Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Location  





2 Overview  





3 Funding  





4 Other considerations  





5 See also  





6 References  





7 External links  














Garob Wind Power Station







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 29°5743S 22°2444E / 29.96194°S 22.41222°E / -29.96194; 22.41222
 

From Wikipedia, the free encyclopedia
 


Garob Wind Power Station
Map
CountrySouth Africa
LocationCopperton, Siyathemba Local Municipality, Karoo Region
Northern Cape Province
Coordinates29°57′43S 22°24′44E / 29.96194°S 22.41222°E / -29.96194; 22.41222
StatusOperational
Construction beganApril 2019
Commission dateDecember 2022
Construction cost€200+ million (US$225.7 million)
Owner(s)Enel SpA
Operator(s)Nordex
Wind farm
TypeOnshore
Power generation
Units operational46
Make and modelNordex
Nameplate capacity145 MW
Annual net output573 GWh
External links
WebsiteHomepage

The Garob Wind Power Station is an operational 145 MW (194,000 hp) wind power plant in South Africa. The power station was developed and is owned by Enel, the Italian manufacturer and distributor of electricity and gas infrastructure, through its subsidiary Enel Green Power of South Africa (EGPRSA). Construction of this wind farm started in April 2019 and achieved commercial operation in December 2021. The energy generated at this wind farm is sold to the South African national electricity utility company Eskom, under a 20-year power purchase agreement (PPA).[1][2]

Location

[edit]

The power station is located near the former mining town of Copperton, in Siyathemba Local Municipality, in the Karoo Region, in Northern Cape Province. This is approximately 233 kilometres (145 mi), by road, northwest of De Aar, the district headquarters of Pixley ka Seme District Municipality, where the power station is located.[3] Copperton is located about 288 kilometres (179 mi), by road, southwest of Kimberley, the capital city of Northern Cape Province.[4]

Overview

[edit]

The concession for this wind farm was awarded to Enel in 2015, as part of the fourth round of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), of the Republic of South Africa. Enel signed a 20-year power purchase agreement with Eskom.[1]

During construction, the pylons that support the wind turbines were manufactured on-site, out of concrete and cement, instead of metal as is the usual method. This provided business for local suppliers and contractors.[1] Nordex, the European supplier of the wind turbines, operates and maintains the power station on behalf of the owners.[2]

Funding

[edit]

Funding for this renewable energy infrastructure was sourced from two South African financial houses, namely Absa Group and Nedbank. The total cost of construction is reported to be in excess of €200 million (approx. US$225.7 million).[2]

Other considerations

[edit]

It is calculated that the wind farm adds 573GWh to the South African national grid every year. This power station saves the country the emission of 600,000 tons of CO2 annually. At the peak of construction an estimated 511 people were employed at the site. This is the 10th renewable power station developed by Enel, under the South African REIPPP program. The list of those power stations, with installed capacity exceeding 800 megawatts, is listed in references 1 and 2 below.[1][2]

See also

[edit]

  • iconRenewable energy portal
  • References

    [edit]
    1. ^ a b c d Enel Green Power (4 December 2021). "Garob wind farm ready for commercial operation". Enel Green Power. Retrieved 10 February 2022.
  • ^ a b c d Jean Marie Takouleu (13 December 2021). "South Africa: Enel commissions its 145 MW Garob wind farm". Afrik21.africa. Paris, France. Retrieved 10 February 2022.
  • ^ Google (10 February 2022). "Road Distance Between De Aar, South Africa And Copperton, South Africa" (Map). Google Maps. Google. Retrieved 10 February 2022.
  • ^ Google (10 February 2022). "Road Distance Between Kimberly, South Arica And Copperton, South Africa" (Map). Google Maps. Google. Retrieved 10 February 2022.
  • [edit]



    Retrieved from "https://en.wikipedia.org/w/index.php?title=Garob_Wind_Power_Station&oldid=1179594299"

    Categories: 
    Economy of the Northern Cape
    Wind farms in South Africa
    Energy infrastructure in Africa
    2021 establishments in South Africa
    Energy infrastructure completed in 2021
    21st-century architecture in South Africa
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    EngvarB from February 2022
    Use dmy dates from February 2022
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Wind farm articles using Infobox power station
    Pages using the Kartographer extension
     



    This page was last edited on 11 October 2023, at 04:26 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki