Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 Power generation  





3 Underground coal gasification  





4 Silo Collapse  





5 Coal Supplying  





6 Crime  





7 See also  





8 References  





9 External links  














Majuba Power Station






Afrikaans
Български
Deutsch
Français
Norsk bokmål
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 27°62S 29°4617E / 27.10056°S 29.77139°E / -27.10056; 29.77139
 

From Wikipedia, the free encyclopedia
 


Majuba Power Station
Map
Location of Majuba Power Station in South Africa
CountrySouth Africa
LocationMpumalanga
Coordinates27°6′2S 29°46′17E / 27.10056°S 29.77139°E / -27.10056; 29.77139
StatusOperational
Construction began1983
Commission date1996
Owner(s)
Operator(s)Eskom
Thermal power station
Primary fuelCoal
Secondary fuelSyngas
Power generation
Units operational3 X 665 MW
3 X 716 MW
Nameplate capacity4,110 MW

Majuba Power Station between Volksrust and AmersfoortinMpumalanga, South Africa, is a coal-fired power plant operated by Eskom. Majuba is Eskom's only power station that is not linked to a specific mine and it receives its coal from various sources. This was due to an error in geotechnical engineering core drilling which did not identify that the proposed local coal mine was under solid bedrock.

History

[edit]

Construction started in September 1983 and by April 1996 the first unit was connected to the grid. The last unit was commissioned in April 2001.[1]

Power generation

[edit]

Majuba has three 665 MW dry-cooled units and three 716 MW wet-cooled units with a total installed capacity of 4,110MW with a turbine Maximum Continuous Rating of 35.3% on the dry-cooled turbines and 37.7% on the wet-cooled units.[2]

Underground coal gasification

[edit]

In addition to coal, the Majuba Power Station is fired by syngas produced by underground coal gasification at the nearby Majuba demonstration facility on the Majuba coalfield. The 3,000–5,000 cubic metres per hour (110,000–180,000 cu ft/h) pilot plant was commissioned in January 2007 and the first electricity was generated from the underground coal gasification gas on 31 May 2007. Produced syngas is transported from the facility to the power station by 7-kilometre (4.3 mi) pipeline with a diameter of 600 millimetres (24 in). There is a plan to build a 1,200 MW commercial generation facility.[3][4][5]

Silo Collapse

[edit]

On 1 November 2014, the plant was running under normal load when a visible crack was reported on Silo 20 by a member of the operating staff at approximately 12:30. Personnel in the area were subsequently evacuated. At 13:20, the silo collapsed and the plant's output was immediately reduced from 3600MW to 1800MW. Shortly after, the output was reduced further to 600MW.[6]

Coal Supplying

[edit]

Majuba requires 14 million tonnes (14 Mtpa) of coal per annum which were originally supposed to come from a colliery built and operated by Rand Mines but that mine was decommissioned in 1993. An 8 Mtpa rail link branch from Palmfort was commissioned and, by 1996, was sufficient for the power plant owing to the delayed construction schedule. From 2003 Eskom implemented a policy of procuring coal from new emerging sources which resulted in delivery by road, since the location of the mines precluded their use of the Palmfort line, despite the fact that it was sufficient for Majuba's needs.[7]

In early 2000 Majuba started increasing its coal consumption by 2.2 Mtpa to a target of 14 Mtpa by 2010, based on forecasts of electricity demand growth. To accommodate this a 68 km rail line from Ermelo to Majuba was planned which would link up to the heavy haul export rail line from MpumalangatoRichards Bay. The project was approved by the Eskom board in December 2004 with a cost-to-completion of R1,5-billion. The project ran several years late and was expected to be completed by March 2021 at a cost-to-completion of R8-billion.[7]

In addition, in December 2019 a coal tippler takeout conveyor caught fire at Majuba and since then all coal deliveries by rail had ceased.[7]

Crime

[edit]

Mid-December 2022, at the request of the Minister of Public Enterprises, Pravin Gordhan, and President Cyril Ramaphosa, Minister of Defence Thandi Modise deployed a small contingent of SANDF troops at the station (besides at Camden, Grootvlei and Tutuka) due to a growing threat of sabotage, theft, vandalism and corruption.[8]

See also

[edit]

References

[edit]
  1. ^ Yelland, Chris (31 August 2020). "Eskom's Majuba power station rail project debacle". EE Business Intelligence (Pty) Ltd. Retrieved 3 September 2020.
  • ^ "MAJUBA POWER STATION". Eskom. Retrieved 2 November 2014.
  • ^ "ESKOM's underground coal gasification project" (PDF). European Commission. 2008-05-05. Retrieved 2011-09-04.[permanent dead link]
  • ^ Venter, Irma (2007-02-12). "Coal experts search for ways to cut emissions". Mining Weekly. Creamer Media. Retrieved 2011-09-04.
  • ^ Hannah, Jessica (2011-08-12). "Coal gasification demo plant design study under way". Mining Weekly. Creamer Media. Retrieved 2011-09-04.
  • ^ "Media Briefing - Damage to Majuba power station coal storage silo" (PDF). Eskom.co.za. Retrieved 15 January 2015.
  • ^ a b c Yelland, Chris (31 August 2020). "OP-ED: Eskom's Majuba power station rail project is a debacle". Daily Maverick. Retrieved 3 September 2020.
  • ^ Evans, Julia (4 January 2023). "A country 'ungovernable' — how Eskom plans to tackle the scourge of sabotage, fraud and corruption in 2023". Defend Truth. www.dailymaverick.co.za. Daily Maverick. Retrieved 6 January 2023.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Majuba_Power_Station&oldid=1208390492"

    Categories: 
    Coal-fired power stations in South Africa
    Towers in South Africa
    Buildings and structures in Mpumalanga
    Economy of Mpumalanga
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    All articles with dead external links
    Articles with dead external links from January 2018
    Articles with permanently dead external links
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Thermal power station articles using Infobox power station
    Pages using the Kartographer extension
     



    This page was last edited on 17 February 2024, at 09:08 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki