Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 Project details  



2.1  Environmental impact  





2.2  Economic impact  







3 See also  





4 References  





5 External links  














Hoosac Wind Power Project







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 42°4347N 73°125W / 42.72972°N 73.02361°W / 42.72972; -73.02361
 

From Wikipedia, the free encyclopedia
 


Hoosac Wind Power Project
Map
CountryUnited States
LocationBerkshire County, Massachusetts
Coordinates42°43′47N 73°1′25W / 42.72972°N 73.02361°W / 42.72972; -73.02361
StatusOperational
Construction beganAugust, 2011
Commission dateDecember, 2012
Construction costUS$90 million
Owner(s)Iberdola Renewables
Wind farm
TypeOnshore
Hub height213 feet (65 m)
Rotor diameter252 feet (77 m)
Site area75 acres
Site elevation2,700 feet (820 m)
Power generation
Units operational19
Make and modelGE Wind Energy: 1.5 MW
Nameplate capacity28.5 MW
Annual net output7,000 MWh
External links
Websiteiberdrolarenewables.us/cs_hoosac.html

[edit on Wikidata]


[1][2]

Hoosac Wind Power Project is a wind farmonCrum HillinMonroe, Massachusetts and on Bakke Mountain in Florida, Massachusetts. Owned and operated by Iberdrola Renewables, it is the largest wind farm in Massachusetts, with 19 GE 1.5 MW wind turbines and a total installed capacity of 28.5 MW. The Hoosac Wind power project became fully operational in 2012 and provides enough electricity to power 10,000 homes annually.[3]

History

[edit]

In 1980, during a Bakke Mountain hike, the Bakke family noticed the region was quite breezy. The sparse tree growth was misshapen and deformed by the strong winds. Hans Bakke began to consider the possibility of wind energy at the site. EnXco, the wind-energy company and partner of the French energy conglomerate Électricité de France, approached the Bakke family to propose building a wind farm, together they created Hoosac Wind LLC. In November 2004, the State of Massachusetts Department of Environmental Protection approved the proposed project. However, thorny issues plague the project including the presence of potentially vulnerable species of goldenrod in the vicinity of the proposed site, as well as the asserted danger to the migratory paths of birds and bats. Hoosac Wind achieved tentative approval from both Florida and Monroe after taking considerable amounts of wind-speed and direction data, along with avian, archeological, geological, and wildlife studies which were conducted as well. In January 2006, Hoosac Wind LLC was purchased by the British company PPM Energy for an estimated US$40 million, PPM was subsequently absorbed by Iberdrola Renewables.[4] Hoosac Wind LLC was renamed New England Wind LLC. Green Berkshires, an environmental organization opposed to wind energy projects in the Berkshire mountain range, had filed an appeal rejected by the State of Massachusetts Division of Administrative Law Appeals. As of May, 2008, the project was still under review post environmental standards challenges.[5] The project began construction in early 2012 and was completed in December 2012.[6]

Project details

[edit]

The project consists of 19 GE Wind Energy 1.5 MW wind turbines and is divided among two separate sites – nine turbines on Crum Hill in Monroe, and ten on Bakke MountaininFlorida, Massachusetts. Each turbine produces 1.5 MW, the site has a capacity to produce 28.5 MW; this is enough energy to supply approximately 10,000 average homes in the region annually. The towers are 213 feet (65 m) tall, with 121 feet (37 m) blades. From base to vertically positioned blade tip, they will be approximately 334 feet (102 m). The turbines begin generating energy at wind speeds as low as 8 mph (13 km/h), and produce the maximum power output when winds blow above 30 mph (48 km/h). The maximum rotor speed is 20 rpm. The project was built with turbines manufactured at facilities all across the U.S. The power generated is delivered to the New England grid through the local utility National Grid.[7]

Environmental impact

[edit]

The Hoosac Wind Power Project offsets approximately 100 million pounds of carbon dioxide per year relative to conventional electricity generation. That is equivalent to the estimated annual emissions produced by 9,400 cars or consuming more than 112,000 barrels of oil.[8]

Economic impact

[edit]

Approximately US$257,000 in annual payments in lieu of taxes are made to the host towns (US$135,000 to Florida, $122,000 to Monroe), escalating with inflation, amounting to approximately US$6.8 million over the life of the agreement. In addition, the towns host turbines on town-owned land, which will generate approximately US$3 million in revenue over the life of the project. The project created 3 permanent jobs, 140 temporary construction jobs at peak, and purchase many products and services locally. To date, the project has generated 70,098 local labor hours and nearly US$3.8 million in local spending.[9]

See also

[edit]

  • iconWeather portal
  • iconRenewable energy portal
  • References

    [edit]
    1. ^ "Hoosac Wind Project to face final hurdle". August 24, 2010. Retrieved January 15, 2014.
  • ^ "Hoosac Wind turbines to fire up soon". September 24, 2012. Retrieved January 15, 2014.
  • ^ "Hoosac Wind Project Nears Completion". September 10, 2012. Retrieved January 15, 2014.
  • ^ PPM Energy is Now Iberdrola Renewables[dead link] (May 1, 2008) Reuters.
  • ^ Stafford, Scott. "Florida, Monroe wind turbine project slows" (May 5, 2008) Berkshire Eagle.
  • ^ "Hoosac fact sheet" (PDF). December 3, 2012. Archived from the original (PDF) on August 18, 2013. Retrieved January 15, 2014.
  • ^ "GE 1.5 MW wind turbine" (PDF). March 2009. Retrieved January 15, 2014.
  • ^ "Hoosac fact sheet" (PDF). December 3, 2012. Archived from the original (PDF) on August 18, 2013. Retrieved January 15, 2014.
  • ^ "Hoosac Wind". December 3, 2012. Retrieved January 15, 2014.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Hoosac_Wind_Power_Project&oldid=1184541958"

    Categories: 
    Wind farms in Massachusetts
    Buildings and structures in Berkshire County, Massachusetts
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    All articles with dead external links
    Articles with dead external links from July 2021
    Articles with short description
    Short description matches Wikidata
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Wind farm articles using Infobox power station
    Pages using the Kartographer extension
     



    This page was last edited on 11 November 2023, at 01:42 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki