles with unsourced statements from November 2022
    Commons category link from Wikidata
     



    This page was last edited on 6 April 2023, at 19:25 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki