Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 References  














Bulgana Green Power Hub







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 37°0551S 142°5825E / 37.097439°S 142.973608°E / -37.097439; 142.973608
 

From Wikipedia, the free encyclopedia
 


Bulgana Green Power Hub
Map
Country
  • Australia
Coordinates37°05′51S 142°58′25E / 37.097439°S 142.973608°E / -37.097439; 142.973608
StatusUnder construction
Construction began
  • May 2018
Construction cost
  • 350 million A$
Owner(s)
Wind farm
Type
Power generation
Units operational56 × 3.4 MW
Make and modelSiemens Gamesa SG 3.4-132 (56)
Nameplate capacity
  • 194 MW
Storage capacity
  • 34 MW h
External links
Websitebulganagreenpowerhub.com.au

Bulgana Green Power Hub is a wind farm north of Stawell in the Australian state of Victoria. The project is owned by Neoen. Construction of the 56 wind turbines, with a total generation capacity of 194MW, was completed in August 2019,[1][2] and connections to the national grid reached full capacity in 2021.[3]

90% of the energy is contracted for supply to the Government of Victoria.[4] The EPC contract and 25 years of maintenance is with Siemens Gamesa Renewable Energy.

References

[edit]
  1. ^ Gartlan, JessieAnne (19 August 2019). "All 56 wind turbines have been installed at the Landsborough site". Ararat Advertiser. Retrieved 12 November 2019.
  • ^ Williams, Lachlan (13 February 2019). "First wind turbine installed at Bulgana Green Power Hub". Stawell Times-News. Retrieved 12 November 2019.
  • ^ Paul, Sonali (29 December 2021). "Neoen says Australian wind farm hits full tilt, two years behind plan". Reuters. Retrieved 29 January 2022 – via www.reuters.com.
  • ^ "Bulgana signs MoU with Victorian Government". Neoen. 27 June 2017. Retrieved 12 November 2019.

  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Bulgana_Green_Power_Hub&oldid=1153515279"

    Categories: 
    Victoria (state) stubs
    Wind farms in Victoria (state)
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Use Australian English from November 2019
    All Wikipedia articles written in Australian English
    Use dmy dates from November 2019
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Wind farm articles using Infobox power station
    All stub articles
    Pages using the Kartographer extension
     



    This page was last edited on 6 May 2023, at 21:53 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki