Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Battery storage  





2 See also  





3 References  





4 External links  














Lake Bonney Wind Farm






Français
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 37°4536S 140°240E / 37.76000°S 140.40000°E / -37.76000; 140.40000
 

From Wikipedia, the free encyclopedia
 


Lake Bonney Wind Farm
Early morning at Lake Bonney wind farm
Map
CountryAustralia
LocationMillicent, South Australia
Coordinates37°45′36S 140°24′0″E / 37.76000°S 140.40000°E / -37.76000; 140.40000
StatusOperational
Commission dateMarch 2005 (2005-03)
Construction costA$700 million
Owner(s)Infigen Energy
Wind farm
TypeOnshore
Power generation
Units operational112
Make and modelVestas
Nameplate capacity278.5 MW
Capacity factor34%
Storage capacity52 MW·h
External links
Websitewww.infigenenergy.com/lake-bonney/
CommonsRelated media on Commons

Lake Bonney Wind Farm is a wind farm near Millicent, South Australia, Australia. The wind farm is south of, and contiguous with, Canunda Wind Farm. Both are built along the Woakwine Range - a line of stabilised sand dunes that once were coastal.

The project was built in three stages. Stage 1 comprises 46 turbines each having a rated capacity of 1.75 MW (total 80.5 MW) and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 comprises 53 turbines of 3 MW (total 159 MW). Stage 3 comprises 13 turbines of 3 MW of total 39 MW).[1] Stage 3 construction commenced in February 2009 and was commissioned in September 2009.[2]

The owner of the Lake Bonney Wind Farm is Infigen Energy, previously known as Babcock and Brown Wind Partners. Wind turbines are serviced under a post-warranty service agreement[3] by the turbine manufacturer Vestas.

Battery storage[edit]

It was announced in August 2018 that a battery storage power station would be added to the wind farm to provide firmer commitments to provide electricity, system security and ancillary services to the electricity grid. The project would cost A$38 million to install, including $5 million from the government of South Australia and $5 million from the Australian Renewable Energy Agency (ARENA). The battery is rated at 25 MW and 52 MW·h, and is connected to the Mayurra substation.[4] Like the similar Hornsdale Power Reserve, the battery will operate independently of the wind farm in the electricity market, and connect to the grid at the same point as the wind farm.[5] Construction of the battery was completed in May 2019,[6] and testing began in November 2019.[7] In 2020, its Frequency Control Ancillary Service (FCAS) earned $230,000 per MWh installed.[8]

See also[edit]

  • iconWeather portal
  • iconRenewable energy portal
  • References[edit]

  • ^ "Lake Bonney Wind Farm Stage 3". www.aurecongroup.com. Retrieved 5 September 2021.
  • ^ "INFIGEN EXECUTES POST-WARRANTY SERVICES AGREEMENTS WITH VESTAS" (PDF). Archived from the original (PDF) on 2 June 2012. Retrieved 22 January 2016.
  • ^ Washington, David (15 August 2018). "Another big battery to be built in SA". InDaily. Retrieved 15 August 2018.
  • ^ Moret, Glen (15 November 2018). "South Australia's $38 million Tesla battery site on track to charge in 2019, giving Infigen more opportunities". ABC South East SA. Retrieved 25 January 2019.
  • ^ "Lake Bonney Battery Energy Storage System". Infigen Energy. Retrieved 30 August 2019.
  • ^ Parkinson, Giles (5 November 2019). "Lake Bonney battery charges up for first time in South Australia". RenewEconomy.
  • ^ Parkinson, Giles (23 February 2021). "Dalrymple big battery delivers biggest bang for megawatt hour of storage". RenewEconomy.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Lake_Bonney_Wind_Farm&oldid=1139509492"

    Categories: 
    Wind farms in South Australia
    Limestone Coast
    Electric power infrastructure in South Australia
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Pages with non-numeric formatnum arguments
    Use dmy dates from January 2015
    Use Australian English from January 2015
    All Wikipedia articles written in Australian English
    Coordinates on Wikidata
    Wind farm articles using Infobox power station
    Pages using the Kartographer extension
     



    This page was last edited on 15 February 2023, at 14:21 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki