Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Background  





2 Pre-flight  





3 Mission and Results  





4 References  





5 External links  














Gemini 1: Difference between revisions






Afrikaans
Български
Català
Čeština
Dansk
Deutsch
Eesti
Español
فارسی
Français
Galego

Bahasa Indonesia
Italiano
עברית
Latviešu
Magyar
Bahasa Melayu
Nederlands

Norsk bokmål
Norsk nynorsk
Polski
Português
Русский
Suomi
Svenska
Türkçe

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




Print/export  







In other projects  



Wikimedia Commons
 
















Appearance
   

 





Help
 

From Wikipedia, the free encyclopedia
 


Browse history interactively
 Previous editNext edit 
Content deleted Content added
Should Cape Canaveral be referred to as Cape Kennedy in this article? I don't know.
Line 40: Line 40:

'''Gemini 1''' was the first flight of the Gemini spacecraft in [[NASA]]'s [[Gemini program]].<ref>{{Cite web|url=https://nssdc.gsfc.nasa.gov/nmc/spacecraftDisplay.do?id=1964-018A|title=Gemini 1|publisher=NASA Space Science Data Coordinated Archive|access-date=June 28, 2018}}</ref> An uncrewed test flight, its main objectives were to test the structural integrity of the new spacecraft and [[Titan II GLV|modified Titan II launch vehicle]]. It was also the first test of the new tracking and communication systems for the Gemini program and provided training for the ground support crews for the first manned missions.<ref>{{cite web|title=Gemini 1|url=http://space.skyrocket.de/doc_sdat/gemini-1.htm|publisher=Gunter's Space Page|date=December 11, 2017|accessdate=October 15, 2012}}</ref>

'''Gemini 1''' was the first flight of the Gemini spacecraft in [[NASA]]'s [[Gemini program]].<ref>{{Cite web|url=https://nssdc.gsfc.nasa.gov/nmc/spacecraftDisplay.do?id=1964-018A|title=Gemini 1|publisher=NASA Space Science Data Coordinated Archive|access-date=June 28, 2018}}</ref> An uncrewed test flight, its main objectives were to test the structural integrity of the new spacecraft and [[Titan II GLV|modified Titan II launch vehicle]]. It was also the first test of the new tracking and communication systems for the Gemini program and provided training for the ground support crews for the first manned missions.<ref>{{cite web|title=Gemini 1|url=http://space.skyrocket.de/doc_sdat/gemini-1.htm|publisher=Gunter's Space Page|date=December 11, 2017|accessdate=October 15, 2012}}</ref>



Gemini 1 was launched from Launch Complex 19 at Cape Canaveral, Florida on April 8, 1964. The spacecraft stayed attached to the second stage of the rocket. The mission lasted for three [[orbit]]s while test data were taken, but the spacecraft stayed in space for almost 64 orbits until its orbit decayed due to atmospheric drag. The spacecraft was not intended to be recovered; in fact, holes were drilled through its heat shield to ensure it would not survive re-entry.

Gemini 1 was launched from [[Launch Complex 19]]at[[Cape Canaveral Air Force Station|Cape Canaveral]], Florida on April 8, 1964. The spacecraft stayed attached to the second stage of the rocket. The mission lasted for three [[orbit]]s while test data were taken, but the spacecraft stayed in space for almost 64 orbits until its orbit decayed due to atmospheric drag. The spacecraft was not intended to be recovered; in fact, holes were drilled through its heat shield to ensure it would not survive re-entry.



== Background ==

== Background ==


Revision as of 13:58, 24 April 2019

Gemini 1
Launch of Gemini 1
Mission typeTest flight
OperatorNASA
COSPAR ID1964-018A Edit this at Wikidata
SATCAT no.782
Mission duration4 hours 50 minutes
Distance travelled2,789,864 kilometers (1,733,541 mi)
Orbits completed63
Spacecraft properties
SpacecraftGemini SC1
ManufacturerMcDonnell
Launch mass3,187 kilograms (7,026 lb)
5,170 kilograms (11,400 lb) (with 2nd stage)
Start of mission
Launch dateApril 8, 1964, 16:01:01.69 (1964-04-08UTC16:01:01Z) UTC
RocketTitan II GLV, s/n 62-12556
Launch siteCape Kennedy LC-19
End of mission
DisposalUncontrolled reentry
Decay dateApril 12, 1964, 15:00:00 (1964-04-12UTC16Z) UTC
Landing siteMiddle of South Atlantic Ocean
Orbital parameters
Reference systemGeocentric
RegimeLow Earth orbit
Perigee altitude155 kilometers (84 nmi)
Apogee altitude271 kilometers (146 nmi)
Inclination32.5 degrees
Period88.76 minutes
EpochApril 10, 1964[1]
Gemini 2 →
 

