Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 References  














Yandin Wind Farm







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




Print/export  



















Appearance
   

 






From Wikipedia, the free encyclopedia
 


This is an old revision of this page, as edited by WideEyedPupil (talk | contribs)at15:05, 18 August 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
(diff)  Previous revision | Latest revision (diff) | Newer revision  (diff)

Yandin Wind Farm
CountryAustralia
LocationDandaragan
StatusUnder construction
Construction beganJuly 2019
Owner(s)RATCH-Australia (70%)
Alinta Energy (30%)
Operator(s)Vestas
Wind farm
TypeOnshore
External links
Websitewww.yandinwindfarm.com.au

Yandin Wind Farm is an under construction wind power station in Dandaragan, Western Australia.

Construction commenced in July 2019. It will comprise 51 turbines with hub heights of 105m to maximise performance in the site’s specific wind conditions. The turbines are Vestas V150 variants with a 4.2 MW capacity and the total capacity of Yandin (214 MW) makes it the largest wind farm in Western Australia.[1][2]

Commissioning begun in July with up to 90 MW being exported onto the SWIS grid.[3] The wind farm full commissioning (completion and exporting to grid at full capacity) is expected to be in 2020.


References

  • ^ AEMO Live data dashboard

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Yandin_Wind_Farm&oldid=973670013"

    Categories: 
    Wind farms in Western Australia
    2020 establishments in Australia
    Hidden categories: 
    Wind farm articles using Infobox power station
    Western Australia articles missing geocoordinate data
    All articles needing coordinates
    Articles missing coordinates without coordinates on Wikidata
     



    This page was last edited on 18 August 2020, at 15:05 (UTC).

    This version of the page has been revised. Besides normal editing, the reason for revision may have been that this version contains factual inaccuracies, vandalism, or material not compatible with the Creative Commons Attribution-ShareAlike License.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki