Gulou Dajie
鼓楼大街 | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() | ||||||||||||||||
General information | ||||||||||||||||
Location | Xicheng District / Dongcheng District border, Beijing China | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
Line(s) |
| |||||||||||||||
Platforms | 4 (2island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Station code | 217 (Line 2) | |||||||||||||||
History | ||||||||||||||||
Opened | September 20, 1984; 39 years ago (1984-09-20) (Line 2) December 30, 2012; 11 years ago (2012-12-30) (Line 8) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Gulou Dajie Station[1] (simplified Chinese: 鼓楼大街站; traditional Chinese: 鼓樓大街站; pinyin: Gǔlóudàjiē Zhàn; lit. 'Gulou Street') is a stationonLine 2 and Line 8 of the Beijing Subway.[2] The connection to line 8 opened on December 30, 2012.[3]
Both the line 2 and 8 stations have underground island platforms.
There are 6 exits, lettered A1, A2, B, E, F, and G. Exit B is accessible.
| |
---|---|
Line 2 |
|
Line 8 |
|
Stations that are proposed, under planning or under construction are shown in italics. |
39°56′56″N 116°23′38″E / 39.9490°N 116.3938°E / 39.9490; 116.3938
This article related to the Beijing Subway is a stub. You can help Wikipedia by expanding it. |