Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 Lines  



2.1  Orange Line  





2.2  Blue Line  





2.3  Purple Line  







3 Network map  





4 Stations  





5 Rolling stock  





6 Track  





7 Depot  





8 See also  





9 References  





10 Further reading  





11 External links  














Lahore Metro






تۆرکجه

Català
Esperanto
Français
ि
Bahasa Indonesia
Italiano
Кыргызча
پنجابی
Polski
Português
Русский
Suomi
Türkçe
Українська
اردو

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Lahore Metro
Train of the Orange Line at a station.
Train of the Orange Line at a station.
Overview
OwnerGovernment of Punjab
LocaleLahore, Punjab, Pakistan
Transit typeRapid transit
Number of lines1 completed (2 planned)
Number of stations26
Annual ridership20 million (2020-2021)[1]
Operation
Began operation25 October 2020; 3 years ago (2020-10-25)
Operator(s)Punjab Mass Transit Authority, Guangzhou Metro
Technical
System length27.1 km (16.8 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
System map

Lahore Metro is an automated rapid transit system in Lahore, Punjab, Pakistan and the first driverless metro in Pakistan. Three metro lines have been proposed, of which the Orange Line is operational. It is also Pakistan's first metro line system.

History

[edit]

The Lahore Metro was first proposed in 1991 and reviewed in 1993 by the Lahore Traffic & Transport Studies, funded by the World Bank. The project was subsequently shelved.[2] In 2005, the Ministry of Transport revisited the project and carried out a feasibility study. In 2007, the Asian Development Bank provided Rs. 1 billion (US$3.5 million) to conduct a study on the project.[3] The initial plan called for an 82 km (51 mi) rail network with 60 stations to be constructed in four separate phases. The first phase involved the construction of a 27 km (17 mi) rail line between Gajju Matta and Shahdara Bagh, with an 11.6 km (7.2 mi) section underground. Construction was expected to start in 2008 and be completed by 2010.[3] However, in 2008, the project was shelved again as priorities shifted to other projects.[4]

In June 2010, Malaysia-based Scomi International proposed a US$1.15 billion monorail alternative, but that was not approved.[3] At a ceremony in May 2014, an agreement was signed by Chief Minister Punjab Shahbaz Sharif, alongside President Mamnoon Hussain and Chinese Communist Party general secretary Xi Jinping, which gave the go-ahead for the construction of the Orange Line. The project was estimated to cost $1.6 billion.[5]

Lines

[edit]

Orange Line

[edit]

The Orange Line has a length of 27.1 kilometres (16.8 mi) and became operational on 25 October 2020.[6]

Blue Line

[edit]

The Blue Line is a proposed 24-kilometre (15 mi) line from Chauburji to College Road, Township.[citation needed]

Purple Line

[edit]

The Purple Line is a proposed 32-kilometre (20 mi) airport rail link.[citation needed]

Network map

[edit]

Map


Stations

[edit]

The line has 26 stations. Anarkali and Central stations are underground, while the remaining 24 are elevated.[7] The rail line runs through the centre of each station, with platforms flanking the track.[8] Elevated stations have a width of 22.5 metres, while Anarkali Station is 16 metres wide, and Central Station 49.5 metres wide.[9] Elevated stations are all 102 metres long, while Anarkali and Central Stations are 121.5 and 161.6 metres long, respectively.[10]

Anarkali and Central Stations were initially planned to have two underground levels,[11] Anarkali Station now both feature a ground-level concourse with one underground level, while Central Station has a single underground level, in order reduce the maximum gradient for trains from 35% to 30%.[12] Rail tracks are 9.7m below street level at Central Station, and 8.7m below street level at Anarkali Station.[13]

Underground stations feature automated doors between platforms and trains. Public areas of the station are air-conditioned during warm months.[14] Elevated stations feature natural ventilation throughout the platforms, with localised air conditioning in public areas of the ticket-hall level.[15]

Rolling stock

[edit]

Orange Line trains are each composed of five wagons manufactured by China's CRRC Zhuzhou Locomotive,[16] and automated and driverless.[17] A standard Chinese "Type B" train-set consisting of 5 cars with 4 doors each used,[18] that has a stainless steel body and illuminated by LED lighting.[19] Each car has a nominal capacity of 200 seated and standing passengers at an average density of 5 persons per square metre with 20% of passengers seated and 80% standing.[20] A total of 27 trains with 135 cars have been ordered for the system,[21] at a cost of $1 billion.[22] A total of 54 trains are expected to be in service by 2025.[22] The train is powered by a 750-volt third rail.[23][22]

Track

[edit]
Orange Line Metro rail pillar

The Orange Line's tracks meet China's national standards,[24] and employ jointless track circuits.[25] Mainline track is capable of supporting 60 kg/m, while track in the depot and storage yards is capable of supporting 50 kg/m.[26] Track was laid upon a monolithic concrete track bed, with crossovers located between every 2 to 3 stations.[27] Double turnover tracks are used at each terminus for turnaround.[28] Track is standard gauge at 1435mm.[29] Fasteners between tracks are elastic.[30]

Depot

[edit]

A depot was constructed at the northeast portion of the line, directly east of the Lahore Ring Road,[31] while a stabling yard was constructed at the line's southern terminus at Ali Town.[32] The depot is also the site of the Orange Line's central control centre.[33] The depot and stabling yard respectively required 0.56 and 0.49 kilometres of track.[34]

See also

[edit]

References

[edit]
  1. ^ "Orange Line Metro Train marks its 1st anniversary with a milestone of 20 million riders". Daily Pakistan. Retrieved 2022-01-26.
  • ^ Asian Development Bank 2008, p. 2.
  • ^ a b c The Express Tribune 2011.
  • ^ Asian Development Bank 2009.
  • ^ Daily Times 2011.
  • ^ "Punjab CM inaugurates Lahore's much-delayed Orange Line Metro Train". Daily Pakistan. 25 Oct 2020. Retrieved 2020-10-25.
  • ^ "Good news on track: Lahore to get Pakistan’s first metro train", Express Tribune, Lahore, 23 Mar 2014. Retrieved on 20 October 2014.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 12. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "SECTION - 3 DESCRIPTION OF THE PROJECT" (PDF). EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran). Environmental Protection Department. Retrieved 25 January 2017.
  • ^ "SECTION - 3 DESCRIPTION OF THE PROJECT" (PDF). EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran). Environmental Protection Department. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 7. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 9. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 69. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "SECTION - 3 DESCRIPTION OF THE PROJECT" (PDF). EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran). Environmental Protection Department. pp. 3–10. Retrieved 25 January 2017.
  • ^ "SECTION - 3 DESCRIPTION OF THE PROJECT" (PDF). EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran). Environmental Protection Department. pp. 3–10. Retrieved 25 January 2017.
  • ^ "Short Cuts". The Ec was onomist. 17 March 2016. Retrieved 24 January 2017.
  • ^ "Manufacturing of orange trains starts, says Kh Hassan". The News. 26 May 2016. Retrieved 24 January 2017. Latest technology will be employed for fabricating these trains and the rolling-stock will be fully computerised, automatic and driverless.
  • ^ "SECTION - 3 DESCRIPTION OF THE PROJECT" (PDF). EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran). Environmental Protection Department. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 36. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 35. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "Manufacturing of orange trains starts, says Kh Hassan". The News. 26 May 2016. Retrieved 24 January 2017.
  • ^ a b c "27 trains to be acquired for Metro project". Pakistan Today. 5 February 2016. Retrieved 24 January 2017.
  • ^ "Orange train to run on 750 volts". Dawn. 18 January 2016. Retrieved 25 January 2017.
  • ^ "SECTION - 3 DESCRIPTION OF THE PROJECT" (PDF). EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran). Environmental Protection Department. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 143. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "SECTION - 3 DESCRIPTION OF THE PROJECT" (PDF). EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran). Environmental Protection Department. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 27. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 28. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 33. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "SECTION - 3 DESCRIPTION OF THE PROJECT" (PDF). EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran). Environmental Protection Department. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • ^ "Norinco Technical Proposal" (PDF). January 2016. p. 12. Archived from the original (PDF) on February 2, 2017. Retrieved 25 January 2017.
  • "Lapse of Validity of Loan Approval" (PDF), Asian Development Bank Documents, Asian Development Bank, retrieved 18 January 2013
  • Punjab project: Lahore rapid transit scheme being revived, The Express Tribune, retrieved 18 January 2013
  • LRMT fares for 2011, Daily Times, retrieved 18 January 2013
  • Morichi, Shigeru (2013), Transport Development in Asian Megacities, Springer, ISBN 978-3-642-29743-4
  • Further reading

    [edit]
    [edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Lahore_Metro&oldid=1233246586"

    Categories: 
    Lahore Metro
    Lahore
    Transport in Lahore
    Modes of transport in Lahore
    Rail infrastructure in Lahore
    Electric railways in Pakistan
    Transport in Pakistan
    2020 establishments in Pakistan
    Public transport in Asia
    Railway lines opened in 2020
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Use Pakistani English from September 2021
    All Wikipedia articles written in Pakistani English
    All articles with unsourced statements
    Articles with unsourced statements from June 2023
    Commons category link is on Wikidata
    Lahore articles missing geocoordinate data
    All articles needing coordinates
    Articles missing coordinates with coordinates on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 8 July 2024, at 02:15 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki