Batang-Semarang Toll Road | |
---|---|
![]()
Kalikuto Bridge on Batang–Semarang Toll Road
| |
Route information | |
Part of ![]() | |
Maintained by PT Jasamarga Semarang Batang (PT Jasa Marga Tbk and PT Waskita Toll Road (Waskita Karya)) | |
Length | 75 km (47 mi) |
Existed | 2018–present |
Major junctions | |
West end | Batang |
Major intersections |
|
East end | Semarang |
Location | |
Country | Indonesia |
Major cities |
|
Highway system | |
Batang-Semarang Toll Road is a 75 kilometers long highway that connects Batang area with Semarang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect MeraktoBanyuwangi of the island of Java.[1] The toll road is operational since 2018.[2]
Until November 2017, its construction progress is at 55.7 percent.[3][4] The construction of this toll road is divided into 5 sections:
Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
Central Java | Kandeman, Batang Regency | 0 | 0.0 | 348 | Kandeman Toll Gate |
![]() | Western terminus |
Gringsing, Batang Regency | 23.96 | 14.89 | 371 | Gringsing Toll Gate |
| ||
Weleri, Kendal Regency | 36.10 | 22.43 | 384 | Weleri Toll Gate |
| ||
Pegandon, Kendal Regency | 47.04 | 29.23 | 395 | Kendal Toll Gate |
| ||
Kaliwungu, Kendal Regency | 60.40 | 37.53 | 409 | Kaliwungu Toll Gate |
| ||
Ngaliyan, Semarang | 64.88 | 40.31 | Kalikangkung Toll Gate (Main toll gate) | ||||
71.30 | 44.30 | 419 | Krapyak Interchange |
![]() ![]() | Eastern terminus, Eastern end of ![]() ![]() | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
| |
---|---|
Sumatra |
|
Java |
|
Lesser Sunda Islands |
|
Kalimantan |
|
Sulawesi |
|
under construction |
|
planned |
|