Moorabool Wind Farm | |
---|---|
Country |
|
Location | |
Coordinates | 37°42′S 144°12′E / 37.7°S 144.2°E / -37.7; 144.2 |
Status | Operational |
Construction began |
|
Commission date | 2022 |
Owner(s) | |
Wind farm | |
Type | |
Power generation | |
Nameplate capacity |
|
External links | |
Website | mooraboolwindfarm |
Moorabool Wind Farm is an operational wind farm located 25 km southeast of BallaratinVictoria, Australia. The wind farm is in two parts: the northern part has 50 turbines, and the southern part has 54 turbines.[1] By December 2021, all 104 turbines had been put into place. The turbines each measure 169 m to the tip of the blade.
The farm is being developed by Goldwind Australia.[2] When operational, it will be one of three wind farms in Moorabool Shire. The others are Yaloak South Wind Farm and Lal Lal Wind Farm.[3]
When fully operational, the farm will produce up to 312MW of electricity, enough energy to power approximately 228,000 Victorian homes.[4]
The components for the southern section were delivered from the Port of Geelong in a total of 594 oversized loads at a rate of approximately 33 per week from September 2019 to February 2020.[5]
The wind farm commenced partial operation in late 2020. Commissioning was completed in 2022.[2]
| |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Coal-fired power stations |
| ||||||||||
Gas-fired power stations |
| ||||||||||
Hydroelectric |
| ||||||||||
Wind farms (List) |
| ||||||||||
Solar concentrator |
| ||||||||||
Solar photovoltaic |
| ||||||||||
Cogeneration |
| ||||||||||
Geothermal |
| ||||||||||
Storage |
| ||||||||||
Distributors |
| ||||||||||
Retailers |
| ||||||||||
Generators |
| ||||||||||
Regulators |
| ||||||||||
Historical |
| ||||||||||