Gemini 1 was the first flight of the Gemini spacecraft in NASA's Gemini program.[2] An uncrewed test flight, its main objectives were to test the structural integrity of the new spacecraft and modified Titan II launch vehicle. It was also the first test of the new tracking and communication systems for the Gemini program and provided training for the ground support crews for the first manned missions.[3]

Gemini 1 was launched from Launch Complex 19atCape Canaveral, Florida on April 8, 1964. The spacecraft stayed attached to the second stage of the rocket. The mission lasted for three orbits while test data were taken, but the spacecraft stayed in space for almost 64 orbits until its orbit decayed due to atmospheric drag. The spacecraft was not intended to be recovered; in fact, holes were drilled through its heat shield to ensure it would not survive re-entry.

Background

Project Gemini was conceived as a bridge between America's single-seat Project Mercury and the three-seat Project Apollo. With a design largely extrapolated from its predecessor,[4]: 71  the Gemini spacecraft would allow two astronauts to conduct the maneuvers inherent in Apollo's lunar mission: rendezvous, docking, and changing of orbit. Moreover, Gemini would support astronauts in space for extended flights, approximating the expected length of the Apollo missions.[4]: 55–74 

Its two person capacity and greater capabilities meant that Gemini would be a substantially heavier spacecraft than Mercury had been — too heavy to be lofted into orbit by Mercury's Atlas rocket. A replacement was needed. The newly developed Titan II ICBM (which had also been tapped by the Air Force for its X-20 spaceplane project) was an attractive replacement. It had a thrust some two and a half times that of the Atlas, a far simpler mechanical construction, and the ability to store propellants indefinitely. Moreover, the Titan II's fuels mixed less violently than those of Atlas meaning a booster explosion, should it happen, would be less violent. This made obsolete the heavy escape tower used in the Mercury program; instead, ejection seats could be used.[4]: 41–42 

The primary goal of the first Gemini mission was to flight test the modified Titan II launch vehicle and the basic structural soundness of the Gemini capsule under launch and orbital conditions. As such, the first Gemini capsule could be a largely boilerplate structure.[4]: 181  Secondary goals of the mission included testing the remote guidance systems, the Titan's redundancy systems, and evaluation of the Gemini-Titan malfunction detection system.[5]

Pre-flight

Gemini Spacecraft Number 1 was built specifically for the uncrewed mission. Most internal systems were replaced with dummies and ballast approximating the weight and balance of the crewed spacecraft. In place of the crew couches, two sets of instrument pallets were installed for the relaying via telemetry of the pressure, vibration, acceleration, temperature, and structural loads experienced during the short flight. A spacecraft heat shield was installed, but four large holes were drilled in it to ensure Gemini 1 was destroyed during reentry.[4]: 181 

Even with the simplified systems, this first Gemini encountered several weeks of delay in testing. Nevertheless, it was not the spacecraft that caused the launch date, originally planned for December 1963, to slip. Rather, it was the testing and man-rating of the Titan II launch vehicle. Assembled on May 21, 1963, the first Titan-Gemini launch vehicle required comprehensive testing and retesting, and it was not until October that it was ready for transport to the launch site — where considerable preparation still had to be done.[4]: 185  Moreover, there was concern that the Titan II produced too much vertical oscillation (pogo) to be usable at all, and consideration was given to using the Saturn I rocket instead, at least for the first missions. However, on November 1, 1963, the Air Force flew a Titan II rocket with standpipes in its oxidizer lines and mechanical accumulators in its fuel lines, which suppressed the pogo effect.[6]

Inefficient project management threatened to further delay the first Gemini launch, which by November had already been pushed back to February 28, 1964. Gemini Manager Charles Mathews united the several disparate teams into a single Gemini Launch Vehicle Coordination Committee with clearly defined management and communication channels.[4]: 188  This measure ensured that no more time would be lost due to uncertain authority, duplicated effort, or conflicting decisions. Still, issues that arose during testing caused the launch date to slip further.[4]: 189  The Titan II booster was not ready for final readiness testing until March 3, 1964, the same day that Gemini Spacecraft Number 1 arrived at the launch complex for mating with its booster.[4]: 190  Faulty test equipment caused a further delay of two weeks. By late March, all serious hurdles cleared, Gemini 1's launch date was set for April 7.[4]: 195  The resolution of a failure in the secondary autopilot caused one last day of delay. Finally, by noon of the seventh, Gemini 1's Mission Review Board determined unanimously that all systems were cleared for flight.[4]: 197 

Mission and Results

After a flawless countdown, Gemini 1's Titan II booster lifted off from Cape Canaveral's Launch Complex 19[4]: 194  at 11:00:01 EDT, April 8, 1964.[4]: 197  The first stage was jettisoned after two and a half minutes with the rocket 64 kilometers high and 91 kilometers downrange. At that moment there was an unexpected three second loss of signal from the craft. It was later determined that this brief communications blackout was caused by charged ions from the separation and startup of the second stage, similar to the blackout during spacecraft reentry. All subsequent Gemini flights would have the same brief blackout.[7]

The spacecraft achieved orbit five and a half minutes after launch. The launch vehicle had imparted an excess 7 meters (24 feet) per second of velocity to the Gemini 1, placing the spacecraft into an orbit with an apogee of 320 kilometers (170 nmi) instead of the planned 299 kilometers (161 nmi). This lengthened Gemini 1's lifespan from the planned three and a half days to four.[4]: 199 

The formal mission of Gemini 1 was over long before that. Its battery had only been designed to last a single orbit,[8] and only the first three orbits, lasting four hours and 50 minutes later, were part of the flight plan. Gemini 1 and its attached second stage were tracked by the Manned Space Flight Network until they reentered over the South Atlantic, midway between South America and Africa, on April 12, 1964 during their 64th orbit.[4]: 199 

As a result of the successful flight, the Titan II was considered "man-rated" (safe for use in human spaceflight).[4]: 200  Man-rating the Gemini capsule, itself, would not be accomplished until the launch of Gemini 2, nine months later, on January 19, 1965.[4]: 209 

The Gemini 1 mission was supported by the following U.S. Department of Defense resources: 5,176 personnel, 11 aircraft and three ships.[4]: Appendix G-299 

References

Public Domain This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

  1. ^ McDowell, Jonathan. "SATCAT". Jonathan's Space Pages. Retrieved March 23, 2014.
  • ^ "Gemini 1". NASA Space Science Data Coordinated Archive. Retrieved June 28, 2018.
  • ^ "Gemini 1". Gunter's Space Page. December 11, 2017. Retrieved October 15, 2012.
  • ^ a b c d e f g h i j k l m n o p q r Hacker, Barton C.; Grimwood, James M. (February 2003) [First published 1977]. "Table of Contents". On the Shoulders of Titans: A History of Project Gemini. NASA History Series. Washington, D.C.: NASA. ISBN 9781493775910. NASA SP-4203. Retrieved March 11, 2019. {{cite book}}: |work= ignored (help); External link in |chapterurl= (help); Unknown parameter |chapterurl= ignored (|chapter-url= suggested) (help)
  • ^ "First Successful Gemini Mission Points to Manned Flight in 1964". Aviation Week and Space Technology. New York: McGraw Hill Publishing Company. April 13, 1964. Retrieved March 14, 2019.
  • ^ "Why Did NASA Choose an Untested Missile to Launch Gemini?". Popular Science. January 17, 2016. Retrieved March 15, 2019.
  • ^ Chris Kraft, Flight, p. 203.
  • ^ "Gemini Flight Readied". Aviation Week and Space Technology. New York: McGraw Hill Publishing Company. April 6, 1964. Retrieved April 8, 2019.
  • External links


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Gemini_1&oldid=893929747"

    Categories: 
    Spacecraft launched in 1964
    Project Gemini missions
    Spacecraft which reentered in 1964
    Spacecraft launched by Titan rockets
    April 1964 events
    Hidden categories: 
    CS1 errors: unsupported parameter
    CS1 errors: external links
    CS1 errors: periodical ignored
    Wikipedia articles incorporating text from NASA
    Commons category link from Wikidata
    Use American English from January 2014
    All Wikipedia articles written in American English
     



    This page was last edited on 24 April 2019, at 13:58 (UTC).

    This version of the page has been revised. Besides normal editing, the reason for revision may have been that this version contains factual inaccuracies, vandalism, or material not compatible with the Creative Commons Attribution-ShareAlike License.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki